NOC-AE-02001334, Technical Specification Bases Changes

From kanterella
Jump to navigation Jump to search
Technical Specification Bases Changes
ML021780017
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/05/2002
From: Head S
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
G25, NOC-AE-02001334, STI: 31451791
Download: ML021780017 (5)


Text

Nuclear Operating Company dEetrlc GeneratingStation PC. Box 28 South Texas Project Wadsworth, Texas 77483 .V June 5, 2002 NOC-AE-02001334 File No.: G25 STI: 31451791 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Technical Specification Bases Changes Revised South Texas Project Technical Specification Bases pages are attached for your information and for updating of the NRC copy of the Technical Specification's. The attached pages incorporate information regarding the recently approved amendment for 1.4 percent power uprate.

If there are any questions regarding these changes, please contact me at (361) 972-7136.

Scott M. Head Manager, Licensing mkj

Attachment:

Revised Technical Specification Bases Pages B 2-1 and B 3/4 7-1 O:\QUALITYANDULICENSING\TSB\AMENDMENThO2\NOC-AE- 02001334

NOC-AE-02001334 Page 2 of 2 cc:

(paper copy) (electronic copy)

Ellis W. Merschoff A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 M. T. Hardt/W. C. Gunst Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission Mohan C. Thadani Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom Rockville, MD 20852 Reliant Energy, Inc.

Richard A. Ratliff A. Ramirez Bureau of Radiation Control City of Austin Texas Department of Health 1100 West 49th Street C. A. Johnson Austin, TX 78756-3189 AEP - Central Power and Light Company Cornelius F. O'Keefe Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. 0. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

ATTACHMENT REVISED BASES PAGES

"SAFETYLIMITS BASES 2.1.1 REACTOR CORE The restrictions of this Safety Limit prevent overheating of the fuel and possible cladding perforation which would result in the release of fission products to the reactor coolant. Overheating of the fuel cladding is prevented by restricting fuel operation to within the nucleate boiling regime where the heat transfer coefficient is large and the cladding surface temperature is slightly above the coolant saturation temperature.

Operation above the upper boundary of the nucleate boiling regime could result in excessive cladding temperatures because of the onset of departure from nucleate boiling (DNB) and the resultant sharp reduction in heat transfer coefficient. DNB is not a directly measurable parameter during operation and therefore THERMAL POWER and reactor coolant temperature and pressure have been related to DNB through the WRB-1 correlation and the WRB-2M correlation. The WRB-1 DNB and WRB-2M correlations have been developed to predict the DNB flux and the location of DNB for axially uniform and nonuniform heat flux distributions. The local DNB heat flux ratio (DNBR) is defined as the ratio of the heat flux that would cause DNB at a particular core location to the local heat flux and is indicative of the margin to DNB.

The DNB design basis is as follows: uncertainties in the WRB-1 and WRB-2M correlations, plant operating parameters, nuclear and thermal parameters, fuel fabrication parameters, and computer codes are considered statistically such that there is at least a 95 percent probability with a 95 percent confidence level that DNBR will not occur on the most limiting fuel rod during Condition I and II events. This establishes a design DNBR value which must be met in plant safety analyses using values of input parameters without uncertainties. In addition, margin has been maintained in the design by meeting safety analysis DNBR limits in performing safety analyses.

The reactor core Safety Limits are established to preclude violation of the following fuel design criteria:

a. There must be at least a 95% probability at a 95% confidence level (the 95/95 DNB criterion) that the hot fuel rod in the core does not experience DNB; and
b. There must be at least a 95% probability at a 95% confidence level that the hot fuel pellet in the core does not experience centerline fuel melting.

The reactor core Safety Limits are used to define the various Reactor Protection System (RPS) functions such that the above criteria are satisfied during steady state operation, normal operational transients, and anticipated operational occurrences (AOOs). To ensure that the RPS precludes the violation of the above criteria, additional criteria are applied to the Overtemperature and Overpower AT reactor trip functions. That is, it must be demonstrated that the average enthalpy in the hot leg is less than or equal to the saturation enthalpy and that the core exit quality is within the limits defined by the DNBR correlation. Appropriate functioning of the RPS ensures that, for variations in the Thermal Power, RCS Pressure, RCS average temperature, RCS flow rate, and Al, the reactor core Safety Limits will be satisfied during steady state operation, normal operational transients, and AOOs.

SOUTH TEXAS - UNITS 1 & 2 B 2-1 Unit 1 - Amendment No.

Unit 2 - Amendment No.

01-1862

3/4.7 PLANT SYSTEMS BASES 3/4.7.1 TURBINE CYCLE 3/4.7.1.1 SAFETY VALVES The OPERABILITY of the main steam line Code safety valves ensures that the Secondary System pressure will be limited to within 110% (1413.5 psig) of its design pressure of 1285 psig during the most severe anticipated system operational transient. The maximum relieving capacity is associated with a Turbine trip from 100% RATED THERMAL POWER coincident with an assumed loss of condenser heat sink (i.e., no steam bypass to the condenser).

Five MSSVS, each with an orifice size of 16 in 2, are located on each main steam header, outside containment, upstream of the main steam isolation valves. The specified valve lift settings and relieving capacities are in accordance with the requirements of Section III of the ASME Boiler and Pressure Code, 1971 Edition. The total relieving capacity for all valves on all of the steam lines is 20.65 x 106 lbs/h which is 122% of the total secondary steam flow of 16.94 X 106 lbs/h for the Model E steam generators or 120% of the total secondary steam flow of 17.20 X 106 lbs/hr for the Model A94 steam generators at 100% RATED THERMAL POWER. A minimum of two OPERABLE safety valves per steam generator ensures that sufficient relieving capacity is available for the allowable THERMAL POWER restriction in Table 3.7-1.

STARTUP and/or POWER OPERATION is allowable with safety valves inoperable within the limitations of the ACTION requirements on the basis of the reduction in Secondary Coolant System steam flow and THERMAL POWER required by the reduced Reactor trip settings of the Power Range Neutron Flux channels. The Reactor Trip Setpoint reductions are derived on the following bases:

HiCk= ( 100 -S) WshfrN g )

Q K Where:

Hi 0 = Safety analysis power range high neutron flux setpoint, percent Q = Nominal NSSS power rating of the plant (including reactor coolant pump heat), MWt K = Conversion Factor, 947.82 (BTU/sec)/MWt W, = Minimum total steam flow rate capability of the operable MSSVs on any one steam generator at the highest MSSV opening pressure, including tolerance and accumulation, as appropriate, in Ibm/sec. For example, if the maximum number of inoperable MSSVs on any one steam generator is one, then w. should be a summation of the capacity of the operable MSSVs at the highest operable MSSV operating pressure, excluding the highest capacity MSSV. If the maximum number of inoperable MSSVs per steam generator is three, then ws should be a summation of the capacity of the operable MSSVs at the highest operable MSSV operating pressure, excluding the three highest capacity MSSVs.

hfg = Heat of vaporization for steam at the highest MSSV operating pressure including allowances for tolerance, drift, and accumulation, as appropriate, Btu/Ibm N = Number of loops in the plant.

The calculated values are lowered an additional 9% full power to account for instrument and channel uncertainties.

SOUTH TEXAS - UNITS 1 & 2 B 3/4 7-1 Unit 1 - Amendment No. 01-1862 Unit 2 - Amendment No. 01-1862