Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
PY-CEI-NRR-1226, Forwards LERs 90-018-00 & 90-019-00 for Plant14 September 1990Forwards LERs 90-018-00 & 90-019-00 for Plant
ML20059K46814 September 1990Provides Supplemental Info Re Emergency Response Data Sys (Erds).Data Transmitted by Util ERDS Will Have Quality Tag of 4 & Point Identification for ERDS Renamed
ML20065D49514 September 1990Forwards Updated Exam Schedule for Facility,In Response to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule
ML20065D04914 September 1990Forwards Operator & Senior Operator Licensing Exam Ref Matl for Exam Scheduled for Wk of 901112,per 900607 Request
ML20059G23410 September 1990Provides Response to Request for Addl Info Re Interpretation of Tech Spec 3/4.7.10, Fire Barriers. Interpretation Is Implemented & Unnecessary Compensatory Measures Removed.List of Fire Barriers Inspected on One Side Only EnclFire Barrier
PY-CEI-NRR-1218, Responds to Generic Ltr 90-07 Re Proposed OL Exam Schedule, Operator Requalification Schedule & Generic Fundamental Exam Schedule for Plant.Licensee Will Continue to Train & Requalify Operators on Annual Basis10 September 1990Responds to Generic Ltr 90-07 Re Proposed OL Exam Schedule, Operator Requalification Schedule & Generic Fundamental Exam Schedule for Plant.Licensee Will Continue to Train & Requalify Operators on Annual Basis
ML20059L4277 September 1990Requests Approval for Use of Steam Generator Tube Plugs for Both Mechanical & Welded Applications
ML20059G4966 September 1990Submits Voluntary Rept of Svc Water HX Testing During Sixth Refueling Outage.Expected Flow Rates Not Achieved.Periodic Tests Developed to Check Efficiency of Containment Air Coolers
ML20064A6276 September 1990Requests That Requirement Date for Installation & Testing of Alternate Ac Power Source & Compliance w/10CFR50.63 Be Deferred Until Completion of Eighth Refueling Outage
ML20059E8745 September 1990Forwards Fourteenth Quarterly Rept Cleveland Electric Illuminating Co Seismic Monitoring Network Jan-June 1990. Five Microevents Originating within Network & Three Other Events Originating Outside of Network Recorded
ML20059G0824 September 1990Forwards Application for Amend to License DPR-66,consisting of License Change Request 180,changing Section 3.3.3.2 to Reduce Required Number of Operable Incore Detector Thimbles for Remainder of Cycle 8
ML20059F15029 August 1990Advises That Permanent Replacement Chosen for Plant Independent Safety Evaluation Group.Position Will Be Staffed Effective 900829
ML20059F75529 August 1990Responds to Unresolved Item 50-334/90-16-01 Noted in Insp Rept 50-334/90-16.Corrective Actions:Initial Training for Maint Group Personnel Responsible for Maintaining Supplied Air Respirators Will Be Supplemented W/Biennial Retraining
ML20028G87329 August 1990Forwards fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.71Fitness for Duty
PY-CEI-NRR-1216, Forwards Perry Nuclear Power Plant Unit 1 Semiannual Radioactive Effluent Release Rept,1990 Quarters 1 & 2. Response to Recommendations from NRC Re Range of Dilution Flows Will Be Submitted W/Next Effluent Rept29 August 1990Forwards Perry Nuclear Power Plant Unit 1 Semiannual Radioactive Effluent Release Rept,1990 Quarters 1 & 2. Response to Recommendations from NRC Re Range of Dilution Flows Will Be Submitted W/Next Effluent Rept
PY-CEI-NRR-1201, Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements28 August 1990Forwards First Semiannual fitness-for-duty Rept for Plant for 900103-0630,per 10CFR26.71(d) Requirements
ML20028G86128 August 1990Forwards Davis Besse Nuclear Power Station Semiannual Rept: Effluent & Waste Disposal,Jan-June 1990.
