Issue date | Title | Topic | |
---|---|---|---|
PY-CEI-NRR-1226, Forwards LERs 90-018-00 & 90-019-00 for Plant | 14 September 1990 | Forwards LERs 90-018-00 & 90-019-00 for Plant | |
ML20059K468 | 14 September 1990 | Provides Supplemental Info Re Emergency Response Data Sys (Erds).Data Transmitted by Util ERDS Will Have Quality Tag of 4 & Point Identification for ERDS Renamed | |
ML20065D049 | 14 September 1990 | Forwards Operator & Senior Operator Licensing Exam Ref Matl for Exam Scheduled for Wk of 901112,per 900607 Request | |
ML20065D495 | 14 September 1990 | Forwards Updated Exam Schedule for Facility,In Response to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule | |
ML20059G234 | 10 September 1990 | Provides Response to Request for Addl Info Re Interpretation of Tech Spec 3/4.7.10, Fire Barriers. Interpretation Is Implemented & Unnecessary Compensatory Measures Removed.List of Fire Barriers Inspected on One Side Only Encl | Fire Barrier |
PY-CEI-NRR-1218, Responds to Generic Ltr 90-07 Re Proposed OL Exam Schedule, Operator Requalification Schedule & Generic Fundamental Exam Schedule for Plant.Licensee Will Continue to Train & Requalify Operators on Annual Basis | 10 September 1990 | Responds to Generic Ltr 90-07 Re Proposed OL Exam Schedule, Operator Requalification Schedule & Generic Fundamental Exam Schedule for Plant.Licensee Will Continue to Train & Requalify Operators on Annual Basis | |
ML20059G496 | 6 September 1990 | Submits Voluntary Rept of Svc Water HX Testing During Sixth Refueling Outage.Expected Flow Rates Not Achieved.Periodic Tests Developed to Check Efficiency of Containment Air Coolers | |
ML20064A627 | 6 September 1990 | Requests That Requirement Date for Installation & Testing of Alternate Ac Power Source & Compliance w/10CFR50.63 Be Deferred Until Completion of Eighth Refueling Outage | |
ML20059E874 | 5 September 1990 | Forwards Fourteenth Quarterly Rept Cleveland Electric Illuminating Co Seismic Monitoring Network Jan-June 1990. Five Microevents Originating within Network & Three Other Events Originating Outside of Network Recorded | |
PY-CEI-NRR-1216, Forwards Perry Nuclear Power Plant Unit 1 Semiannual Radioactive Effluent Release Rept,1990 Quarters 1 & 2. Response to Recommendations from NRC Re Range of Dilution Flows Will Be Submitted W/Next Effluent Rept | 29 August 1990 | Forwards Perry Nuclear Power Plant Unit 1 Semiannual Radioactive Effluent Release Rept,1990 Quarters 1 & 2. Response to Recommendations from NRC Re Range of Dilution Flows Will Be Submitted W/Next Effluent Rept | |
PY-CEI-NRR-1201, Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements | 28 August 1990 | Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements | |
ML20059D412 | 28 August 1990 | Forwards Second 10-Yr Interval Pump & Valve Inservice Testing Program | Safe Shutdown Boric Acid Stroke time Incorporated by reference Cold shutdown justification |
ML20028G861 | 28 August 1990 | Forwards Davis Besse Nuclear Power Station Semiannual Rept: Effluent & Waste Disposal,Jan-June 1990. | |
ML20059D552 | 24 August 1990 | Forwards Semiannual Fitness for Duty Rept for Jan-June 1990 | Fitness for Duty |
ML20059B529 | 23 August 1990 | Forwards Updated Fracture Mechanics Analysis of Hpi/Makeup Nozzle,Per 900510 Meeting W/Nrc.Util Believes That Addl Analysis to Assess Structural Integrity of Nozzle Using More Conservative Fracture Model Supports Previous Analysis | |
PY-CEI-NRR-1211, Responds to NRC Re Violations Noted in Insp Rept 50-440/89-26.Corrective Actions Noted:Necessary Engineering Design Mods Which Evaluation Found Necessary Contained in DCP 90-0086 | 23 August 1990 | Responds to NRC Re Violations Noted in Insp Rept 50-440/89-26.Corrective Actions Noted:Necessary Engineering Design Mods Which Evaluation Found Necessary Contained in DCP 90-0086 | |
