Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 4 of 10
ML12361A104
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/31/2012
From: Delaney M
Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
Shared Package
ML123620010 List:
References
RS-12-169 12Q0108.40-R-001, Rev 3
Download: ML12361A104 (108)


Text

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4 Status: [Yi] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2308 Equipment Class:

(6) Vertical Pumps Equipment

Description:

UNIT 1 HPCI AUX OIL PUMP Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-ae

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

.3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

No Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Not Applicable Mounted to checkered plate.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-212

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2308 Equipment Class:

(6) Vertical Pumps Equipment

Description:

UNIT 1 HPCI AUX OIL PUMP

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/23/2012 Only motor is accessible. Pump is submerged in oil.

Evaluated by:

Q9J-AQk-6 David Carter Date:

10/4/2012 1*..'/V James Griffith 10/4/2012 C-213

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status: LYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2308 Equipment Class:

(6) Vertical Pumps Equipment

Description:

UNIT 1 HPCI AUX OIL PUMP Photos C-214

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status: l N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2308 Equipment Class:

(6) Vertical Pumps

_ F C-215

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2310 Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

COOLER U-1 HPCI OIL Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Supported from brackets from turbine skid via a U-bolt at each end.

2.

Is the anchorage free of bent, broken, missing or loose hardware?

No Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft tarqets free from impact by nearby equipment or structures?

Yes C-216

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2310 Equipment Class:

(21) Tanks and Heat Exchangers EauiDment Descriotion:

COOLER U-1 HPCI OIL

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

I pipe (approximately 3-inch diameter) contacts grating support. Pipe is robust. Judged to be acceptable.

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/23/2012 Evaluated by:

Q.JAJ, David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-217

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status:

Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2310 Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

COOLER U-1 HPCI OIL Photos uuaa UIIles 1 It Uuao L,IlTes "

C-218

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status: EYII N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2310 Equipment Class:

(21) Tanks and Heat Exchangers C-219

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: F]

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2399-15-PCV Equipment Class:

(7) Fluid-Operated Valves Eauioment Descriotion:

U-1 HPCI GL SEAL CONDENSER COND PMP DSCH PCV Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-220

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2399-15-PCV Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

U-1 HPCI GL SEAL CONDENSER COND PMP DSCH PCV Interaction Effects 7,

Are soft targets free from impact by nearby equipment or structures?

Yes 3/4-inch clearance between operator and gallery judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/23/2012 Evaluated by:

AQJ*4*-O.k David Carter Date:

10/4/2012

(*

B '4*

James Griffith 10/4/2012 C-221

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2399-15-PCV Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

U-1 HPCI GL SEAL CONDENSER COND PMP DSCH PCV C-222

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: [TI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

inmýnt MlOarinfin.

1-2399-1 5-PCV (7) Fluid-Operated Valves I I_1 wDII AL COI C-223

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: FYi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-2399-15-PCV Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

U-1 HPCI GL SEAL CONDENSER COND PMP DSCH PCV C-224

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

125 VDC BATT 1 Equipment Class:

(15) Batteries on Racks Equipment

Description:

BATTERY, 125V Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 628.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoracie

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Minor shrinkage cracks judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes C-225

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

125 VDC BATT 1 Equipment Class:

(15) Batteries on Racks Equipment

Description:

BATTERY, 125V Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Softeners in place between batteries and between the batteries and racks in place to mitigate impacts.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could

.Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Each leg anchored by a single 3/8" Wedge type expansion anchor through a 3x3x1/4" clip angle that is thru-bolted thru the tube leg.

