Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
TAC:ME6693 | 30 June 2011 | ||
ML11231A618 | 30 June 2011 | Defueled Safety Analysis Report, Revision 8.0 | |
ML11230B348 | 30 June 2011 | Connecticut, Inc., Millstone Power Station Unit 1, 2 & 3, Updates to the Defueled Saftey Analysis Report and Final Safety Analysis Reports | |
ML11188A213 | 30 June 2011 | Request for Exemption from 10 CFR 50, Appendix R, Section Iii.G, Fire Protection of Safe Shutdown Capability | Safe Shutdown Boric Acid Fire Barrier Operator Manual Action Emergency Lighting Exemption Request Minimum staff Fire Protection Program Fire Watch |
ML111680460 | 30 June 2011 | Review of Commitment Change Report for 2009 | Backfit |
TAC:ME4254 | 30 June 2011 | ||
ML111671993 | 29 June 2011 | Request for Withholding Information from Public Disclosure for Millstone Power Station, Unit 3 (TAC No. 5389) | |
ML111800730 | 28 June 2011 | Connecticut, Inc., Virginia Electric and Power Company, Submission of Revision 11 of the Quality Assurance Topical Report | Fitness for Duty Shutdown Margin Non-Destructive Examination Commercial Grade Dedication Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification Condition Adverse to Quality Process Control Program License Renewal Fire Protection Program |
TAC:ME6648 | 28 June 2011 | ||
ML112030719 | 27 June 2011 | NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) | |
ML112030734 | 27 June 2011 | Draft - Outlines (Folder 2) | Shutdown Margin Operability Determination Downpower |
ML112030663 | 27 June 2011 | NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) | |
ML11180A183 | 27 June 2011 | 2011/06/27-Comment (54) of Mary Ellen Marucci, Supporting Petition for Rulemaking PRM-50-96, Regarding NRC Amend Its Regulations Regarding the Domestic Licensing of Special Material | |
ML111800499 | 27 June 2011 | 2010 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46, Kewaunee, Millstone, North Anna, Surry | |
ML111751727 | 24 June 2011 | Notice of Public Meeting with Dominion Nuclear Connecticut, Inc., Millstone Power Station, Unit 2, to Discuss a Preliminary White Finding That Was Identified During a Special Inspection | Preliminary White Finding |
Press Release-I-11-024, Millstone Regulatory Conference Postponed; Now Scheduled for July 19th | 24 June 2011 | Press Release-I-11-024: Millstone Regulatory Conference Postponed; Now Scheduled for July 19th | |
ML111790114 | 23 June 2011 | Requalification Program Inspection - Millstone Station Unit 3 | |
ML11179A025 | 23 June 2011 | Request for Additional Information Regarding Relief Request RR-04-11, Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 for the Fourth 10-Year Inspection Interval | Internal Flooding |
ML11166A134 | 22 June 2011 | Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) | |
ML111750219 | 22 June 2011 | NRC Inspection Findings Related to Closed Cooling Water Systems (1/1/2004 to 6/22/2011) | Condition Adverse to Quality Significance Determination Process |
Press Release-I-11-023, NRC to Hold Regulatory Conference on June 30 Regarding Preliminary White Finding Issued to Millstone 2 Nuclear Plant | 21 June 2011 | Press Release-I-11-023: NRC to Hold Regulatory Conference on June 30 Regarding Preliminary White Finding Issued to Millstone 2 Nuclear Plant | Preliminary White Finding Power change |
ML111650357 | 15 June 2011 | Notice of Licensee Meeting with Dominion Nuclear Connecticut, Inc. to Discuss Preliminary White Finding Identified During Special Inspection at Millstone Unit 2, Completed in April 2011 | Preliminary White Finding |
ML111590890 | 14 June 2011 | Request for Additional Information Regarding Relief Request for Implementation of a Risk-Informed Inservice Inspection Program | Internal Flooding |
ML111810155 | 14 June 2011 | Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information | |
ML111600216 | 13 June 2011 | Exhibit D (Part 2): Millstone 2001 Safstor Calculation | |
