Issue date | Title | Topic | |
---|---|---|---|
RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | 13 July 2022 | Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies | Earthquake Fire Protection Program |
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | 30 June 2022 | Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
RS-22-006, Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel | 20 January 2022 | Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel | Anticipated operational occurrence Post Accident Monitoring Fuel cladding |
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | 4 January 2021 | Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | Nondestructive Examination |
SVP-20-074, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report | 8 October 2020 | Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report | Post Accident Monitoring |
RS-20-086, Renewed Facility Operating License Nos. DPR-29 and DPR-30 | 24 September 2020 | Renewed Facility Operating License Nos. DPR-29 and DPR-30 | Exemption Request Pandemic Coronavirus COVID-19 |
RS-19-049, Submittal of 10 CFR 50.46 Annual Report | 2 May 2019 | Submittal of 10 CFR 50.46 Annual Report | |
ML19064B371 | 5 March 2019 | Enclosure B - QDC-0000-N-1481, Revision 3, Quad Cities Units 1 & 2 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis. | |
ML19064B370 | 5 March 2019 | Enclosure a - QDC-7500-M-2341, Revision 0, Quad Cities Units 1 & 2 Secondary Containment Drawdown Analysis. | Stroke time GOTHIC |
RS-18-089, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) | 14 August 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) | High winds FLEX Tornado Generated Missile Design basis earthquake Spent Fuel Pool Instrumentation Severe Accident Management Guideline Containment Hardened Vent Battery sizing |
RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 14 August 2018 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Safe Shutdown High winds Ultimate heat sink Mission time Time to boil Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Emergency Lighting Functionality Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Time Critical Operator Action Battery sizing B.5.b Mitigating Strategies Flood Hazard Mitigation Strategies Assessment Hardened vent Fuel cladding |
ML16271A324 | 31 October 2016 | Technical Review Documentation for Flooding Hazard Reevaluation of Quad Cities Nuclear Power Station, Units 1 and 2 | Fukushima Dai-Ichi |
ML15251A384 | 31 August 2015 | Attachment 9 - NP-3305NP, Revision 1, Mechanical Design Report for Quad Cities and Dresden Atrium 10XN Fuel Assemblies - Licensing Report. (Non-Proprietary) | Anticipated operational occurrence Finite Element Analysis |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Through-Wall Leak |
ML14176A961 | 24 June 2014 | Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 | Fire Barrier Coatings Foreign Material Exclusion |
ML14101A228 | 7 April 2014 | Holtec International Report No. HI-2125245, Revision 5, Licensing Report for Quad Cities Criticality Analysis for Inserts. | Fuel cladding |
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | 19 December 2013 | Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. | Safe Shutdown Reactor Vessel Water Level Mission time Stroke time Post Accident Monitoring Scram Discharge Volume MELLLA |
ML13317A957 | 20 November 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Quad Cities Nuclear Power Station, TAC Nos.: MF1048 and MF1049 | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Fukushima Dai-Ichi Frazil ice Earthquake Hardened vent |
ML13199A038 | 16 July 2013 | Attachment 5 - Holtec International Report No. HI-2125245, Revision 2, Licensing Report for Quad Cities Criticality Analysis for Inserts - Non Proprietary Version | Fuel cladding |
ML12361A093 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 10 of 15 | |
ML12361A086 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 4 of 15 | |
ML12361A087 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 5 of 15 | |
ML12361A089 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 6 of 15 | |
ML12361A090 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 7 of 15 | |
ML12361A091 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 8 of 15 | |
ML12361A092 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 9 of 15 | |
ML12361A094 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 11 of 15 | |
ML12361A096 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 13 of 15 | Scaffolding |
ML12361A111 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 1 of 15 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Arc flash Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake Scaffolding Weak link |
ML12361A112 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 2 of 15 | |
ML12361A110 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 10 of 10 | Fukushima Dai-Ichi Earthquake Scaffolding |
ML12361A109 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 9 of 10 | Scaffolding |
ML12361A108 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 8 of 10 | Scaffolding |
RS-12-169, Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 3 of 15 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 3 of 15 | |
ML12361A095 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 12 of 15 | Scaffolding |
ML12361A107 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 7 of 10 | Scaffolding |
ML12361A106 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 6 of 10 | |
ML12361A105 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 5 of 10 | |
ML12361A104 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 4 of 10 | |
ML12361A103 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 3 of 10 | |
ML12361A101 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 2 of 10 | |
ML12361A100 | 31 October 2012 | Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 1 of 10 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Arc flash Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake Scaffolding Weak link |
ML12361A099 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 15 of 15 | Fukushima Dai-Ichi Earthquake Scaffolding |
ML12361A098 | 31 October 2012 | Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 14 of 15 | Scaffolding |
ML13199A039 | 30 July 2009 | Attachment 8 - Netco Report NET-259-03, Revision 5, Material Qualification of Alcan Composite for Spent Fuel Storage | Boric Acid |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 | Reserve Station Service Transformer Power change |
RS-07-157, Request for Technical Specification Change for Minimum Power Ratio Safety Limit | 20 November 2007 | Request for Technical Specification Change for Minimum Power Ratio Safety Limit | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
SVP-07-027, 90-Day Post Outage ISI Letter, Dated July 14, 2006 | 5 May 2007 | 90-Day Post Outage ISI Letter, Dated July 14, 2006 | Hydrostatic VT-2 Moisture barrier Liquid penetrant |
LR-N07-0034, C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions. | 31 January 2007 | C.D.I. Technical Memorandum No. 06-23NP, Revision 1, Comparison of the Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions. | Flow Induced Vibration |
ML063460131 | 7 December 2006 | Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier | Deep Dose Equivalent Fuel cladding |