Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 5 of 10
ML12361A105
Person / Time
Site: Quad Cities 
Issue date: 10/31/2012
From: Delaney M
Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
Shared Package
ML123620010 List:
References
RS-12-169 12Q0108.40-R-001, Rev 3
Download: ML12361A105 (70)


Text

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet I of 9 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100-18 Equipment Class:

(2) Low Voltage Switchgear Equipment

Description:

SWGR 18 Project:

Quad Cities I SWEL Location (Bldg, Elev, Room/Area):

RB, 647.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracking in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage shown on drawings 4E-1054A, Rev. L and 4E-1054D, Rev. F.

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-320

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 9 Status:

Y--J N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100-18 Equipment Class:

(2) Low Voltage Switchgear Ecquipoment

Description:

SWGR 18 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Trolley on top currently at middle of switchgear, away from stops. Current position judged to be acceptable. Pin recommended as permanent fix.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Adjacent masonry wall at north end restrained at edges.

Light fixture at south end of switchgear 18 has open S-hooks; mitigated by position and power cord tether to wall. Judged to be acceptable. See IR 1403072.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team:

D. Carter & J. Griffith - 8/20/2012 K. Hall & J. Kim - 9/17/2012 Evaluated by:

David Carter AQ."-JE:-' James Griffith)- "

Date:

10/4/12 Kevin Hall & Julie Kim 10/5/12 C-321

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 9 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100-18 Equipment Class:

(2) Low Voltage Switchgear Equipment

Description:

SWGR 18 8-20-12 Quad Cities 148 10 8-20-12 Quad Cities 148 (12)

C-322

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 9 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100-18 Equipment Class:

(2) Low Voltage Switchgear E uiment Descri tion:

SWGR 18 8-20-12 Quad Cities 148 (13) 8-20-12 Quad Cities 148 (14)

C-323

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 9 Status:

Y--I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100-18 Equipment Class:

(2) Low Voltage Switchgear C-324

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 9 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100-18 Equipment Class:

(2) Low Voltage Switchgear C-325

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 9 Status: [1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100-18 Equipment Class:

(2) Low Voltage Switchgear MG 7257 C-326

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 9 Status: [Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100-18 Equipment Class:

(2) Low Voltage Switchgear MG 7262 MG 7263 C-327

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 9 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7100-18 Equipment Class:

(2) Low Voltage Switchgear MG_7265 MG_7266 C-328

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18195 Equipment Class:

(1) Motor Control Centers Eauioment

Description:

MCC -MCC 18/19-5 Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-329

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: F-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18195 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC -MCC 18/19-5

8.

Are overhead equipment, distribution systems; ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Light fixture at south end of MCC has an open S-hook each end. See IR 1404697.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/22/2012 Evaluated by:

Q)I1'. David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-330

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: EZII N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18195 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC -MCC 18/19-5 Photos C-331

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: EZ-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18195 Equipment Class:

(1) Motor Control Centers C-332

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18195 Equipment Class:

(1) Motor Control Centers C-333

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18-1B Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 18-16 Project:

Quad Cities I SWEL Location (Bldg, Elev, Room/Area):

RB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-334

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18-1B Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 18-1B Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

There is a small gap between MCC 18-1B and 18-1A. The tray run and supports on attached to the top of MCCs mitigate potential seismic interaction between 18-1B and 18-4A.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes.

adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/22/2012 Evaluated by:

QJAI&-

David Carter Date:

10/16/2012 James Griffith 10/16/2012 C-335

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status: LY-ý N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18-1B Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC-MCC 18-1B C-336

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18-1B Equipment Class:

(1) Motor Control Centers RA C-337

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: ELI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18-2 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 18-2 Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 615.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

1-inch long, 1/4-inch fillet stitch welds

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Only one weld at back of cabinet on east end. Judged to be acceptable due to abundance of welds elsewhere (13 stitches on front of cabinet, 11 on back).

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

No Yes Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-338

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: Eli N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18-2 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 18-2 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Conduit associated with phone box attached to MCC has sufficient flexibility.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Adjacent teletower scaffold greater than its height + 1-ft from the MCC and judged to be acceptable. Loose components on top of teletower were relocated to the floor.

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/20/2012 Evaluated by:.

(2,JA/*k David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-339

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: KI-N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18-2 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 18-2 Photos I

8-20-12 Quad Cities 001 (2)

C-340

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: [*

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18-2 Equipment Class:

(1) Motor Control Centers

~nufinManefaorinfi~n-I&ACrC - KMCCI 1A27 C-341

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-18-2 Equipment Class:

(1) Motor Control Centers L

-12 Quad Cities 001 (9)

C-342

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 3 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-19-1 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC-MCC 19-1 Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-343

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 3 Status: FYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-19-1 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 19-1

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes.

adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/22/2012 Evaluated by:

,OA1,-4--

David Carter Date:

10/4/2012

ý-

C. Ae James Griffith 10/4/2012 C-344

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 3 Status: r-* N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-7800-19-1 Equipment Class:

(1) Motor Co Eauioment DescriDtion:

MCC - MCC

)ntrol Centers 19-1 Photos C-345

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 8 Status: LIII N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8300-1 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR #1, 125V Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 615.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the. Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracking in floor. Judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-346

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 8 Status: [lY N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8300-1 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR #1, 125V

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Adjacent masonry wall restrained at top indicating that the wall was designed to resist lateral loads. Therefore it is judged to be seismically adequate.