ML111600220 | 13 June 2011 | Exhibit D (Part 3): Millstone 2001 Safstor Cost Analysis (Normal Dollars) | |
ML111600210 | 13 June 2011 | Exhibit D (Part 1): Excerpt from the Millstone License Transfer Application Part 2, August 31, 2000 | |
ML11172A189 | 9 June 2011 | NRC Bulletin 2011-01 Mitigating Strategies Thirty-Day Response | B.5.b Mitigating Strategies |
TAC:ME6450 | 9 June 2011 | ||
ML11167A114 | 8 June 2011 | Transcript of 10 CFR 2.206 Petition Review Board Conference Call Re GE Mark 1 Bwrs, June 08, 2011, Pages 1-74 | Earthquake Hardened vent Chernobyl Backfit |
ML11165A015 | 6 June 2011 | Request for Regulatory Conference NRC Special Inspection Report 05000336/2011008; Preliminary White Finding | Preliminary White Finding |
ML11159A030 | 3 June 2011 | Potential Defect in Certain Velan Supplied Globe Valves | |
ML111540119 | 3 June 2011 | RAI for Millstone 2 RR-04-11 | |
ML112030794 | 27 May 2011 | Draft Operating Exam (Sections a, B, and C) (Folder 2) | Safe Shutdown Boric Acid Fitness for Duty Shutdown Margin Loop seal Grab sample Emergency Lighting Job Performance Measure Fatigue Rule Pressure Boundary Leakage Power change |
ML11159A025 | 24 May 2011 | Response to Request for Additional Information Regarding the Steam Generator Tube Inservice Inspection Report for the End of Cycle 13 | Boric Acid Weld Overlay |
TAC:ME6365 | 19 May 2011 | ||
ML11152A148 | 19 May 2011 | Core Operating Limits Report, Cycle 21 | Shutdown Margin |
ML11143A063 | 17 May 2011 | Submittal of Consolidated Cyber Security Plan and RAI Response | Cyber Security |
ML111380415 | 17 May 2011 | Connecticut, Inc. and Virginia Electric and Power Company - Fitness-For-Duty Program; Annual Performance Data Report Revision of Fatigue Management Information | Fitness for Duty |
ML11136A185 | 16 May 2011 | NRR E-mail Capture - ME5494; ME5501 and 02; ME5506 and 07; ME5540 and 42 - 2011 Decommissioning Funding Status (DFS) Report - Request for Additional Information (RAI) - Final Version | |
Press Release-I-11-015, NRC to Hold Two Public Meetings on May 25th in Waterford, Conn., to Discuss Annual Assessment of Millstone Nuclear Power Plant | 16 May 2011 | Press Release-I-11-015: NRC to Hold Two Public Meetings on May 25th in Waterford, Conn., to Discuss Annual Assessment of Millstone Nuclear Power Plant | |
ML112030746 | 13 May 2011 | Draft - Written Exam (Folder 2) | Hot Short Boric Acid Shutdown Margin High Radiation Area Slow transfer Locked High Radiation Area Earthquake Downpower Coast down |
TAC:U01832 | 13 May 2011 | ||
IR 05000245/2011009 | 13 May 2011 | IR 05000245/2011009, 05000336/2011009, and 05000423/2011009; 04/01/2011 - 04/29/2011; Millstone Power Station, Units 1, 2 and 3; Temporary Instruction 2515/183 - Followup to the Fukushima Daiichi Nuclear Station Fuel Damage Event | B.5.b Seismically rugged Design basis earthquake Severe Accident Management Guideline |
ML110690794 | 10 May 2011 | Summary of Meeting with Dominion Nuclear Connecticut, Inc. Discussing Millstone Power Station, Units 2 and 3 Licensing Activities | VT-2 Condition Adverse to Quality |
ML110980538 | 9 May 2011 | Cyber Security Plan Implementation Schedule | Cyber Security |
IR 05000336/2011002 | 9 May 2011 | IR 05000336-11-002 & 05000423-11-002; Dominion Nuclear Connecticut, Inc.; 01/01/2011-03/31/2011; Millstone Power Station Unit 2 and Unit 3, Flood Protection Measures, Post-Maintenance Testing and NRC Integrated Inspection Report | |
ML11159A003 | 6 May 2011 | NRR E-mail Capture - Millstone Power Station Units 1, 2, and 3 - Preliminary RAIs for 10 CFR 26.205(c) and (D) Exemption Request | Fitness for Duty Exemption Request |
ML111250109 | 5 May 2011 | Notice of Public Meeting | |
ML111250122 | 5 May 2011 | Notice of Meeting with Dominion Nuclear Connecticut, Inc., Millstone, to Discuss Nrc'S Assessment of Safety Performance for Calendar Year 2010 |