Seismic Walkdown Team: D. Carter & J. Griffith,- 8/20/2012 Evaluated by:

190AQ10 David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-226

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Equipment

Description:

125 VDC BATT 1 (15) Batteries on Racks BATTERY, 125V Photos I

I I

Photos C-227

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

125 VDC BATT 1 Equipment Class:

(15) Batteries on Racks C-228

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

125 VDC BATT 1 Equipment Class:

(15) Batteries on Racks C-229

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: F] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-3903 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, DG COOLING - Ul DIESEL GENERATOR COOLING WATER PUMP Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 547.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space'is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-230

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: FY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-3903 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, DG COOLING - Ul DIESEL GENERATOR COOLING WATER PUMP

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Pump anchored by six - 7/8" (3 per side) cast-in-place anchors.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 Evaluated by:

Q.-JQJk David Carter Date:

10/4/2012 "e

James Griffith 10/4/2012 C-231

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-3903 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, DG COOLING - U1 DIESEL GENERATOR COOLING WATER PUMP C-232

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-3903 Equipment Class:

(5) Horizontal Pumps C-233

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-3903 Equipment Class:

(5) Horizontal Pumps C-234

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4600A Equipment Class:

(12) Air Compressors Equipment

Description:

TANK, AIR RECEIVER - RECEIVER GAS (IDNS PRESSURE VESSEL)

Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Not Applicable Mounted on the air start skid.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-235

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status: FY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4600A Equipment Class:

(12) Air Compressors EauiDment DescriDtion:

TANK. AIR RECEIVER - RECEIVER GAS (IDNS PRESSURE VESSEL)

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes All lines driven by air start skid.

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/21/2012 Evaluated by:

PJ*iQk David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-236

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status:

Y-1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4600A Equipment Class:

(12) Air Compressors Equipment

Description:

TANK, AIR RECEIVER - RECEIVER GAS (IDNS PRESSURE VESSEL)

Photos C-237

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4600A Equipment Class:

(12) Air Compressors C-238

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 3 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4604 Equipment Class:

(0) Other Equipment

Description:

DRYER, AIR Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595. 00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL, The space below each of the following questions may be used to record the results of judgments and findings: Additional space is provided at the end of this checklist for documenting other comments..

Anchora-ge

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Component is mounted in the piping. The piping is well supported.

Yes Interaction Effects

7.

Are soft tarqets free from impact by nearby equipment or structures?

Not Applicable C-239

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 3 Status: FY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4604 Equipment Class:

(0) Other Eauipment

Description:

DRYER, AIR

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 Evaluated by.

-JAIQk David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-240

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 3 Status: E--I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

EauiDment DescriDtion:

1-4604 (0) Other DRYER. AIR Photos C-241

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: FYI] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4605 Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

TANK, BLOWDOWN Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-242

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4 Status:

Y-jJ N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4605 Equipment Class:

(21) Tanks and Heat Exchangers Eauioment Descriotion:

TANK. BLOWDOWN Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft tarmets free from impact bv nearby eauioment or structures?

Yes C-243

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status:

Y-- N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4605 Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

TANK, BLOWDOWN

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?

Yes Comments SEWS Anchorage Notes:

Anchorage: 36" L x 6 1/2" OD tank on two trunnion supports 2" Dia. X 28" Ht. One trunnion is welded to the air receiver skid and the other trunnion is attached to a base plate which is bolted to floor with four 3/8" CEA.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 Evaluated by:

David Carter Date:

10/12/2012 James Griffith 10/12/2012 C-244

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status: [-ý N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4605 Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

TANK, BLOWDOWN C-245

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status: EFi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4605 Equipment Class:

(21) Tanks and Heat Exchangers C-246

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4641-42A Equipment Class:

(18) Instruments on Racks Equipment

Description:

SWITCH, PRESS. - *U1 DG PS 1-4641-42A SHUTOFF VLV Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

  • 3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-247

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4641-42A Equipment Class:

(18) Instruments on Racks Equipment

Description:

SWITCH, PRESS. - *U1 DG PS 1-4641-42A SHUTOFF VLV

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 Evaluated by:

QJAI,.

David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-248

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4641-42A Equipment Class:

(18) Instruments on Racks Equipment

Description:

SWITCH, PRESS. - *Ul DG PS 1-4641-42A SHUTOFF VLV Photos 0-/-I-I IL uao LIIles 140 C-249

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4641-42A Equipment Class:

(18) Instruments on Racks EauiDment DescriDtion:

SWITCH. PRESS. - *U1 DG PS 1-4641-42A SHUTOFF VLV C-250

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4699-226 Equipment Class:

(7) Fluid-Operated Valves EauiDment DescriDtion:

VALVE, AIR START RELAY - AIR LINE TO U-1 DG AIR START MOTOR AO Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-251

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: LYii N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4699-226 Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

VALVE, AIR START RELAY - AIR LINE TO U-1 DG AIR START MOTOR AO Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

P11-4641-44 has 1/4-inch clearance to DG skid. There is a possibility that during a seismic event, the gauge could displace and contact the EDG skid.

