Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 11 of 15
ML12361A094
Person / Time
Site: Quad Cities 
Issue date: 10/31/2012
From: Delaney M
Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
Shared Package
ML123620010 List:
References
RS-12-169 12Q0108.40-R-002, Rev 3
Download: ML12361A094 (64)


Text

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 11 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-11B Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 28-1B Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-513

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 11 Status: L*j N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-1 B Equipment Class:

(1) Motor Control Centers EauiDment Descriotion:

MCC - MCC 28-1B Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

One door slightly askew but adequately latched; judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixture with an open S-hook. Hard targets mitigate effect of fixture; judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/6/2012 Evaluated by:

0 K James Griffith Date:

10/4/2012 A

Michael Wodarcyk 10/4/2012 C-514

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 11 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

EaUipment

Description:

2-7800-28-1 B (1) Motor Control Centers MCC - MCC 28-1B Photos C-515

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 11 Status: --I N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-1 B Equipment Class:

(1) Motor Control Centers C-516

Quad Cities Generating Station Unit 2 1200108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 11 Status: F-Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-IB Equipment Class:

(1) Motor Control Centers C-517

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 11 Status:

T N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-11B Equipment Class:

(1) Motor Control Centers C-518

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 11 Status:

Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-1B Equipment Class:

(1) Motor Control Centers C-519

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 11 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-1B Equipment Class:

(1) Motor Control Centers 20120806-QuadCities-2 096 C-520

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 11 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-1 B Equipment Class:

(1) Motor Control Centers C-521

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 11 Status: lYI1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-1 B Equipment Class:

(1) Motor Control Centers C-522

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 11 of 11 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-11B Equipment Class:

(1) Motor Control Centers 4D C-523

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 8 Status:

-Y-- N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-2 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 28-2 Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

TB, 615.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-524

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 8 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-2 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 28-2 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Emergency phone box conduit rigid and well-supported. Conduit 1/2-inch from MCC. Judged to be acceptable.

One door slightly bent at bottom. Door is adequately latched and judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/7/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-525

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 8 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-2 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 28-2 Photos C-526

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 8 Status: r--

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-2 Equipment Class:

(1) Motor Control Centers 20120807-QuadCities-2 113 C-527

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 8 Status: [YI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-2 Equipment Class:

(1) Motor Control Centers

=no iinovo~n# no~o&^Anfi~n-kRd'Y'

- kAlt' 9A.9D C-528

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 8 Status: EZ-1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-2 Equipment Class:

(1) Motor Control Centers 20120807-QuadCities-2 120 C-529

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 8 Status: r-ý N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-2 Equipment Class:

(1) Motor Control Centers 20120807-QuadCities-2 125 C-530

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 8 Status: rY-N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28-2 Equipment Class:

(1) Motor Control Centers C-531

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet I of 8 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28295 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 28/29-5 Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-532

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 8 Status: [L] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28295 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 28/29-5 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Minor deformation inbottom of one door. Latches are adequately engaged; door is judged to be acceptable.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/6/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-533

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 8 Status:

Y-I N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28295 Equipment Class:

(1) Motor Control Centers Eauipment DescriDtion:

MCC - MCC 28/29-5 Photos 20 C-534

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 8 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28295 Equipment Class:

(1) Motor Control Centers C-535

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 8 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28295 Equipment Class:

(1) Motor Control Centers C-536

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 8 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

2-7800-28295 (1) Motor Control Centers C-537

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 8 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28295 Equipment Class:

(1) Motor Control Centers C-538

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 8 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-28295 Equipment Class:

(1) Motor Control Centers C-539

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: [LI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-29-1 Equipment Class:

(1) Motor Control Centers EauiDment DescriDtion:

MCC - MCC 29-1 Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-540

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-29-1 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 29-1 Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

IR 1397864:

During the Seismic Walkdowns it was identified that one of the two latches on MCC 29-1 was not secured. The other latch is secured. The concern with unlatched door panels is that during a seismic event the door could open. If the door were to open, the doors could bang against the MCC and the impact could cause components within to change states. The other issue with open doors is that when the door is open the stiffness of the panel is reduced.

Because this MCC is not a tall MCC, as long as one of the latches is functional, the seismic acceptability of the MCC is not compromised.

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/6/2012 C-541

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status: FYI N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-29-1 Equipment Class:

(1) Motor Control Centers Eauioment Descriotion:

MCC - MCC 29-1 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 Photos C-542

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: r-* N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-29-1 Equipment Class:

(1) Motor Control Centers IhA(t" RAPP"

-4 C-543

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status: ETi N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-29-1 Equipment Class:

(1) Motor Control Centers C-544

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-29-1 Equipment Class:

(1) Motor Control Centers Equipment

Description:

MCC - MCC 29-1 20120806-QuadCities-2 119 20120806-QuadCities-2 120 C-545

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-7800-29-1 Equipment Class:

(1) Motor Control Centers C-546

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 10 Status: F-J N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR#2, 125V Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

TB, 615.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-qe

1. Is anchorage configuration verification required (i.e., is the item one of the 50%

Yes of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Shrinkage crack in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-547

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 10 Status: FYI1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR#2, 125V Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Door slightly sprung such that it could rattle at bottom. Operations confirmed that there are no relays in the battery charger. Judged to be acceptable. See IR 1419533.

