ML11180A183

From kanterella
Jump to navigation Jump to search
Comment (54) of Mary Ellen Marucci, Supporting Petition for Rulemaking PRM-50-96, Regarding NRC Amend Its Regulations Regarding the Domestic Licensing of Special Material
ML11180A183
Person / Time
Site: Millstone 
Issue date: 06/27/2011
From: Marucci M
- No Known Affiliation
To:
NRC/SECY/RAS
SECY RAS
References
76FR26223 00054, NRC-2011-0069, PRM-50-96
Download: ML11180A183 (2)


Text

PRM-50-96 DCE.

(76FR26223)

DOCKETED Rulemaking Comments USNR JUlIr 40, LU I I kt.UU pill)

From:

Mary Ellen Marucci [mary.marucci@maine.edu]

Sent:

Monday, June 27, 2011 7:48 PM RULEMAKINGS AND To:

Rulemaking Comments ADJUDICATIONS STAFF

Subject:

Comment in support of PRM-50-96 NRC-2011-0069

Dear Secretary,

Remember the forth of July, 1992 and the millstone 2 peool situation.

Just what if they didn't get the power back in time?

didn't find out the levels were down as their sensors were also down without the power?

Just what if?

I am writing in support of PRM 50-96 (NRC-2011-0069) submitted by Thomas Popik and the Foundation for Resilient Societies.

This very prescient petition for rulemaking would require utilities to install reliable and renewable backup power systems, for a period of up to two years, to ensure cooling of irradiated fuel pools in the event of an extended loss of offsite power.

The Fukushima catastrophe demonstrates clearly the consequences of a loss of offsite power--

to fuel pools and nuclear reactors alike. The NRC obviously must take substantive and speedy steps to address this issue.

The typical nuclear facility includes battery backup power that would last 4-8 hours, plus emergency diesel generators. While these generators were inoperable at Fukushima, and the accidents there took place in a relatively short amount of time, these generators are not designed to operate for extended periods of time.

PRM 50-96 was spawned by concern over large-scale solar flares that could cause long power outages in the U.S.

As the Washington Post reported on June 21, 2011, a 2008 National Academy of Sciences study warned that a major solar storm "could knock out power in parts of the northeastern and northwestern United States for months, even years."

No U.S. nuclear reactor or fuel pool could withstand such a lengthy loss of power. Immense radiation releases would be certain.

Given the events at Fukushima, it appears nuclear facilities are not able to withstand power outages for even a fraction of that time. Thus, there is considerable urgency to improving back-up power systems.

I urge the NRC to quickly approve PRM 50-96 and to amend this petition to include suitable back-up power supplies for all nuclear reactors and fuel cycle facilities as well as the irradiated fuel pools.

Remember the forth of July, 1992 and the millstone 2 peool situation.

Just what if they didn't get the power back in time?

didn't find out the levels were down as their sensors were also down without the power?

Just what if?

Thank you, Mary Ellen Marucci CCMN TEMPLATE = SECY-067 DS10 CCMN

28 Plea.sant Street, Apt.201 28 Pleasant St, Apt 201 Fort Kent, ME 04743 2