Due to the minimal weight of the gauge, the seismic displacement and inertia gained will be minimal. As such, the gauge impact with the skid will not cause significant damage to the gauge. Any damage to the gauge would be limit to minor surface damage. The gauge would not break apart, nor would it become unconnected from the air line. Therefore there is no concern that the equipment would be effected during a seismic event.

Judged to be acceptable.

See IR 1403063.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 C-252

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4699-226 Equipment Class:

(7) Fluid-Operated Valves Equipment

Description:

VALVE, AIR START RELAY - AIR LINE TO U-1 DG AIR START MOTOR AO Evaluated by:

David Carter Date:

10/4/2012 James Griffith 10/4/2012 Photos C-253

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: FY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4699-226 Equipment Class:

(7) Fluid-Operated Valves C-254

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: ElI1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-4699-226 Equipment Class:

(7) Fluid-Operated Valves C-255

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: Eli N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5202 Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

TANK, FUEL OIL DAY Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes 2 bolts with minor lack of thread engagement judged to be acceptable.

Shims stacked between saddle and W18 at west support. Judged to be acceptable.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Minor surface corrosion on W18 judged to be acceptable.

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Not Applicable Attached to W18s not anchored to concrete.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-256

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5

.Status: FY! N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5202 Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

TANK, FUEL OIL DAY Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

This 750 gal. capacity diesel fuel oil day tank is mounted on 2 saddles. Each saddle is anchored to a WF beam 18" in depth by 4 - 7/8" steel to steel bolts.

The WF beam is then attached to floor beam and the bottom 5" of the WF is buried in concrete.

Seismic Walkdown Team: D. Carter & J. Griffith on 8/21/12 Evaluated by:

David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-257

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5202 Equipment Class:

Eauipment

Description:

(21) Tanks and Heat Exchangers TANK, FUEL OIL DAY C-258

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: [-* N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5202 Equipment Class:

(21) Tanks and Heat Exchangers C-259

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5202 Equipment Class:

(21) Tanks and Heat Exchangers C-260

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status:

Y-I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5203 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, FUEL OIL TRANSF Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes C-261

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: L* N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5203 Equipment Class:

(5) Horizontal Pumps Equipment

Description:

PUMP, FUEL OIL TRANSF Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Small pump on a 27" long by 12" wide skid that is anchored through a 2-1/2" high grout pad w/ four 1/2" Dia.

cast in place bolts.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 Evaluated by:

P(illok. David Carter Date:

10/4/2012

ý-

6' Ae James Griffith 10/4/2012 C-262

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: r-Y-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Eauibment

Description:

1-5203 (5) Horizontal Pumps PUMP, FUEL OIL TRANSF Photos

  • -L 1-1i uuao ui.les Uvdo C-263

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status:

Y--I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5203 Equipment Class:

(5) Horizontal Pumps C-264

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5203 Equipment Class:

(5) Horizontal Pumps C-265

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: F[I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5727 Equipment Class:

(9) Fans Equipment

Description:

FAN, ROOM VENTILAT - DG ROOM VENT FAN Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Minor bends in 3 longer rod hangers judged to be acceptable.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Hung from steel above.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-266

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5727 Equipment Class:

(9) Fans Equipment

Description:

FAN, ROOM VENTILAT - DG ROOM VENT FAN

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Fan within large duct supported by 4 rod hangers from ceiling, one hanger is shorter than the others.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 Evaluated by:

RJAIO,7 David Carter Date:

10/4/2012

  • B-,e James Griffith 10/4/2012 C-267

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5727 Equipment Class:

(9) Fans Equipment

Description:

FAN, ROOM VENTILAT - DG ROOM VENT FAN C-268

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5727 Equipment Class:

(9) Fans C-269

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: F-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5727 Equipment Class:

(9) Fans C-270

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: FY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5745A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 1A RHRSW PMP CUBICAL COOLER Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 547.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Viewed 3 of 4 anchors in each anchored leg from floor. Welded legs appear to be acceptable. Remaining anchors could not be viewed due visibility from floor. Visible anchors inspection leads to the conclusion all anchors are acceptable.

