Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
NOC-AE-02001338, May 2002 Monthly Operating Report for South Texas Project, Units 1 & 2 | 13 June 2002 | May 2002 Monthly Operating Report for South Texas Project, Units 1 & 2 | |
NOC-AE-02001349, Operator Licensing National Examination Schedule | 12 June 2002 | Operator Licensing National Examination Schedule | Generic Fundamentals Examination |
ML040280187 | 6 June 2002 | Letter to Mullikin, NRC from Sullivan, Brookhaven National Laboratory, Re Triennial Fire Protection Baseline Inspection, South Texas Project Units 1 and 2. IR 05000498-02-003 and 05000499-02-003 | Hot Short Safe Shutdown Fire Barrier Fire Protection Program |
NOC-AE-02001334, Technical Specification Bases Changes | 5 June 2002 | Technical Specification Bases Changes | Anticipated operational occurrence Fuel cladding |
ML021500626 | 5 June 2002 | Ltr, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Boundary Intregrity, 15-Day Response | |
TAC:MB4580 | 5 June 2002 | ||
ML041660435 | 29 May 2002 | Letter to Kanavos, STP from Banning, Framatome, Recommended Scope and Schedule to Resolve NRC Audit Concerns Related to Operator Action Issues | Safe Shutdown |
NOC-AE-02001316, Supplementary Response to NRC Order Modifying Licenses EA-02-026 | 28 May 2002 | Supplementary Response to NRC Order Modifying Licenses EA-02-026 | |
NOC-AE-02001321, Request for Technical Specification Bases Changes, TS Pages B 3/4 3-1 & B 3/4 3-2b Revised to Incorporate Information Re Relaxation of Reactor Trip System & Engineered Safety Features Actuation System Allowed Outage Time | 28 May 2002 | Request for Technical Specification Bases Changes, TS Pages B 3/4 3-1 & B 3/4 3-2b Revised to Incorporate Information Re Relaxation of Reactor Trip System & Engineered Safety Features Actuation System Allowed Outage Time | Shutdown Margin Ultimate heat sink Offsite Circuit |
NOC-AE-02001246, Application for Amendment to Relocate Shutdown Margin Limits from TS to COLR Report & Modify Action Statements Consistent with NUREG-1431 | 23 May 2002 | Application for Amendment to Relocate Shutdown Margin Limits from TS to COLR Report & Modify Action Statements Consistent with NUREG-1431 | Shutdown Margin |
NOC-AE-02001268, Supplement to License Amendment Request Regarding Missed Surveillances Using Consolidated Line Item Improvement Process (CLIIP) | 23 May 2002 | Supplement to License Amendment Request Regarding Missed Surveillances Using Consolidated Line Item Improvement Process (CLIIP) | Time of Discovery Anticipated operational occurrence Missed surveillance |
NOC-AE-02001333, License Amendment Request, Proposed Changes to Technical Specifications 3.7.1.5 & 3.7.1.7 | 23 May 2002 | License Amendment Request, Proposed Changes to Technical Specifications 3.7.1.5 & 3.7.1.7 | |
NOC-AE-02001315, Conditional Exemption from Measurement of End of Life Moderator Temperature Coefficient | 23 May 2002 | Conditional Exemption from Measurement of End of Life Moderator Temperature Coefficient | Shutdown Margin |
NOC-AE-02001272, Application for Amendment to Several Sections of TS & Unit 2 Operating License to Delete Information Specific to Model E Steam Generators | 23 May 2002 | Application for Amendment to Several Sections of TS & Unit 2 Operating License to Delete Information Specific to Model E Steam Generators | Shutdown Margin Operating Basis Earthquake Process Control Program Pressure Boundary Leakage |
NOC-AE-02001332, License Amendment Request Proposed Amendment to Technical Specification 3/4.3.5, Atmospheric Steam Relief Valve Instrumentation. | 22 May 2002 | License Amendment Request Proposed Amendment to Technical Specification 3/4.3.5, Atmospheric Steam Relief Valve Instrumentation. | Anticipated operational occurrence |
ML021770316 | 22 May 2002 | Attachment 4, E-Mail from South Texas Project Response ILRT Extension RAIs Dated May 22, 2002 | |
ML021500431 | 21 May 2002 | Comment (4) Submitted by STP Nuclear Operating Co., Alex P. Kent, on Proposed Rule PR-50 Regarding Incorporation by Reference of ASME BPV & OM Code Cases | Incorporated by reference Backfit |
NOC-AE-02001329, Suspension of Review of Application for Order | 21 May 2002 | Suspension of Review of Application for Order | |
TAC:MB2140 | 21 May 2002 | ||
NOC-AE-02001326, Additional Information to Support Request for Approval of Proposed Change to Technical Specification 3.9.4, Containment Building Penetrations | 16 May 2002 | Additional Information to Support Request for Approval of Proposed Change to Technical Specification 3.9.4, Containment Building Penetrations | Safe Shutdown Tornado Missile Time to boil Tornado Generated Missile |
NOC-AE-02001317, Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity. | 16 May 2002 | Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity. | Boric Acid VT-2 |
NOC-AE-02001322, April 2002 Monthly Operating Report for South Texas Project, Units 1 & 2 | 13 May 2002 | April 2002 Monthly Operating Report for South Texas Project, Units 1 & 2 | |
NOC-AE-02001325, Revision 1 to Unit 1 Cycle 11 Core Operating Limits Report | 13 May 2002 | Revision 1 to Unit 1 Cycle 11 Core Operating Limits Report | |