PY-CEI-NRR-1210, Proposes Date of 901207 to Provide Updated Status & Schedules,Per 900604 Request for Addl Info on Disposition of Bulletin 88-005 Product Forms Other than Pipe Fittings & Flanges Received at Plant | 17 August 1990 | Proposes Date of 901207 to Provide Updated Status & Schedules,Per 900604 Request for Addl Info on Disposition of Bulletin 88-005 Product Forms Other than Pipe Fittings & Flanges Received at Plant | |
ML20058Q391 | 16 August 1990 | Requests NRC Concurrence on Encl Interpretation & Technical Justification of Tech Spec 3/4.7.10, Fire Barriers | Safe Shutdown High Radiation Area Fire Barrier Weak link |
ML20058P780 | 10 August 1990 | Advises of Intentions to Revise Testing Requirements for Fire Protection Portable Detection Sys at Plant & Functional Testing of auto-dialer & Telephone Line Subsys from Daily to Weekly Testing | |
PY-CEI-NRR-1208, Responds to NRC 900613 Request for Addl Info Re Inservice Insp Relief Requests.Util Revised Relief Requests PT-001 & PT-003 to Provide More Detailed Info & Has Withdrawn Relief Request IR-017.Revised Relief Requests & Summary Encl | 10 August 1990 | Responds to NRC 900613 Request for Addl Info Re Inservice Insp Relief Requests.Util Revised Relief Requests PT-001 & PT-003 to Provide More Detailed Info & Has Withdrawn Relief Request IR-017.Revised Relief Requests & Summary Encl | Hydrostatic VT-2 Scaffolding |
ML20063P998 | 9 August 1990 | Submits Supplemental Response to Insp Rept 50-346/89-21. Util Rescinds Denial & Accepts Alleged Violation | Hydrostatic |
ML20058M779 | 3 August 1990 | Forwards Rev 10 to Industrial Security Plan & Rev 6 to Security Training & Qualification Plan.Revs Withheld | |
ML20056A534 | 3 August 1990 | Confirms Electronic Transfer of Payment of Invoice I0942 Covering Annual Fee for FY90,per 10CFR171 | |
ML20058L182 | 1 August 1990 | Forwards Davis-Besse Dcrdr Human Engineering Discrepancy Repts 1988 Summary Addendum 1,Vol 1, Per NRC Audit Team Request | |
PY-CEI-NRR-1203, Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved | 27 July 1990 | Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved | |
PY-CEI-NRR-1200, Forwards Decommissioning Repts on Financial Assurance for Plant | 25 July 1990 | Forwards Decommissioning Repts on Financial Assurance for Plant | |
PY-CEI-NRR-1196, Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan | 24 July 1990 | Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan | |
ML20056A834 | 23 July 1990 | Forwards Revised Monthly Operating Rept for June 1990 for Davis-Besse Nuclear Power Station Unit 1 | |
ML20055H460 | 20 July 1990 | Discusses Resolution of Draft SER Open Item on Voluntary Loss of Offsite Power.Util Preparing License Amend Request Per Generic Ltrs 86-10 & 88-12 to Relocate Fire Protection Tech Specs & Update Fire Protection License Condition | |
PY-CEI-NRR-1205, Forwards LERs 90-014-00 & 90-015-00 for Plant | 20 July 1990 | Forwards LERs 90-014-00 & 90-015-00 for Plant | |
ML20055F856 | 17 July 1990 | Discusses Util Planned Activities Re Instrumented Insp Technique Testing Performed at Facility in View of to Hafa Intl.Relief Requests Being Prepared by Util for Sys on Conventional Hydrostatic Testing | Hydrostatic |
ML20055F968 | 17 July 1990 | Forwards Application for Amend to License NPF-3,adding Centerior Svc Company as Licensee in Facility Ol.Change Allows for Improved Mgt Oversight,Control & Uniformity of Nuclear Operations | |
ML20044B300 | 12 July 1990 | Provides Written Confirmation of Util Electronic Transfer of Funds to NRC on 900711 in Payment of Invoice Number I1050 | |