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable. Masonry wall in vicinity restrained at top and judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

'10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes:

Angles are welded to the base channel to accommodate anchorage. Each of the six angles is bolted to the floor with one 3/8" dia. non shell expansion bolt.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/7/2012 Evaluated by:

4 4 James Griffith Date:

10/12/2012

/

Michael Wodarcyk 10/12/2012 C-548

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 10 Status: [-II N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR #2, 125V Photos C-549

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 10 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters C-550

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 10 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters C-551

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 10 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters C-552

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 10 Status: E[-1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters C-553

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 10 Status: [YI1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters C-554

Quad Cities Generating Station Unit 2 1200108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 10 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters C-555

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 10 Status: F] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8300-2 Equipment Class:

(16) Battery Chargers and Inverters C-556

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: jY-j N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8350 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR #2, 250V Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

TB, 615.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end 'of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one ofthe 50%

of SWEL items requiring such verification)?

2.

Is the anchorage free of bent, broken, missing or loose hardware?

No Yes Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Minor surface corrosion judged to be acceptable.

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes Minor shrinkage cracks in floor judged to be acceptable.

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-557

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status:

] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8350 Equipment Class:

(16) Battery Chargers and Inverters Equipment DescriDtion:

CHRGR #2. 250V Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/7/2012 Evaluated by:

0 VK James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-558

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8350 Equipment Class:

(16) Battery Chargers and Inverters Equipment

Description:

CHRGR #2, 250V Photos C-559

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8350 Equipment Class:

(16) Battery Chargers and Inverters C-560

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status: L-Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8350 Equipment Class:

(16) Battery Chargers and Inverters C-561

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8350 Equipment Class:

(16) Battery Chargers and Inverters C-562

Quad Cities Generating Station Unit 2 1200108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status: LIII N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8350 Equipment Class:

(16) Battery Chargers and Inverters C-563

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 10 Status:

Yt1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATIC, 3/4 - CONTAINMENT 2G DW COOLER UPSTREAM AIR Equipment

Description:

SMPL VLV Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

RB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-qe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SVVEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Not Applicable

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-564

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 10 Status: FY-j N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATIC, 3/4 - CONTAINMENT 2G DW COOLER UPSTREAM AIR Equipment

Description:

SMPL VLV Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Associated solenoid valve touches solid pipe insulation (typical for 2-8801A, B, and C valves). Valves fail closed upon loss of air per System Engineering.

Judged to be acceptable. See IR 1397616.

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/6/2012 Evaluated by:

James Griffith Date:

10/4/2012 Michael Wodarcyk 10/4/2012 C-565

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 10 Status: [-1 N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATIC, 3/4 - CONTAINMENT 2G DW COOLER UPSTREAM AIR Equipment

Description:

SMPL VLV Photos C-566

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 10 Status: rJ N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATIC, 3/4 - CONTAINMENT 2G DW COOLER UPSTREAM AIR 20120806-QuadCities-2 150 C-567

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 10 Status: EZI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATICI, 3/4 - CONTIAINMEN I 2G UVY L;UULtJ( UVZ) I KtAPA AIK C-568

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 10 Status: F-* N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATIC, 3/4 - CONTAINMENT 2G DW COOLER UPSTREAM AIR C-569

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 10 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATIC, 3/4 - CONTAINMENT 2G DW COOLER UPSTREAM AIR eLaami n 'viit C-570

Quad Cities Generating Station Unit 2 1200108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 8 of 10 Status: Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATIC, 3/4 - CONTAINMENT 2G DW COOLER UPSTREAM AIR C-571

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 9 of 10 Status: F N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATIC, 3/4 - CONTAINMENT 2G DW COOLER UPSTREAM AIR C-572

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 10 of 10 Status: [1 N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

2-8801A-AO Equipment Class:

(7) Fluid-Operated Valves VLV, PNEUMATIC, 3/4 - CONTAINMENT 2G DW COOLER UPSTREAM AIR zui zuo*U*-uaounites-zi t/

C-573

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 3 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

902-3 Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PANEL Project:

Quad Cities 2 SWEL Location (Bldg, Elev, Room/Area):

SB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora-qe

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Yes

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Viewed 6 anchors of 9 total. Remaining anchors could not be viewed due to cabling and limitations on access. Anchors viewed matched documentation, therefore it is reasonable to conclude that the anchors match plant documentation without further verification.

Yes C-574

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 3 Status: LYii N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

902-3 Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

PANEL Interaction Effects

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Sheet metal ceiling inside cabinet and drop-panel ceiling outside cabinet prevent overhead access/visibility.

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Back of control panel was open. No adverse conditions were observed.

Comments SEWS Anchorage Notes:

Panel 902-3 has 9 welded or bolted friction clips (5 on front, 2 in center and 2 on back) attaching base channel to embedded steel.

Seismic Walkdown Team: J. Griffith & M. Wodarcyk - 8/7/2012 No photos permitted per Operations.

C-575

Quad Cities Generating Station Unit 2 12Q0108.40-R-002, Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

902-3 Equipment Class:

(20) Instrumentation and Control Panels and Cabinets EauiDment Descriotion:

PANEL Evaluated by:

James Griffith Date:

10/4/2012

/

  • K

. Michael Wodarcyk 10/4/2012 Photos C-576