Not Applicable Yes C-271

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: LII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5745A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 1A RHRSW PMP CUBICAL COOLER Interaction Effects

7.

Are soft targets-free from impact by nearby equipment or structures?

Tubes in contact with one another. Flexible and judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry. block walls not likely to collapse onto the equipment?

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

I Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/22/2012 Evaluated by:

Q,&I.

David Carter Date:

10/4/2012 T_'

James Griffith 10/4/2012 C-272

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: FY-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5745A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - IA RHRSW PMP CUBICAL COOLER Photos 8-C-273

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: lYII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5745A Equipment Class:

(10) Air Handlers o-zz-1z uuao LtIiles Uu4 C-274

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: [II N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5745A Equipment Class:

(10) Air Handlers Eauioment

Description:

COOLER. CUBICLE - 1A RHRSW PMP CUBICAL COOLER 8-22-12 Quad Cities 097 C-275

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5747 Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - U1 HPCI ROOM EMERGENCY COOLER Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes A minor bend in hanger rod judged to be acceptable.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

.Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-276

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5747 Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - U1 HPCI ROOM EMERGENCY COOLER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Cooler is restrained to wall. The cooler is restrained to prevent damage due to relative movement between the cooler and the attached piping.

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?

Yes Comments SEWS Anchorage Notes:

Cooler hung on 5 - 5/8" rods. Each rod is anchored by 4 - 1/2" concrete expansion anchors.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/23/2012 Evaluated by:

QJVJQJk David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-277

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

EaUioment DescriDtion:

1-5747 (10) Air Handlers COOLER. CUBICLE - U1 HPCI ROOM EMERGENCY COOLER Photos C-278

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

1-5747 (10) Air Handlers C-279

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5747 Equipment Class:

(10) Air Handlers

.E - U1 C-280

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status: FTI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

inmmn1 nftprintin-1-5747 (10) Air Handlers COOLER, CUBICLE - Ul HPCI ROOM EMERGENCY COOLER C-281

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 3 Status: [ ] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5748A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 1A CS/RCIC PMP RM COOLER Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 560.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-282

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 3 Status: L-J N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5748A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 1A CS/RCIC PMP RM COOLER

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Cooler is restrained to wall. The cooler is restrained to prevent damage due to relative movement between the cooler and the attached piping.

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Cooler hung on 6 - 5/8" rods. Each rod is anchored by 4 - 1/2" concrete expansion anchors.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/23/2012 Evaluated by:

David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-283

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 3 Status: Lull N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5748A Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 1A CS/RCIC PMP RM COOLER Photos C-284

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status: Lull N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5749 Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 1DG CW PMP CUB COOLER Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 547.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-285

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5749 Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 1DG CW PMP CUB COOLER Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Tube in contact with pipe insulation. Judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 Evaluated by:

,QJA/Qk David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-286

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: F-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5749 Equipment Class:

(10) Air Handlers Equipment

Description:

COOLER, CUBICLE - 1DG CW PMP CUB COOLER Photos C-287

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5749 Equipment Class:

(10) Air Handlers 8-21-12 Quad Cities 049 C-288

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: E1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5749 Equipment Class:

(10) Air Handlers E-1 C-289

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status: Y NU Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-5749 Equipment Class:

(10) Air Handlers C-290

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6601 Equipment Class:

(17) Engine-Generators Equipment

Description:

DG, UNIT 1 Project:

Quad Cities I SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Minor spalling in grout pads judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification. is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-291

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: Lii N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6601 Equipment Class:

(17) Engine-Generators Equipment

Description:

DG, UNIT 1

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Anchored by 14 cast-in-place 1.25" diameter bolts.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012.