Emergency light 16B has loose nuts on the hold down rods. The light is still restrained and will not become an interaction concern. See IR 1403065.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Angles are welded to the base channel to accommodate anchorage. There are three angle tabs welded to the base channel on each side of the charger. Each angle tab is bolted to the floor with a 3/8" dia. expansion anchor.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/20/2012 Evaluated by:

P,-JJ44-David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-347

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 8 Status: FYi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8300-1 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR #1, 125V Photos C-348

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 8 Status: r N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8300-1 Equipment Class:

(16) Batt*~ry Chargers and Inverters 4#4

'1 01 C-349

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 8 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8300-1 Equipment Class:

(16) Battery Chargers and Inverters C-350

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 8 Status: E-ý N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8300-1 Equipment Class:

(16) Battery Chargers and Inverters C-351

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 8 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8300-1 Equipment Class:

(16) Battery Chargers and Inverters C-352

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 8 Status: [*

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8300-1 Equipment Class:

(16) Battery Chargers and Inverters C-353

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4' Status: ELI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8350 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR #1, 250V Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 615.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoracie

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose. hardware?

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Shrinkage crack in floor near anchor. Crack is sufficient distance to not affect the anchor capacity. Judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes Interaction Effects

7.

Are soft tarqets free from impact by nearby equipment or structures?

Yes C-354

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status: F-ý N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8350 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR #1, 250V

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable, Adjacent masonry wall restrained at top indicating that the wall was designed to resist lateral loads. Therefore it is judged to be seismically adequate.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

IR 1403079:

During the Seismic Walkdowns it was identified that there are three screws missing (two on the right side and one on the left side) and I screw loose (on the left side) of the 250VDC Charger. Based on Engineering Judgment the significant number of remaining screws per side are adequate to maintain the connection of the panel during a seismic event, thus preventing any adverse, impact to the charger or surrounding equipment.

Comments SEWS Anchorage Notes:

Angles are welded to the base channel to accommodate anchorage. There are three angle tabs welded to the base channel on each side of the charger. Each angle tab is bolted to the floor with a 3/8" dia. expansion anchor.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/20/2012 C-355

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status: F[] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Eauioment Descriotion:

1-8350 (16) Battery Chargers and Inverters CHRGR #1. 250V Evaluated by:

A

/'AIQ" David Carter Date:

10/4/2012 A*1 James Griffith 10/4/2012 C-356

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status: FYI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8350 Equipment Class:

(16) Battery Chargers and Inverters C-357

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 8 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VALVE, PNUEMATIC - U-I CONTAINMENT IG DW COOLER UPSTREAM Eauipment

Description:

AIR SMPL VLV Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-358

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 8 Status: ELI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VALVE, PNUEMATIC - U-1 CONTAINMENT 1G DW COOLER UPSTREAM Equipment

Description:

AIR SMPL VLV Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Air lines for solenoid valves associated with 880 1A, B, and C are in contact with pipe insulation. Valves fail closed and are judged to be acceptable. See IR 1403596.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Masonry wall with stacked bond approximately 5'-6" high in vicinity of valve.

Wall is safety-related per B-1734 (Walls 42, 43, and 44).

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/22/2012 Evaluated by:

  • P/JAI4/k-David Carter Date:

10/4/2012 James Griffith 10/4/2012 C-359

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 8 Status: 1111 N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VALVE, PNUEMATIC - U-1 CONTAINMENT 1G DW COOLER UPSTREAM Equipment

Description:

AIR SMPL VLV O-LL-IL tuuaao,;ties ut5 C-360

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 8 Status: [Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VALVE, PNUEMATIC - U-1 CONTAINMENT 1G DW COOLER UPSTREAM C-361

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 8 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VALVE, PNUEMATIC - U-1 CONTAINMENT 1 G DW COOLER UPSTREAM AIMr-I"bT /ll"*l

%1[ %1 0-C-362

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 8 Status: FY-jj N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

1-8801A-AO (7) Fluid-Ooerated Valves VALVE, PNUEMATIC - U-1 CONTAINMENT 1 G DW COOLER UPSTREAM AIR SIMPL VLV C-363

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 8 Status: ELI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VALVE, PNUEMATIC - U-1 CONTAINMENT 1 G DW COOLER UPSTREAM C-364

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 8 Status: lYý N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

1-8801 A-AO (7) Fluid-Operated Valves VALVE, PNUEMATIC - U-1 CONTAINMENT 1G DW COOLER UPSTREAM AIR SMPL VLV C-365

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet I of 6 Status: [-

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-29A Equipment Class:

(18) Instruments on Racks Equipment

Description:

INSTR RACK 2201-29A Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinas. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in wall judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-366

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: FIi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-29A Equipment Class:

(18) Instruments on Racks EauiDment DescriDtion:

INSTR RACK 2201-29A Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Flexible conduits touch duct judged to be acceptable.

