Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NOC-AE-02001338, May 2002 Monthly Operating Report for South Texas Project, Units 1 & 213 June 2002May 2002 Monthly Operating Report for South Texas Project, Units 1 & 2
NOC-AE-02001349, Operator Licensing National Examination Schedule12 June 2002Operator Licensing National Examination ScheduleGeneric Fundamentals Examination
ML0402801876 June 2002Letter to Mullikin, NRC from Sullivan, Brookhaven National Laboratory, Re Triennial Fire Protection Baseline Inspection, South Texas Project Units 1 and 2. IR 05000498-02-003 and 05000499-02-003Hot Short
Safe Shutdown
Fire Barrier
Fire Protection Program
NOC-AE-02001334, Technical Specification Bases Changes5 June 2002Technical Specification Bases ChangesAnticipated operational occurrence
Fuel cladding
ML0215006265 June 2002Ltr, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Boundary Intregrity, 15-Day Response
TAC:MB45805 June 2002
ML04166043529 May 2002Letter to Kanavos, STP from Banning, Framatome, Recommended Scope and Schedule to Resolve NRC Audit Concerns Related to Operator Action IssuesSafe Shutdown
NOC-AE-02001316, Supplementary Response to NRC Order Modifying Licenses EA-02-02628 May 2002Supplementary Response to NRC Order Modifying Licenses EA-02-026
NOC-AE-02001321, Request for Technical Specification Bases Changes, TS Pages B 3/4 3-1 & B 3/4 3-2b Revised to Incorporate Information Re Relaxation of Reactor Trip System & Engineered Safety Features Actuation System Allowed Outage Time28 May 2002Request for Technical Specification Bases Changes, TS Pages B 3/4 3-1 & B 3/4 3-2b Revised to Incorporate Information Re Relaxation of Reactor Trip System & Engineered Safety Features Actuation System Allowed Outage TimeShutdown Margin
Ultimate heat sink
Offsite Circuit
NOC-AE-02001246, Application for Amendment to Relocate Shutdown Margin Limits from TS to COLR Report & Modify Action Statements Consistent with NUREG-143123 May 2002Application for Amendment to Relocate Shutdown Margin Limits from TS to COLR Report & Modify Action Statements Consistent with NUREG-1431Shutdown Margin
NOC-AE-02001268, Supplement to License Amendment Request Regarding Missed Surveillances Using Consolidated Line Item Improvement Process (CLIIP)23 May 2002Supplement to License Amendment Request Regarding Missed Surveillances Using Consolidated Line Item Improvement Process (CLIIP)Time of Discovery
Anticipated operational occurrence
Missed surveillance
NOC-AE-02001333, License Amendment Request, Proposed Changes to Technical Specifications 3.7.1.5 & 3.7.1.723 May 2002License Amendment Request, Proposed Changes to Technical Specifications 3.7.1.5 & 3.7.1.7
NOC-AE-02001315, Conditional Exemption from Measurement of End of Life Moderator Temperature Coefficient23 May 2002Conditional Exemption from Measurement of End of Life Moderator Temperature CoefficientShutdown Margin
NOC-AE-02001272, Application for Amendment to Several Sections of TS & Unit 2 Operating License to Delete Information Specific to Model E Steam Generators23 May 2002Application for Amendment to Several Sections of TS & Unit 2 Operating License to Delete Information Specific to Model E Steam GeneratorsShutdown Margin
Operating Basis Earthquake
Process Control Program
Pressure Boundary Leakage
NOC-AE-02001332, License Amendment Request Proposed Amendment to Technical Specification 3/4.3.5, Atmospheric Steam Relief Valve Instrumentation.22 May 2002License Amendment Request Proposed Amendment to Technical Specification 3/4.3.5, Atmospheric Steam Relief Valve Instrumentation.Anticipated operational occurrence
ML02177031622 May 2002Attachment 4, E-Mail from South Texas Project Response ILRT Extension RAIs Dated May 22, 2002
ML02150043121 May 2002Comment (4) Submitted by STP Nuclear Operating Co., Alex P. Kent, on Proposed Rule PR-50 Regarding Incorporation by Reference of ASME BPV & OM Code CasesIncorporated by reference
Backfit
NOC-AE-02001329, Suspension of Review of Application for Order21 May 2002Suspension of Review of Application for Order
TAC:MB214021 May 2002
NOC-AE-02001326, Additional Information to Support Request for Approval of Proposed Change to Technical Specification 3.9.4, Containment Building Penetrations16 May 2002Additional Information to Support Request for Approval of Proposed Change to Technical Specification 3.9.4, Containment Building PenetrationsSafe Shutdown
Tornado Missile
Time to boil
Tornado Generated Missile
NOC-AE-02001317, Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity.16 May 2002Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity.Boric Acid
VT-2
NOC-AE-02001322, April 2002 Monthly Operating Report for South Texas Project, Units 1 & 213 May 2002April 2002 Monthly Operating Report for South Texas Project, Units 1 & 2
NOC-AE-02001325, Revision 1 to Unit 1 Cycle 11 Core Operating Limits Report13 May 2002Revision 1 to Unit 1 Cycle 11 Core Operating Limits Report
