Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09071033226 June 2009Issuance of Amendment Technical Specification Change TSTF-423, Risk-Informed Modification to Selected Required Action End States for BWR Plants, Using Consolidate Line Item Improvement ProcessSafe Shutdown
Unanalyzed Condition
Ultimate heat sink
Probabilistic Risk Assessment
Large early release frequency
Recently irradiated fuel
Offsite Circuit
TAC:MD585926 June 2009
RS-09-074, License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test Assemblies26 June 2009License Amendment Request to Modify Clinton Power Station Facility Operating License in Support of the Use of Isotope Test AssembliesSafe Shutdown
Shutdown Margin
Anticipated operational occurrence
Abnormal operational transient
Foreign Material Exclusion
Feedwater Controller Failure
MELLLA
Control of Heavy Loads
Fuel cladding
GOTHIC
Power Uprate
Overexposure
Affidavit
ML09167112323 June 2009Summary of June 2, 2009, Conference Call with Exelon Generation Company, LLC, on the Cobalt Isotope Generation Project
RS-09-078, Response to Request for Additional Information Related to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation23 June 2009Response to Request for Additional Information Related to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation InstrumentationOffsite Dose Calculation Manual
Safe Shutdown Earthquake
Power change
ML09173038922 June 2009Emergency LAR RAISafe Shutdown Earthquake
U-603899, Correction to 2005 Annual Radioactive Effluent Release Report22 June 2009Correction to 2005 Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
RS-09-077, Request for Processing an Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building..20 June 2009Request for Processing an Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building..Temporary Modification
Downpower
RS-09-073, Request for NRC Approval of Changes to the Clinton Power Station Emergency Plan19 June 2009Request for NRC Approval of Changes to the Clinton Power Station Emergency PlanHigh Radiation Area
TAC:ME172719 June 2009
ML09160054818 June 2009Company, Llc'S Status of Decommissioning Funding Assurance
TAC:ME050318 June 2009
ML09169016716 June 2009Submittal of Relief Requests Associated with the Third Inservice Testing IntervalStroke time
Incorporated by reference
Scaffolding
Grace period
RS-09-079, Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature15 June 2009Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building TemperatureReactor Vessel Water Level
Mission time
Probabilistic Risk Assessment
Fuel cladding
TAC:ME149915 June 2009
ML09139017410 June 2009Company - Branch Chief Reassignment
ML0914901429 June 2009Notice of Meeting with Exelon Generation Company on Licensing Practices and Processes
ML09149008029 May 2009May 11, 2009 Summary of Open House Public Meeting Discussed NRC Activities, Nuclear Power Issues, and the Clinton Power Station 2008 End-of-Cycle Plant Performance AssessmentOpen House
IR 05000461/200900720 May 2009IR 05000461-09-007; on 03/30/2009 - 04/17/2009; Clinton Power Station; Identification and Resolution of ProblemsHigh Radiation Area
Locked High Radiation Area
Significance Determination Process
ML09128017119 May 2009Withdrawal Notice Regarding Bulk Isotope Production LARAnticipated operational occurrence
IR 05000461/200940214 May 2009NRC Security Baseline Inspection Report 05000461/2009-402(DRS)Contraband
ML09135029514 May 2009IR 05000461-09-402; 01/20/2009 - 01/22/2009, Exelon Nuclear Corporate; 04/06/2009 - 04/10/2009; Clinton Power Station; Routine Security Baseline Inspection - Cover Letter
ML09135046314 May 2009Summary of Non-Public Meeting with Clinton to Discuss End-Of-Cycle Security Performance for Cy 2008
ML09132043211 May 2009Withdrawal of Request to Modify Facility Operating License in Support of Bulk Isotope Generation Project
RS-09-064, Clinton, Unit 1, Withdrawal of Request to Modify Facility Operating License in Support of Bulk Isotope Generation Project11 May 2009Clinton, Unit 1, Withdrawal of Request to Modify Facility Operating License in Support of Bulk Isotope Generation Project
ML09140033211 May 2009Slides Presented at the Clinton 2008 EOC Performance/Reactor Issue Open HouseOpen House
RS-09-058, Request for Proposed Alternative to 10 CFR 50.55a Post Weld Heat Treatment Requirements for Piping Replacements (Relief Request No. 1203)5 May 2009Request for Proposed Alternative to 10 CFR 50.55a Post Weld Heat Treatment Requirements for Piping Replacements (Relief Request No. 1203)Incorporated by reference
TAC:ME18785 May 2009
Press Release-III-09-012, NRC Schedules Open House to Discuss Nuclear Power Issues and 2008 Performance of Clinton Nuclear Power Plant4 May 2009Press Release-III-09-012: NRC Schedules Open House to Discuss Nuclear Power Issues and 2008 Performance of Clinton Nuclear Power PlantOpen House
U-603893, Annual Radiological Environmental Operating Report for January 1 Through December 31, 200830 April 2009Annual Radiological Environmental Operating Report for January 1 Through December 31, 2008Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
ML09071033030 April 2009Corp., Request for Withholding Information from Public Disclosure
U-603891, 2008 Annual Radioactive Effluent Release Report29 April 20092008 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
ML09119045428 April 2009Non-Public Meeting to Discuss the 2008 End-of-Cycle Plant Security Performance Assessment of Clinton Power Station
RS-09-052, Submittal of Revision to Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans27 April 2009Submittal of Revision to Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans
TAC:ME115322 April 2009
IR 05000461/200900222 April 2009IR 05000461-09-002, 01/01/09 - 03/31/09, Clinton Power Station, Integrated Inspection ReportFire Barrier
Stroke time
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Process Control Program
Power change
RS-09-042, Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS Changes22 April 2009Request for Amendment to Technical Specifications Section 5.5.6, Inservice Testing Program to Incorporate Previously NRC-Approved Generic TS ChangesIncorporated by reference
ML09106001622 April 2009Summary of the Category 1 Pre-Application Meeting with Exelon to Discuss a Proposed License Amendment Request Regarding Cobalt Production at Clinton Nuclear Power Station, Unit No. 1
ML09112018221 April 2009Notice of Public Meeting, to Discuss NRC Activities, Nuclear Power Issues, and Clinton Station Performance for the 2008 Calendar Year with the PublicOpen House
ML09112017821 April 2009Public Meeting/Open House to Discuss NRC Activities, Nuclear Power Issues, and 2008 End-of-Cycle Performance Assessment for Clinton Station
IR 05000461/200940410 April 2009NRC Supplemental Inspection Report 05000461/2009404(DRS)
ML09106070810 April 2009IR 05000461-09-404, (Drs), on 02/23/2009 - 02/26/2009, for Clinton Power Station, Supplemental Inspection IP 95001 - Cover Letter
RS-09-014, License Amendment Request to Modify Facility Operating License in Support of Bulk Isotope Generation Project8 April 2009License Amendment Request to Modify Facility Operating License in Support of Bulk Isotope Generation ProjectShutdown Margin
Anticipated operational occurrence
ML0907108682 April 2009Licensed Amendment, Adopted TSTF-2, Relocate the 10-year Sediment Cleaning of the Fuel Oil Storage Tank to Licensee Control
ML0909202561 April 2009Annual Property Insurance Status Report