RS-09-052, Submittal of Revision to Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans

From kanterella
Jump to navigation Jump to search
Submittal of Revision to Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans
ML091210080
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, 05000101
Issue date: 04/27/2009
From: Simpson P
Exelon Infrastructure Services, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-09-052
Download: ML091210080 (15)


Text

SAF[EGUf.U~DS f.NFORMAT~ON Exelon Nuclear www.exeloncorp.com 4300 Winfield Road Nuclear Warrenville,lL 60555 RS-09-052 10 CFR 50.54(p)(2) 10 CFR 50.4(b)(4)

April 27, 2009 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC' 20555-0001 Braidwood Station, Units 1 and 2 FaCility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and 50-457 Byron Station, Units 1 and 2 .

Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. 50-454, 50-455 and 72-68 Clinton Power Station, Units 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 1, 2, and 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos.50-010, 50-237. 50-249 and 72-37 laSalle County Station, Units 1 and 2 Facility Operating License Nos.' NPF-11 and NPF-18 NRC Docket Nos. 50-373, 50-374 and 72-70 "Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352, 50-353, and 72-65 Oyster Creek Generating Station, Unit 1 Facility Operating License No. DPR-16 Renewed NRC Docket No. 50-219 and 72-15 IJ M-~:>b I SAFEGUARDS INFORMATION (J{fA S C)O I ATTACHMENTS 1 11 CQNTAUI SAFEGU,6RDS INFORMATION Sf/09 f.-J.t:..P-..

UPON SEPARATION THIS PAGE IS DECONTROLLED

  • SAFEGUARDS INFORMATION April 27, 2009 U. S. NuclearRegulatory Commission Page 2 Peach Bottom Atomic Power Station, Units'1, 2, and 3 Facility Operating License No. DPR-12 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-171. 50-277and 72-29 Quad Cities Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. OPR-29 and OPR-30 Renewed NRC Docket Nos. 50-254, 50-265 and 72-53 Three Mile Island Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket 1\10. 50-289

Subject:

Exelon Revision to Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans

Reference:

Letter from Richard P. Correia (NRC) to Chris Earls (NEI), Nuclear Energy Institute 03-01, "Nuclear Power Plant Access Authorization Program,"

Revision 2, dated December 11 , 2008 In accordance with the provision of 10 CFR 50.54, "Conditions of licenses," paragraph (p)(2), Exelon Generation Company, LLC (EGC) is submitting changes to the Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans for the stations listed above. Changes to these documents were implemented on March 30, 2009. In accordance with 10 CFR 50.54(p)(2), EGC is submitting these changes within two months of implementation (Le., no later than May 29, 2009).

The Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans have been revised to incorporate generic references to NEI 03-01, Revision 2. In the referenced letter, the NRC concluded NEI 03-01 is an acceptable method to comply with the requirements of subpart C of 10 CFR 26.

In addition, Revision 6 of the Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, incorporated changes to reflect the addition of an independent spent fuel storage installation within the Protected Area. The implementation date for this revision was March 30, 2009.

EGC has concluded that the changes do not decrease the safeguards effectiveness of the Nuclear Station Security Plans, Training and Qualification Plans, and Safeguards Contingency Plans.

SAFEGUARDS INFORMATION GOr1 .~ L ATTACHMENTS 1 11 CONTAIN SAFIiGUARgS INFORMATION 7 £15/'0 ~

UPON SEPARATION TMIS PAGE IS QI5CONTROlUm

SAFEGUARDS INFORMATION April 27, 2009 U. S. Nuclear Regulatory Commission Page 3 Attachments 1 through 11 contain Safeguards Information. Therefore, EGC requests that this information be withheld from public disclosure in accord~nce with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (d)(1), and 10 CFR 73.21, "Requirements for the protection of safeguards information," paragraph (b)(1 )(i).

The NRC Regional Administrators are receiving only the attachments for stations within the respective NRC Region consistent with 10 CFR 50.4.

Should you have any questions concerning this letter, please contact Mr. Benjamin E.

Brooks at (630) 657-2931.

wr.