Evaluated by:

QJA,-

David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-292

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status:

YLI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6601 Equipment Class:

(17) Engine-Generators Equipment

Description:

DG, UNIT 1 Photos C-293

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: FI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6601 Equipment Class:

(17) Engine-Generators C-294

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6601 Equipment Class:

(17) Engine-Generators C-295

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status: [*

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6601 Equipment Class:

(17) Engine-Generators C-296

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status:

Y7I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6601 Equipment Class:

(17) Engine-Generators C-297

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6654 Equipment Class:

(21) Tanks and Heat Exchangers EQuipment

Description:

HX, DG LUBE OIL Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Top clamped and bottom bolted to frame attached to DG skid.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Not Applicable Attached to frame on DG skid.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-298

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6654 Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

HX, DG LUBE OIL Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Not Applicable Heat exchanger has no soft targets.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

All pipes are mounted on the same DG skid the heat exchanger. No relative movement that will result in adverse condition.

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 Evaluated by:

,Q-JAIxZ/07 David Carter Date:

10/4/2012

. VK James Griffith 10/4/2012 C-299

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

EclUiDment DescriDtion:

1-6654 (21) Tanks and Heat Exchanqers HX. DG LUBE OIL Photos C-300

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status: E-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6654 Equipment Class:

(21) Tanks and Heat Exchangers C-301

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: LYI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6661A Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

HX, DG COOLING Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Two U-bolts to support brackets that are bolted to frame which is attached to DG skid.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Not Applicable Heat exchanger mounted to DG skid.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-302

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6661A Equipment Class:

(21) Tanks and Heat Exchangers Eauipment

Description:

HX, DG COOLING

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/21/2012 Evaluated by:

David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-303

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: E* N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6661A Equipment Class:

(21) Tanks and Heat Exchangers Equipment

Description:

HX, DG COOLING C-304

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6661A Equipment Class:

(21) Tanks and Heat Exchangers C-305

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6661A Equipment Class:

(21) Tanks and Heat Exchangers C-306

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6705-13-1 Equipment Class:

(3) Medium Voltage Switchgear Equipment

Description:

SWGR 13-1 Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 639.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Exterior base anchorage at south end observed. Top east-west wall braces observed. No anchorages observed at north (exterior) end. See original SQUG notes for anchorage.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Unknown Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-307

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: F-Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6705-13-1 Equipment Class:

(3) Medium Voltage Switchgear Equipment

Description:

SWGR 13-1

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable. Masonry wall restrained at top.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/20/2012 Per Operations, switchgear door was not opened.

Evaluated by:

David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-308

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: LYll N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6705-13-1 Equipment Class:

(3) Medium Equipment

Description:

SWGR 13-1 Voltage Switchgear Photos C-309

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status: E-KI N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6705-13-1 Equipment Class:

(3) Medium Voltage Switchgear a-zu-iz uuaG unies -nd-5 tz)

C-310

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6705-13-1 Equipment Class:

(3) Medium Voltage Switchgear C-311

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-6705-13-1 Equipment Class:

(3) Medium Voltage Switchgear C-312

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100 Equipment Class:

(4) Transformers Equipment

Description:

TRANSFORMER 18 4160V-480V Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 639.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Bears against the foundation at floor, braced to wall. Will not move laterally.

2.

Is the anchorage free of bent, broken, missing or loose hardware?

No Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-313

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100 Equipment Class:

(4) Transformers Equipment

Description:

TRANSFORMER 18 4160V-480V

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable. Masonry wall restrained at edges and judged to be acceptable.

9..Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/20/2012 Transformer has been replaced since SQUG walkdown.

Evaluated by:

dQ-JIIQk David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-314

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status: F-j N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100 Equipment Class:

(4) Transformers Equipment

Description:

TRANSFORMER 18 4160V-480V Photos C-315

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: FYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100 Equipment Class:

(4) Transformers C-316

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status: EZII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100 Equipment Class:

(4) Transformers C-317

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status: FI N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100 Equipment Class:

(4) Transformers a-C-318

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status: Fj N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100 Equipment Class:

(4) Transformers C-319