ML20044B184 | 10 July 1990 | Requests Approval of Temporary non-code Repair & Augmented Insp of Svc Water Piping,Per 900626 Telcon | Condition Adverse to Quality |
ML20055D970 | 29 June 1990 | Provides Written Confirmation of Util Electronic Transfer of Funds for Payment of Invoice 0111 Covering Insp Fees for 890326-0617 | |
PY-CEI-NRR-1193, Responds to Generic Ltr 90-04 Re Implementation Status of Generic Safety Issues | 29 June 1990 | Responds to Generic Ltr 90-04 Re Implementation Status of Generic Safety Issues | Scram Discharge Volume |
ML20043H737 | 19 June 1990 | Forwards Individual Plant Exam Project Milestones.Milestones Subj to Change from Project or External Causes & Will Not Be Docketed Again Unless Significant Impact on Final Rept Contents or Submittal Date Exists | Internal Flooding |
ML20043H171 | 14 June 1990 | Discusses Util Radiological Safety Board of Ohio 900614 Comments on Notice of Opportunity for Hearing Re Rev to Previously Submitted License Amend Application.Licensees Would Welcome Opportunity to Consult W/State of Oh | |
ML20043H529 | 14 June 1990 | Forwards Plans Re Reorganization & Combining of Engineering Assurance & Svc Program Sections | Fire Protection Program |
ML20043G566 | 14 June 1990 | Forwards Rev 9 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) | |
ML20055C752 | 14 June 1990 | Responds to NRC Bulletin 89-002, Potential Stress Corrosion Cracking of Internal Preloaded Bolting in Swing Check Valves & Justification for Alternate Insp Schedule for One Valve. No Anchor Darling Swing Check Valves Installed at Plant | Non-Destructive Examination Anchor Darling |
ML20055F226 | 14 June 1990 | Forwards 1990 Evaluated Emergency Exercise Objectives for Exercise Scheduled for 900919 | |
ML20043G781 | 12 June 1990 | Forwards Info Re Implementation of NUREG-0737,Item II.F.2, Inadequate Core Cooling Instrumentation, Per NRC 900214 Safety Evaluation.Item II.B.1 Issue Re Reactor Vessel Head Vent Also Considered to Be Closed | |
ML20043F609 | 11 June 1990 | Forwards Util Comments on NRC Insp Rept 50-346/90-12, Per 900601 Enforcement Conference Re Core Support Assembly Movement & Refueling Canal Draindown.Refueling Canal Draindown Procedure Provides Specific Draining Instructions | |
ML20043E577 | 8 June 1990 | Provides Info Re Implementation of Administrative Controls & Training Related to Use of Tech Spec 3.0.4.Util Intends to Implement Amend 30 Changes by 900618.All Licensed Operators Would Receive Training to Generic Ltr 87-09 | Missed surveillance |
ML20043E130 | 1 June 1990 | Withdraws 870831 & 890613 Applications to Amend License NPF-3.Changes Requested Addressed by Issuance of Amend 147 or Can Now Be Made as Change to Updated SAR Under 10CFR50.59 | |
ML20043D569 | 31 May 1990 | Forwards Application for Amend to License NPF-3,requesting Extension of Expiration Date of Section 2.H to Allow Plant Operation to Continue Approx 6 Yrs Beyond Current Expiration Date | |
ML20043D560 | 31 May 1990 | Forwards Application for Amend to License NPF-3,revising Tech Spec 3/4.6.4.1, Combustible Gas Control - Hydrogen Analyzers. Request Consistent W/Nrc Guidance,Generic Ltr 83-37,dtd 831101,NUREG-0737 Tech Specs & Item II.F.1.6 | |
ML20043D145 | 31 May 1990 | Forwards Rev 11 to Updated SAR for Unit 1.Rev Updates Table 6.2-23 Re Containment Vessel Isolation Valve Arrangements | |
ML20043D162 | 29 May 1990 | Documents Util Understanding of NRC Interpretation of Plant Tech Spec 3.7.9.1,Action b.2 Re Fire Suppression Water Sys, Per 891206 Telcon.Nrc Considered Electric Fire Pump Operable Provided Operator Stationed to Open Closed Discharge Valve |