ML20059D41228 August 1990Forwards Second 10-Yr Interval Pump & Valve Inservice Testing ProgramSafe Shutdown
Boric Acid
Stroke time
Incorporated by reference
Cold shutdown justification
ML20059D55224 August 1990Forwards Semiannual Fitness for Duty Rept for Jan-June 1990Fitness for Duty
ML20059D37624 August 1990Describes Cycle 3 Reload Design,Documents Util Review Per 10CFR50.59 & Provides Determination That No Tech Spec Changes or Unreviewed Safety Questions Involved.Reload Core Design Will Not Adversely Affect Safety of Plant
ML20028G88824 August 1990Withdraws Operator License SOP-10731 (55-60749) Issued to K Gilbert,Who Resigned
05000412/LER-1990-007, Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued23 August 1990Responds to NRC Re Deviation 50-412/90-12-01 Noted in Insp Rept 50-412/90-12.Corrective Actions:Procedure OM 2.20-4.I Revised to Require Removal of Flanges Following Drain Operations & LER 90-007-00 Issued
PY-CEI-NRR-1211, Responds to NRC Re Violations Noted in Insp Rept 50-440/89-26.Corrective Actions Noted:Necessary Engineering Design Mods Which Evaluation Found Necessary Contained in DCP 90-008623 August 1990Responds to NRC Re Violations Noted in Insp Rept 50-440/89-26.Corrective Actions Noted:Necessary Engineering Design Mods Which Evaluation Found Necessary Contained in DCP 90-0086
ML20059B52923 August 1990Forwards Updated Fracture Mechanics Analysis of Hpi/Makeup Nozzle,Per 900510 Meeting W/Nrc.Util Believes That Addl Analysis to Assess Structural Integrity of Nozzle Using More Conservative Fracture Model Supports Previous Analysis
PY-CEI-NRR-1210, Proposes Date of 901207 to Provide Updated Status & Schedules,Per 900604 Request for Addl Info on Disposition of Bulletin 88-005 Product Forms Other than Pipe Fittings & Flanges Received at Plant17 August 1990Proposes Date of 901207 to Provide Updated Status & Schedules,Per 900604 Request for Addl Info on Disposition of Bulletin 88-005 Product Forms Other than Pipe Fittings & Flanges Received at Plant
ML20058Q39116 August 1990Requests NRC Concurrence on Encl Interpretation & Technical Justification of Tech Spec 3/4.7.10, Fire BarriersSafe Shutdown
High Radiation Area
Fire Barrier
Weak link
ML20058P76514 August 1990Provides Info on Acceptability of Rescheduling Response to Reg Guide 1.97 Ser,Item 4b, Neutron Flux Monitoring Instrumentation. Rescheduling of Util Response Will Be Determined on or Shortly After Meeting W/Nrc
ML20059E05710 August 1990Forwards Suppl 3 to Nonproprietary WCAP-12094 & Proprietary WCAP-12093, Evaluation of Pressurizer Surge Line Transients Exceeding 320 F for Beaver Valley Unit 2, for Review by 900901.Proprietary Rept Withheld (Ref 10CFR2.790(b)(4))
ML20058P78010 August 1990Advises of Intentions to Revise Testing Requirements for Fire Protection Portable Detection Sys at Plant & Functional Testing of auto-dialer & Telephone Line Subsys from Daily to Weekly Testing
PY-CEI-NRR-1208, Responds to NRC 900613 Request for Addl Info Re Inservice Insp Relief Requests.Util Revised Relief Requests PT-001 & PT-003 to Provide More Detailed Info & Has Withdrawn Relief Request IR-017.Revised Relief Requests & Summary Encl10 August 1990Responds to NRC 900613 Request for Addl Info Re Inservice Insp Relief Requests.Util Revised Relief Requests PT-001 & PT-003 to Provide More Detailed Info & Has Withdrawn Relief Request IR-017.Revised Relief Requests & Summary EnclHydrostatic
VT-2
Scaffolding
