ML021500626
| ML021500626 | |
| Person / Time | |
|---|---|
| Site: | South Texas (NPF-076, NPF-080) |
| Issue date: | 06/05/2002 |
| From: | Thadani M NRC/NRR/DLPM/LPD4 |
| To: | Cottle W South Texas |
| References | |
| BL-02-001, TAC MB4580, TAC MB4581 | |
| Download: ML021500626 (6) | |
Text
June 5, 2002 Mr. William T. Cottle President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483
SUBJECT:
BULLETIN 2002-01, REACTOR PRESSURE VESSEL HEAD DEGRADATION AND REACTOR COOLANT PRESSURE BOUNDARY INTEGRITY, 15-DAY RESPONSE FOR SOUTH TEXAS PROJECT, UNITS 1 AND 2 (TAC NOS.
MB4580 AND MB4581)
Dear Mr. Cottle:
On March 18, 2002, the Nuclear Regulatory Commission (NRC) staff issued Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, to the industry requesting that addressees provide information related to the structural integrity of the reactor coolant pressure boundary, including the reactor pressure vessel head, and the extent to which inspections have been undertaken to satisfy applicable regulatory requirements.Bulletin 2002-01 also required licensees to provide the basis for concluding that plans for future inspections of the reactor coolant pressure boundary will satisfy applicable regulatory requirements at their respective pressurized water reactor plants. All addressees were requested to respond to Items 1.A. through E. within 15 days of the Bulletins issuance, or to provide a written response to the NRC in accordance with the provisions of Title 10, Section 50.54(f), of the Code of Federal Regulations [10 CFR 50.54(f)] if they are unable to provide the information or they cannot meet the requested completion dates.
You provided your 15-day Bulletin response by letter dated April 2, 2002. The NRC staff finds that you have provided the requested information, and has concluded that your plant does not appear to have conditions similar to those which lead to the degradation at Davis-Besse.
However, the staff may issue questions to confirm or verify the information that was provided in your 15-day response to Bulletin 2002-01.
W. T. Cottle We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.
Sincerely,
/RA/
Mohan C. Thadani, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page
W. T. Cottle We will complete a full review of your response to Bulletin 2002-01 after we review your response to Items 2 and 3 of the Bulletin.
Sincerely,
/RA/
Mohan C. Thadani, Senior Project Manager, Section 1 Project Directorate IV & Decommissioning Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc: See next page DISTRIBUTION:
PUBLIC PDIV-1 R/F RidsNrrPMMThadani RidsNrrLAMMcAllister RidsNrrPMSBloom RidsNrrDlpmLpdiv1 (RGramm)
RidOgcRp RidsAcrsAcnwMailCenter RidsNrrDeEmcb (WBateman)
SCoffin ALee RidsRgn4MailCenter (KBrockman/BJohnson/DBujol/LHurley)
Adams: ML021500626 OFFICE PDIV-1M PDIV-1/LA EMCB PDVI-1/SC NAME MThadani:as MMcAllister SBloom RGramm DATE 6/4/02 5/31/02 6/4/02 6/4/02 OFFICIAL RECORD COPY
April 2002 South Texas, Units 1 & 2 cc:
Mr. Cornelius F. OKeefe Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Mr. M. T. Hardt Mr. W. C. Gunst City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Mr. C. A. Johnson/R. P. Powers AEP - Central Power and Light Company P. O. Box 289 Mail Code: N5022 Wadsworth, TX 77483 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 D. G. Tees/R. L. Balcom Houston Lighting & Power Co.
P. O. Box 1700 Houston, TX 77251 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 A. H. Gutterman, Esq.
Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. J. J. Sheppard, Vice President Engineering & Technical Services STP Nuclear Operating Company P. O. Box 289 Wadsworth, TX 77483 S. M. Head, Manager, Licensing Nuclear Quality & Licensing Department STP Nuclear Operating Company P. O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 Environmental and Natural Resources Policy Director P. O. Box 12428 Austin, TX 78711-3189 Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, TX 78205 Arthur C. Tate, Director Division of Compliance & Inspection Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Natural Resource Conservation Commission MC-122 P.O. Box 13087 Austin, TX 78711-3087 G. R. Bynog, Program Manager/
Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157, Capitol Station Austin, TX 78711