Minimum of 3/4-inch clearance between tubes to duct behind rack judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Tube in contact with 2 insulated pipes. Adequate flexibility throughout.

Judged to be acceptable.

Comments SEWS Anchorage Notes:

Rack is braced back to reinforced concrete wall and anchored by 1/2" diameter concrete expansion anchors.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/23/2012 Evaluated by:

QJAR4,.- David Carter Date:

10/16/2012 James Griffith 10/16/2012 C-367

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-29A Equipment Class:

(18) Instruments on Racks Equipment

Description:

INSTR RACK 2201-29A Photos C-368

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status:

Y-- N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-29A Equipment Class:

(18) Instruments on Racks Equipment

Description:

INSTR RACK 2201-29A Quad Cities 027 C-369

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: 2201-29A Equipment Class:

(18) Instruments on Racks C-370

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status: [*

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-29A Equipment Class:

(18) Instruments on Racks C-371

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: FI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-32 Equipment Class:

(18) Instruments on Racks Equipment

Description:

RACK, AUTO BLOWDOWN Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraqe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

One anchor had a gap as identified in the SQUG notes. Braces to dry well wall added to resolve concern. Anchorage judged to be acceptable.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4. -Is the anchorage free of visible cracks in the concrete near the anchors?

No Yes Yes Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-372

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: FY1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-32 Equipment Class:

(18) Instruments on Racks EauiDment DescriDtion:

RACK. AUTO BLOWDOWN Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Gap to adjacent rack 2201-5 approximately 1/8-inch at top brace. Cabinet 32 and Rack 5 are stiff longitudinally. It is judged that the cabinet and rack will not deflect sufficiently during a seismic event to cause an interaction concern.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Minor concrete damage in ceiling above judged to not be a threat at this time.

Tracked by station structures monitoring program. See IR 1404147.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: D. Carter & J. Griffith - 8/22/2012 Evaluated by:

P

/JA0Q, 4k-David Carter Date:

10/4/2012 D. A James Griffith 10/4/2012 C-373

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

Eauioment

Description:

2201-32 (18) Instruments on Racks RACK. AUTO BLOWDOWN C-374

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status:

T1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-32 Equipment Class:

(18) Instruments on Racks

.OWN C-375

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status: [-* N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-32 Equipment Class:

(18) Instruments on Racks C-376

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status:

YJ N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-32 Equipment Class:

(18) Instruments on Racks C-377

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-32 Equipment Class:

(18) Instruments on Racks Eauioment Descriotion:

RACK. AUTO BLOWDOWN C-378

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status:

Y-- N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-59A Equipment Class:

(18) Instruments on Racks Equipment

Description:

RACK Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 554.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Minor corrosion judged to be acceptable. Several anchors with minor lack of thread engagement Judged to be acceptable.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes C-379

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: FYi N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-59A Equipment Class:

(18) Instruments on Racks Equipment

Description:

RACK

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

Yes Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Instrument rack anchored by 1/2" concrete expansion anchors on floor and braced back to R/C wall by 1/2" concrete expansion anchors:

Seismic Walkdown Team: D. Carter & J. Griffith - 8/23/2012 Evaluated by:.

JAIQk-David Carter Date:

10/4/2012 4e James Griffith 10/4/2012 C-380

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-59A Equipment Class:

(18) Instruments on Racks Eauipment

Description:

RACK Quad Cities 212 C-381

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: [I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-59A Equipment Class:

(18) Instruments on Racks C-382

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: LY-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-59A Equipment Class:

(18) Instruments on Racks C-383

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status: LII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-7 Equipment Class:

(18) Instruments on Racks Equipment

Description:

RACK Project:

Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findincis. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Minor lack of thread engagement on one anchor judged to be acceptable.

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Minor shrinkage cracks in wall judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Yes Yes Yes Yes Yes C-384

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: E-il N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-7 Equipment Class:

(18) Instruments on Racks Equipment

Description:

RACK Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Phone attached to rack with receiver in cradle. Rack is rigid and vertical seismic acceleration is minimal, therefore receiver will not jump off of cradle.

Phone judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Adjacent rack 2251-30A has 1/4-inch gap to rack 2201-7 at top. Racks stiff in longitudinal direction. Interaction due to deflection judged to be not credible.

Comments SEWS Anchorage Notes:

Instrument rack composed of angle iron and anchored by concrete expansion anchors and braced back to a reinforced concrete wall by structural rolled shapes.

Seismic Walkdown Team: D. Carter & J. Griffith - 8/22/2012 C-385

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: L-YI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-7 Equipment Class:

(18) Instruments on Racks Equipment

Description:

RACK Evaluated by:

,JZQ,-00 David Carter Date:

10/4/2012 49-e James Griffith 10/4/2012 C-386

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-7 Equipment Class:

(18) Instruments on Racks C-387

Quad Cities Generating Station Unit I 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: Eli N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-7 Equipment Class:

(18) Instruments on Racks C-388

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status: [*

N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2201-7 Equipment Class:

(18) Instruments on Racks Eauinment Descriotion:

RACK C-389