Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CNL-15-116, Ninth Progress Update on Improved Flood Mitigation System Project30 June 2015Ninth Progress Update on Improved Flood Mitigation System Project
ML15181A44629 June 2015IR 05000391/2015604; 05/16/2015; Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated Report and Notice of ViolationSafe Shutdown
Boric Acid
Non-Destructive Examination
Stroke time
Hydrostatic
Coatings
Condition Adverse to Quality
FLEX
Spent Fuel Pool Instrumentation
Moisture barrier
Maintenance Rule Program
L-11-011, Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies.29 June 2015Transmittal of Response to NRC Bulletin 2011-01, Mitigating Strategies.B.5.b Mitigating Strategies
Earthquake
IR 05000390/201560429 June 2015IR 05000391/2015604; 05/16/2015; Watts Bar Nuclear Plant Unit 2 Construction - NRC Integrated Report And Notice of ViolationSafe Shutdown
Boric Acid
Non-Destructive Examination
Stroke time
Hydrostatic
Coatings
Condition Adverse to Quality
FLEX
Spent Fuel Pool Instrumentation
Moisture barrier
Maintenance Rule Program
ML15173A11626 June 2015FRN for Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for HearingExemption Request
ML15173A11426 June 2015Letter for Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for HearingExemption Request
ML15173A09726 June 2015Acceptance Review Results for Requested License Amendment to Increase Tpbar ProductionOperator Manual Action
CNL-15-109, Cyber Security Plan25 June 2015Cyber Security PlanCyber Security
ML15175A50824 June 2015Watts Bar, Unit 2 - Transmits Unit 1/Unit 2 As-Constructed Fire Protection Report (TAC No. ME3091)
IR 05000390/201500922 June 2015IR 05000390/2015009 & 05000391/2015616; 3/30/2015 - 4/03/2015; Watts Bar Nuclear Plant Units 1 and 2; Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders & EmeFLEX
Significance Determination Process
Spent Fuel Pool Instrumentation
IR 05000390/201561622 June 2015IR 05000390/2015009 & 05000391/2015616; 3/30/2015 - 4/03/2015; Watts Bar Nuclear Plant Units 1 and 2; Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders & Emergency...FLEX
Significance Determination Process
Operability Determination
Spent Fuel Pool Instrumentation
ML15173A03322 June 2015Southern Alliance for Clean Energy'S Reply to Oppositions to Petition for Review of LBP-15-14 Denying Admission of a New Contention Concerning Tva'S Failure to Comply with 10 C.F.R. Section 5.34(b)(4)Safe Shutdown Earthquake
Earthquake
CNL-15-096, Tennessee Valley Authority (TVA) Response to NRC Regulatory Issue Summary 2015-0719 June 2015Tennessee Valley Authority (TVA) Response to NRC Regulatory Issue Summary 2015-07
CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)17 June 2015Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)Safe Shutdown
Ultimate heat sink
Offsite Circuit
CNL-15-121, Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit Operation17 June 2015Shutdown Technical Specifications for Component Cooling System and Essential Raw Cooling Water System to Support Dual Unit OperationSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Hydrostatic
VT-2
Offsite Circuit
IR 05000390/201540816 June 2015Watts Bar Nuclear Plant - U.S. Nuclear Regulatory Commission Security Inspection Report 05000391/2015408Affidavit
CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident16 June 2015Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentUltimate heat sink
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
CNL-15-104, Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency Plan15 June 2015Submittal of Revision 106, Appendix C to Central Emergency Control Center, Radiological Emergency PlanSafe Shutdown
Health Physics Network
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Post Accident Monitoring
Met Tower
Safeguards Contingency Plan
Battery sizing
Earthquake
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
Siren
CNL-15-114, CNL-15-114 - Watts Bar Unit 2 - Response to RAI Regarding Containment Inservice Inspection Program15 June 2015CNL-15-114 - Watts Bar Unit 2 - Response to RAI Regarding Containment Inservice Inspection ProgramNondestructive Examination
VT-2
Incorporated by reference
Pressure Boundary Leakage
CNL-15-093, Response to NRC Request to Supplement Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Radiological Protection and Radiological Consequences15 June 2015Response to NRC Request to Supplement Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Radiological Protection and Radiological ConsequencesOffsite Dose Calculation Manual
Anticipated operational occurrence
Tritium
CNL-15-101, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 1612 June 2015Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 16
ML15163A21412 June 2015Tennessee Valley Authority'S Answer Opposing Southern Alliance for Clean Energy'S Petition for Review of LBP-15-14
ML15163A14512 June 2015NRC Staff Answer Opposing the Southern Alliance for Clean Energy Petition for Review of Board Decision LBP-15-14Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