Respectfully,

\

Patrick R. Simpson Manager - Licensing Attachments:

1. Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 (Contains Safeguards Information)
2. Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency plan, Revision 6 (Contains Safeguards Information)
3. Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 (Contains Safeguards Information)
4. Clinton Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 6 (Contains Safeguards Information)
5. Dresden Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 (Contains Safeguards Information)
6. LaSalle County Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 9 (Contains Safeguards Information)
7. Limerick Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 6 (Contains Safeguards Information)

. SAFEGUARDS INFORMATION ATTACHMENTS 1 11 CONTAIN SAFiQUARDS INpORMATJON UPON SEPARATION THIS PAQi IS DeCONTROLLED

SAFEGUARDS INFORMATION April 27, 2009 U. S. Nuclear Regulatory Commission Page 4

8. Oyster Creek Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 8 (Contains Safeguards Information)
9. Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 6 (Contains Safeguards Information)
10. Quad Cities Nuclear Power Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 6 (Contains Safeguards Information)
11. Three Mile Island Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 8 (Contains Safeguards Information) cc: Regional Administrator - NRC Region III Regional Administrator- NRC Region I SAFEGUARDS INFORMATION ATTACHMliNTS 1 11 CONTAIN SAl&liQUARgS INFORMATION UPON SEPARATION TIolIS PAS&: IS 9ECONTnOLLED

SAFEGUARDS INFORMATION ATTACHMENT 1 Braidwood Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 (Contains Safeguards Information)

SAFEGUARDS INFORMATION 9~ v~

ATTACHMENTS 1 11 CONTAIN SAFEGUARDS INfORM

. UPON SEPARATION THIS PAGE IS DECONTROLLED ATJO~ -~,

SAFEGUARDS INFORMATION ATTACHMENT 2 Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 6 (Contains Safeguards Information)

SAFEGUARDS INFORMATION AlTAC""M&:NTS 1 11 CONTAIN SAFEGUARDS INFORMATION

  • UPON 8IiPP,RATIQN T""18 PAtSli 18 QIiCONTROLbED

SAFEGUARDS I~FORMATION ATTACHMENT 3 Byron Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 (Contains Safeguards Information)

SAFEGUARDS INFORMATION ATTACHMENTS 1 11 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS.PAGE IS DECONTROLLED

  • SAFEGUARDS INFORMATION ATTACHMENT 4 Clinton Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 6 (Contains Safeguards Information)

SAFEGUARDS INFORMA"FION ~11 S/s/o7 .

ArrACHMENTS 1 . 11 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION TillS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 5

. \ .

Dresden Nuclear Power Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 7 (Contains Safeguards Information)

SAFEGUARDS INFORMATION ATTACMMENTS 1 11 CONTAIN SAIiiEGUARDS INIiiORMATION UPON SEPARATION TillS PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 6 LaSalle County Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 9 (Contains Safeguards Information)

SAFEGUARDS INFORMATION* (ftfA S/s/o?

ATTACHMENTS 1 11 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION THIS PAGE IS E>EGONTROllED

. SAFEGUARDS INFORMATION ATTACHMENT 7 Limerick Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 6 (Contains Safeguards Information)

SAFEGUARDS INFORMATION ATTACliMENTS 1

  • 11 CONTAIN SAFEGUARDS INFORMATION

. UPON SEPARATION THIS PA8E IS DECONTROLLED

  • SAFEGUARDS INFORMATION' ATTACHMENT 8 Oyster Creek Generating Station Security Plan, Training and Qualification. Plan, and Safeguards Contingency Plan, Revision 8 (Contains Safeguards Information)

SAFEGUARDS INFORMATION

- AITACt-fMENTS 1

  • 11 CONTAIN SAFEGUARDS INFORMATION UPON SEPARATION TI liS PAGE IS BECONTROLLED

SAFEGUARDS INFORMATION ATTACHMENT 9 Peach Bottom Atomic Power Station Security Plan, Training and Qualification Plan, an9 Safeguards Contingency Plan, Revision 6 (Contains Safeguards Information)

. SAFEGUARDS INFORMATION Gt£~ S/s/o ~

ATTAOIIMENTS 1 11 OONTAIN SAFEGUARDS INFORMATION

. UPON SEPARATION TillS PAGE IS DEOONTROLLED

SAFEGUARDS INFORMATION

.ATTACHMENT 10 Quad Cities Nuclear Power Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 6 (Contains Safeguards Information)

\ . SAFEGUARDS INFORMATION ATTACHMEN"FS 1 11 CONTAIN SAFEGUARDS INFORMATION

. UPON SEPARATION TillS PAGE IS ,DECONTROLLED

. SAFEGUARDS INFORMATION ATTACHMENT 11 Three Mile Island Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 8 (Contains Safeguards Information) .

. SAFEGUARDS INFORMATION ytJ/1 S/slo7

. ATTACHMENTS 1 11 CONTAIN SAFEGUARDS INFORMATION

. UPON SEPARATION TillS PAGE IS DECONTROLLED