NOC-AE-02001318, STP Nuclear Operating Co., Units 1 and 2 - Changes to Emergency Plan Implementing Procedures | 6 May 2002 | STP Nuclear Operating Co., Units 1 and 2 - Changes to Emergency Plan Implementing Procedures | Fitness for Duty High winds Met Tower Temporary Modification Severe Accident Management Guideline Deep Dose Equivalent |
ML021220323 | 2 May 2002 | NRC Region IV & South Texas Project Meeting Notice Business Plan, Planned Org Restructuring, Station Focus Areas, & Steam Generator Replacement | |
NOC-AE-02001314, Annual Environmental & Annual Radiological Environmental Operating Reports | 29 April 2002 | Annual Environmental & Annual Radiological Environmental Operating Reports | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
NOC-AE-02001313, STP Nuclear Operating Co., Units 1and 2, Changes to Emergency Plan Implementing Procedures | 29 April 2002 | STP Nuclear Operating Co., Units 1and 2, Changes to Emergency Plan Implementing Procedures | Safe Shutdown Unanalyzed Condition Fitness for Duty Health Physics Network Deep Dose Equivalent Fuel cladding |
ML021000703 | 25 April 2002 | Withholding Ltr, 10 CFR 2.790 Concerning 1.4 Percent Power Uprate (Tac Nos MB2899 and MB2903) | |
ML021010160 | 25 April 2002 | Withholding Ltr, Affidavit Dated June 21, 2001 Concerning 1.4 Percent Power Uprate (CAW-01-1466) (Tac Nos MB2899 and MB2903) | |
ML031150090 | 23 April 2002 | 4/23/03, STP, Units 1 and 2, Relief Request, RR-ENG-2-27, Rev. 3, Re. RPV Head Penetration Canopy Seal Welds Repair/Replacement | Boric Acid Weld Overlay Nondestructive Examination Incorporated by reference Liquid penetrant |
TAC:MB8398 | 23 April 2002 | ||
NOC-AE-02001307, Fire Hazards Analysis Report, Amendment 14 | 22 April 2002 | Fire Hazards Analysis Report, Amendment 14 | Safe Shutdown Boric Acid Fire Barrier Fire Protection Program |
Press Release-02-051, NRC Approves Power Uprate for South Texas Project, Units 1 & 2 | 22 April 2002 | Press Release-02-051: NRC Approves Power Uprate for South Texas Project, Units 1 & 2 | |
NOC-AE-02001308, STP Nuclear Units 1 & 2 Changes to Emergency Plan Implementing Procedures | 22 April 2002 | STP Nuclear Units 1 & 2 Changes to Emergency Plan Implementing Procedures | Earthquake |
NOC-AE-02001306, Extension of Implementation Time for Amendment Nos. 136 & 125, Relaxation of Allowed Outage Times & Bypass Test Times for Instrumentation | 18 April 2002 | Extension of Implementation Time for Amendment Nos. 136 & 125, Relaxation of Allowed Outage Times & Bypass Test Times for Instrumentation | |
ML021150465 | 18 April 2002 | Errata to Amendments 138 and 127 to Licenses NPF-76 and NPF-80 | |
ML021140092 | 18 April 2002 | Attachment 12, E-Mailed on April 18, 2002, (Docket Nos. 50-498 and 50-499). Draft RAI for ILRT Interval Extension Amendment | |
ML021100003 | 18 April 2002 | Letter Re Correction of Administrative Errors and Omissions Regarding Amendments 138 and 127 Approving Uprated Core Thermal Power | |
NOC-AE-02001277, Project Comprehensive Cultural Assessment | 17 April 2002 | Project Comprehensive Cultural Assessment | |
ML020870566 | 15 April 2002 | Meetingsummary with Stars and the NRC to Inform the NRC About Current Stars Activities | Missed surveillance |
NOC-AE-02001274, Technical Specification Bases Change | 15 April 2002 | Technical Specification Bases Change | Offsite Circuit |
IR 05000498/2001008 | 12 April 2002 | IR 05000498/2001-008; IR 05000499/2001-008; on 12/29/2001 - 3/23/2002; STP Nuclear Operating Company; South Texas Project Electric Generating Station; Units 1 & 2. Integrated Res/Reg Rpt; Event Fwp, Problem Identification and Reporting | Fire Barrier Stroke time Enforcement Discretion Temporary Modification Condition Adverse to Quality Significance Determination Process Large early release frequency Operability Determination Unidentified leakage |
ML021060236 | 12 April 2002 | Technical Specifications, Amendment Nos. 138 and 127 Approving Uprated Core Thermal Power and Revising the Associated Technical Specifications (Tac Nos. MB2899 and MB2903) | Shutdown Margin Process Control Program |
TAC:MB2899 | 12 April 2002 | ||
ML020800263 | 12 April 2002 | Amendment Nos. 138 and 127, Approving Uprated Core Thermal Power and Revising the Associated Technical Specifications (Tac Nos. MB2899 and MB2903) | Safe Shutdown Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Exemption Request Turbine Missile Fuel cladding |
TAC:MB2136 | 9 April 2002 | ||
ML020920359 | 9 April 2002 | RAI, Risk-Informed Inservice Testing (Tac Nos. MB2136 and MB2137) | Safe Shutdown Probabilistic Risk Assessment Large early release frequency Exemption Request Power-Operated Valves |
NOC-AE-02001298, March 2002 Monthly Operating Report for South Texas Project, Units 1 & 2 | 8 April 2002 | March 2002 Monthly Operating Report for South Texas Project, Units 1 & 2 | |
ML020950297 | 5 April 2002 | Annual Performance Assessment Meeting for South Texas Project Electric Generating Station | |
NOC-AE-02001290, Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | 2 April 2002 | Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity. | Boric Acid Reactor Vessel Water Level VT-2 Condition Adverse to Quality Pressure Boundary Leakage |