ML20063P9989 August 1990Submits Supplemental Response to Insp Rept 50-346/89-21. Util Rescinds Denial & Accepts Alleged ViolationHydrostatic
ML20056A5343 August 1990Confirms Electronic Transfer of Payment of Invoice I0942 Covering Annual Fee for FY90,per 10CFR171
ML20058M7793 August 1990Forwards Rev 10 to Industrial Security Plan & Rev 6 to Security Training & Qualification Plan.Revs Withheld
ML20058L1821 August 1990Forwards Davis-Besse Dcrdr Human Engineering Discrepancy Repts 1988 Summary Addendum 1,Vol 1, Per NRC Audit Team Request
ML20059B8141 August 1990Requests Exemption from 10CFR26 Re Fitness for Duty Program & 10CFR73 Re Physical Protection of Plants & Matls Concerning Unescorted Access Requirements for Nuclear Generating StationsFitness for Duty
Exemption Request
ML20059E7631 August 1990Provides Results of Util Evaluation of Licensed Operator Requalification Exam Conducted During Wks of 900709 & 16. Crew That Failed to Meet Expected Performance Level Has Been Successfully Upgraded & re-evaluated to Be Satisfactory
ML20056A34731 July 1990Responds to NRC Bulletin 90-001.Items 1 Through 5 of Requested Actions for Operating Reactors Completed
ML20056A18427 July 1990Forwards Revised Methodology for Achieving Alternate Ac for Plant,Per 900720 TelconSafe Shutdown
PY-CEI-NRR-1203, Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved27 July 1990Provides Estimate Duration Schedule Re Installation of post-LOCA Neutron Monitoring Sys.Util Will Evaluate Effect of Resolution on Schedule & Confirm or Revise Installation Date as Needed,When Appeal & Criteria Questions Resolved
PY-CEI-NRR-1200, Forwards Decommissioning Repts on Financial Assurance for Plant25 July 1990Forwards Decommissioning Repts on Financial Assurance for Plant
ML20055H25825 July 1990Forwards Decommissioning Rept, Per 10CFR50.33(K) & 50.75(b)
PY-CEI-NRR-1196, Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan24 July 1990Forwards Rev 0 to Inservice Exam Program. Program Serves as 10-yr Rev to Inservice Insp Program Plan
ML20056A83423 July 1990Forwards Revised Monthly Operating Rept for June 1990 for Davis-Besse Nuclear Power Station Unit 1
ML20055H46020 July 1990Discusses Resolution of Draft SER Open Item on Voluntary Loss of Offsite Power.Util Preparing License Amend Request Per Generic Ltrs 86-10 & 88-12 to Relocate Fire Protection Tech Specs & Update Fire Protection License Condition
PY-CEI-NRR-1205, Forwards LERs 90-014-00 & 90-015-00 for Plant20 July 1990Forwards LERs 90-014-00 & 90-015-00 for Plant
ML20055F96817 July 1990Forwards Application for Amend to License NPF-3,adding Centerior Svc Company as Licensee in Facility Ol.Change Allows for Improved Mgt Oversight,Control & Uniformity of Nuclear Operations
ML20055F85617 July 1990Discusses Util Planned Activities Re Instrumented Insp Technique Testing Performed at Facility in View of to Hafa Intl.Relief Requests Being Prepared by Util for Sys on Conventional Hydrostatic TestingHydrostatic
ML20044B30012 July 1990Provides Written Confirmation of Util Electronic Transfer of Funds to NRC on 900711 in Payment of Invoice Number I1050
ML20044B18410 July 1990Requests Approval of Temporary non-code Repair & Augmented Insp of Svc Water Piping,Per 900626 TelconCondition Adverse to Quality
ML20055F7069 July 1990Responds to NRC Re Dcrdr Requirements as Specified in Suppl 1 to NUREG-0737.DCRDR Corrective Actions Implemented & Mods Determined to Be Operational Prior to Startup Following Seventh Plant Refueling Outage