ML15160A40712 June 2015Issuance of Amendment Re. Application for TS Under Exigent Circumstances to Allow Temperature Indicator for Reactor Coolant System Loop 4 to Be Inoperable for the Remainder of Operating Cycle 13Safe Shutdown
Fire Protection Program
CNL-15-078, Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02)12 June 2015Response to NRC Request for Additional Information Related to Application to Modify Technical Specifications Regarding AC Sources - Operating (TS-WBN-13-02)Safe Shutdown
Qualified Offsite Circuit
Offsite Circuit
Coast down
ML15160A1839 June 2015Commission Memorandum and Order CLI-15-15
ML15156A8485 June 2015Declaration of Readiness for Watts Bar, Unit 2 Operational Readiness Assessment Team Inspection
CNL-15-112, Response to Draft RAI Regarding Watts Bar Nuclear Plant, Unit 1 Exigent Amendment5 June 2015Response to Draft RAI Regarding Watts Bar Nuclear Plant, Unit 1 Exigent AmendmentSafe Shutdown
Power change
ML14290A4863 June 2015Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures
ML15152A4653 June 2015Letter Regarding Public Notice of Application for Amendment to Facility Operating LicenseSafe Shutdown
ML15152A4733 June 2015Public Notice of Application for Amendment to Facility Operating LicenseSafe Shutdown
ML15155A4612 June 2015NRR E-mail Capture - Draft RAI for the WBN1 Exigent Amendment (MF6286)Safe Shutdown
ML15154A6532 June 2015NRR E-mail Capture - FW: Clarification Question for the WBN1 Exigent Amendment (MF6286)
IR 05000390/20154041 June 2015NRC Inspection of Unit 2 Cyber Security Milestones, (Inspection Report No. 05000391/2015406), Inspection of Unit 1 & Unit 2 Review of Power Reactor Target Sets, (Inspection Report No. 05000390/2015404) & Enforcement DiscretionEnforcement Discretion
Cyber Security
Significance Determination Process
Affidavit
IR 05000390/20154061 June 2015Watts Bar Nuclear Plant NRC Inspection Of Unit 2 Cyber Security Milestones, (Inspection Report No. 05000391/2015406), Inspection Of Unit 1 & Unit 2 Review Of Power Reactor Target Sets, (Inspection Report No. 05000390/2015404) & Enforcement DiscretionEnforcement Discretion
Cyber Security
Significance Determination Process
Affidavit
CNL-15-108, Technical Specification (TS) Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (WBN-TS-2015-12)29 May 2015Technical Specification (TS) Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (WBN-TS-2015-12)Safe Shutdown
Probabilistic Risk Assessment
Power change
ML15232A33228 May 2015NRR E-mail Capture - Draft Request for Additional Information MF6153Stroke time
CNL-15-092, Response to NRC Request to Supplement the Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03)27 May 2015Response to NRC Request to Supplement the Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03)Operator Manual Action
Scaffolding
TAC:MF527326 May 2015
ML15112A05126 May 2015Second Integrated Assessment Extension Letter
ML15119A53926 May 2015FRN Individual Notice of Opportunity for Hearing on License Amendment Request Cyber Security Bright-Line Demarcation Between the NRC and NERCCyber Security
Exemption Request
NRC-2015-0127, FRN Individual Notice of Opportunity for Hearing on License Amendment Request Cyber Security Bright-Line Demarcation Between the NRC and NERC26 May 2015FRN Individual Notice of Opportunity for Hearing on License Amendment Request Cyber Security Bright-Line Demarcation Between the NRC and NERCCyber Security
Exemption Request
ML15239A08326 May 2015NRR E-mail Capture - FW: Advanced Response - WBN ESEP Clarifying QuestionsSafe Shutdown Earthquake
FLEX
Earthquake
ML15146A46126 May 2015VR-SECY-15-0068: Watts Bar Nuclear Plant, Unit 2 - Review Status and Authority of the Director of the Office of Nuclear Reactor Regulation for Operating License Issuance
IR 05000390/201561322 May 2015IR 05000391/2015613; 04/06-10/2015; Watts Bar Nuclear Plant Unit 2 Construction - NRC Problem Identification and Resolution Inspection Report
IR 05000391/201561322 May 2015IR 05000391/2015613; 04/06-10/2015; Watts Bar Nuclear Plant Unit 2 Construction - NRC Problem Identification and Resolution Inspection ReportHydrostatic
Nondestructive Examination
Cyber Security
Foreign Material Exclusion
ML15125A33121 May 2015Summary of Meeting with Tennessee Valley Authority Regarding the Watts Bar Nuclear Plant, Unit 2 Operating License Application (Open Item Related to General Design Criterion 5 and Reactor Oversight Process Transition)Safe Shutdown
ML15110A40521 May 2015Summary of Category 1 Public Meeting with Tennessee Valley Authority on the Fire Protection Report for Watts Bar Nuclear Plant, Unit 2Fire Protection Program
ML15139A28919 May 2015NRR E-mail Capture - Acceptance Review Results for Request for Alternative on Third 10-year Interval and Inservice Test Program, TAC No. MF6191Stroke time
ML15138A45218 May 2015Sace Petition for Review of LBP-15-14Safe Shutdown
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake