NOC-AE-02001298, March 2002 Monthly Operating Report for South Texas Project, Units 1 & 2

From kanterella
Jump to navigation Jump to search
March 2002 Monthly Operating Report for South Texas Project, Units 1 & 2
ML021050363
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/08/2002
From: Mallen F
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-02001298
Download: ML021050363 (14)


Text

Nuclear Operating Company South Texas Pro/e1t Nuclear Operating Company PO Box 289 Wadsmorth, Texas 77483 -'VV*-

April 8, 2002 NOC-AE-02001298 File No. G02 STI31426640 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for March 2002 Pursuant to 10CFR50.7 1(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for March 2002.

If you should have any questions on this matter, please contact R. L. Hill at (361) 972-7667.

Sincerely, F. H. Mallen Manager, Planning & Controls Attachments: 1) STPEGS Unit 1 Monthly Operating Report - March 2002

2) STPEGS Unit 2 Monthly Operating Report - March 2002

NOC-AE- 02001298 File No.: G02 STI No.:31426640 Page 2 cc:

Ellis W. Merschoff Jon C. Wood Regional Administrator, Region IV Matthews & Branscomb U.S. Nuclear Regulatory Commission 112 East Pecan, Suite 1100 611 Ryan Plaza Drive, Suite 400 San Antonio, Texas 78205-3692 Arlington, Texas 76011-8064 Institute of Nuclear Power Mohan C. Thadani Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Project Manager, Atlanta, GA 30339-5957 1 White Flint North 11555 Rockville Place Richard A. Ratliff Rockville, MD 20852-2738 Bureau of Radiation Control Mail Stop: 0-7D1 Texas Department of Health 1100 West 49th Street Cornelius F. O'Keefe Austin, TX 78756-3189 U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code MNl16 R. L. Balcom/D. G. Tees Wadsworth, TX 77483 Reliant Energy, Inc.

P. 0. Box 1700 A. H. Gutterman, Esquire Houston, TX 77251 Morgan, Lewis & Bockius 1800 M. Street, N.W. C. A. Johnson/A. C. Bakken, III Washington, DC 20036-5869 AEP - Central Power and Light Company P. 0. Box 289, Mail Code: N5022 M. T. Hardt/W. C. Gunst Wadsworth, TX 77483 City Public Service P. 0. Box 1771 U. S. Nuclear Regulatory Commission San Antonio, TX 78296 Attention: Document Control Desk Washington, D.C. 20555-0001 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT MARCH 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By:

eCl E.D. IKLPIN Date

MONTHLY

SUMMARY

South Texas Project Unit I operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKET NO. 50-498 UNIT 1 DATE Apr. 2, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 03/1/02-03/31/02 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 744.0 2,160. 92,109.9
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 744.0 2,160.0 90,479.8
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,839,756 8,239,040 337,537,380
10. NET ELECTRICAL ENERGY GENERATED (MWH) 942,453 2,736,119 110,084,233
11. REACTOR SERVICE FACTOR (%) 100.0 100.0 77.3
12. REACTOR AVAILABILITY FACTOR (%) 100.0 100.0 77.3
13. UNIT SERVICE FACTOR (%) 100.0 100.0 75.9
14. UNIT AVAILABILITY FACTOR (%) 100.0 100.0 75.9
15. UNIT CAPACITY FACTOR - Using MDC (%) 101.3 101.3 73.8
16. UNIT CAPACITY FACTOR - Using DER (%) 101.3 101.3 73.8
17. UNIT FORCED OUTAGE RATE (%) 0.0 0.0 14.0
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE Apr. 2, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH MARCH DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net)

(MWe-Net) 17 1268 1 1267 18 1264 2 1267 19 1265 3 1268 20 1265 4 1269 21 1267 5 1268 22 1269 6 1267 23 1268 7 1268 24 1266 8 1265 25 1266 9 1270 26 1265 10 1270 27 1267 11 1267 28 1266 12 1268 29 1265 13 1267 30 1263 14 1266 31 1264 15 1265 16 1268

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 UNIT 1 DATE Apr. 2, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH MARCH 1 2 3 4 5 Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence No.

(Hours) Shutting Event Code Code Down Report #

Reactor THE REPORTING PERIOD THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING 2 3 4 5 1 IEEE 805-1983 IEEE 803-1983 Reason: Method:

F: Forced A-Equipment Failure (Explain) 1-Manual S: Scheduled B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT MARCH 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By: Date E.D. H IN

MONTHLY

SUMMARY

South Texas Project Unit 2 operated during the reporting period at full power with no unit shutdowns or significant power reductions.

OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Apr. 2, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 03/1/02-03/31/02 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 744.0 2,160.0 89,974.0
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 744.0 2,160.0 87,787.7
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) 2,839,848 8,242,155 327,402,686
10. NET ELECTRICAL ENERGY GENERATED (MWH) 931,841 2,710,758 106,668,879
11. REACTOR SERVICE FACTOR (%) 100.0 100.0 80.3
12. REACTOR AVAILABILITY FACTOR (%) 100.0 100.0 80.3
13. UNIT SERVICE FACTOR (%) 100.0 100.0 78.3
14. UNIT AVAILABILITY FACTOR (%) 100.0 100.0 78.3
15. UNIT CAPACITY FACTOR - Using MDC (%) 100.1 100.4 76.1
16. ULNIT CAPACITY FACTOR - Using DER (%) 100.1 100.4 76.1
17. UNIT FORCED OUTAGE RATE (%) 0.0 0.0 13.7
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Apr. 2, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH MARCH AVERAGE DAILY POWER DAY AVERAGE DAILY POWER DAY LEVEL LEVEL (MWe-Net)

(MWe-Net) 1 1256 17 1254 1253 18 1251 2

1254 19 1251 3

1256 20 1250 4

1251 21 1250 5

1256 22 1253 6

1254 23 1252 7

1251 24 1256 8

1253 25 1252 9

1253 26 1252 10 1252 27 1252 11 1252 28 1251 12 1253 29 1250 13 1252 30 1251 14 1253 31 1252 15 16 1253

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-499 UNIT 2 DATE Apr. 2, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH MARCH 1 2 3 4 5 Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence No.

(Hours) Shutting Event Code Code Down Report #

Reactor PERIOD THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING 2 3 4 5 1 IEEE 805-1983 IEEE 803-1983 Reason: Method:

F: Forced A-Equipment Failure (Explain) 1-Manual S: Scheduled B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.