NOC-AE-02001318, STP Nuclear Operating Co., Units 1 and 2 - Changes to Emergency Plan Implementing Procedures6 May 2002STP Nuclear Operating Co., Units 1 and 2 - Changes to Emergency Plan Implementing ProceduresFitness for Duty
High winds
Met Tower
Temporary Modification
Severe Accident Management Guideline
Deep Dose Equivalent
ML0212203232 May 2002NRC Region IV & South Texas Project Meeting Notice Business Plan, Planned Org Restructuring, Station Focus Areas, & Steam Generator Replacement
NOC-AE-02001314, Annual Environmental & Annual Radiological Environmental Operating Reports29 April 2002Annual Environmental & Annual Radiological Environmental Operating ReportsOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
NOC-AE-02001313, STP Nuclear Operating Co., Units 1and 2, Changes to Emergency Plan Implementing Procedures29 April 2002STP Nuclear Operating Co., Units 1and 2, Changes to Emergency Plan Implementing ProceduresSafe Shutdown
Unanalyzed Condition
Fitness for Duty
Health Physics Network
Deep Dose Equivalent
Fuel cladding
ML02100070325 April 2002Withholding Ltr, 10 CFR 2.790 Concerning 1.4 Percent Power Uprate (Tac Nos MB2899 and MB2903)
ML02101016025 April 2002Withholding Ltr, Affidavit Dated June 21, 2001 Concerning 1.4 Percent Power Uprate (CAW-01-1466) (Tac Nos MB2899 and MB2903)
ML03115009023 April 20024/23/03, STP, Units 1 and 2, Relief Request, RR-ENG-2-27, Rev. 3, Re. RPV Head Penetration Canopy Seal Welds Repair/ReplacementBoric Acid
Weld Overlay
Nondestructive Examination
Incorporated by reference
Liquid penetrant
TAC:MB839823 April 2002
NOC-AE-02001307, Fire Hazards Analysis Report, Amendment 1422 April 2002Fire Hazards Analysis Report, Amendment 14Safe Shutdown
Boric Acid
Fire Barrier
Fire Protection Program
Press Release-02-051, NRC Approves Power Uprate for South Texas Project, Units 1 & 222 April 2002Press Release-02-051: NRC Approves Power Uprate for South Texas Project, Units 1 & 2
NOC-AE-02001308, STP Nuclear Units 1 & 2 Changes to Emergency Plan Implementing Procedures22 April 2002STP Nuclear Units 1 & 2 Changes to Emergency Plan Implementing ProceduresEarthquake
NOC-AE-02001306, Extension of Implementation Time for Amendment Nos. 136 & 125, Relaxation of Allowed Outage Times & Bypass Test Times for Instrumentation18 April 2002Extension of Implementation Time for Amendment Nos. 136 & 125, Relaxation of Allowed Outage Times & Bypass Test Times for Instrumentation
ML02115046518 April 2002Errata to Amendments 138 and 127 to Licenses NPF-76 and NPF-80
ML02114009218 April 2002Attachment 12, E-Mailed on April 18, 2002, (Docket Nos. 50-498 and 50-499). Draft RAI for ILRT Interval Extension Amendment
ML02110000318 April 2002Letter Re Correction of Administrative Errors and Omissions Regarding Amendments 138 and 127 Approving Uprated Core Thermal Power
NOC-AE-02001277, Project Comprehensive Cultural Assessment17 April 2002Project Comprehensive Cultural Assessment
ML02087056615 April 2002Meetingsummary with Stars and the NRC to Inform the NRC About Current Stars ActivitiesMissed surveillance
NOC-AE-02001274, Technical Specification Bases Change15 April 2002Technical Specification Bases ChangeOffsite Circuit
IR 05000498/200100812 April 2002IR 05000498/2001-008; IR 05000499/2001-008; on 12/29/2001 - 3/23/2002; STP Nuclear Operating Company; South Texas Project Electric Generating Station; Units 1 & 2. Integrated Res/Reg Rpt; Event Fwp, Problem Identification and ReportingFire Barrier
Stroke time
Enforcement Discretion
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Operability Determination
Unidentified leakage
ML02106023612 April 2002Technical Specifications, Amendment Nos. 138 and 127 Approving Uprated Core Thermal Power and Revising the Associated Technical Specifications (Tac Nos. MB2899 and MB2903)Shutdown Margin
Process Control Program
TAC:MB289912 April 2002
ML02080026312 April 2002Amendment Nos. 138 and 127, Approving Uprated Core Thermal Power and Revising the Associated Technical Specifications (Tac Nos. MB2899 and MB2903)Safe Shutdown
Shutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Exemption Request
Turbine Missile
Fuel cladding
TAC:MB21369 April 2002
ML0209203599 April 2002RAI, Risk-Informed Inservice Testing (Tac Nos. MB2136 and MB2137)Safe Shutdown
Probabilistic Risk Assessment
Large early release frequency
Exemption Request
Power-Operated Valves
NOC-AE-02001298, March 2002 Monthly Operating Report for South Texas Project, Units 1 & 28 April 2002March 2002 Monthly Operating Report for South Texas Project, Units 1 & 2
ML0209502975 April 2002Annual Performance Assessment Meeting for South Texas Project Electric Generating Station
NOC-AE-02001290, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.2 April 2002Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity.Boric Acid
Reactor Vessel Water Level
VT-2
Condition Adverse to Quality
Pressure Boundary Leakage