ML12361A106

From kanterella
Jump to navigation Jump to search
Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 6 of 10
ML12361A106
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 10/31/2012
From: Delaney M
Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
Shared Package
ML123620010 List:
References
RS-12-169 12Q0108.40-R-001, Rev 3
Download: ML12361A106 (66)


Text

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: Lu]l N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-73A Equipment Class: (18) Instruments on Racks Eauipment DescriDtion:

RACK Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

SB, 609.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-390 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-73A Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Panel welded to massive plate assembly.

Base plate anchored by six -1/2" concrete expansion anchors.Seismic Walkdown Team: D. Carter & J. Griffith -8/20/2012 Evaluated by: iJQ,-. David Carter Date: 10/4/2012 James Griffith 10/4/2012 C-391 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: [II N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-73A Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK Photos 8 C-392 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: [--] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-73A Equipment Class: (18) Instruments on Racks C-393 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: E-Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-73A Equipment Class: (18) Instruments on Racks C-394 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-8 Equipment Class: (18) Instruments on Racks EauiDment

==

Description:==

RACK, AUTO BLOWDOWN Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Minor lack of thread engagement judged to be acceptable.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Minor wall shrinkage cracks judged to be acceptable.

Gap at east end floor anchor judged to be acceptable due to top braces.5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-395 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-8 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK, AUTO BLOWDOWN Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Phone attached to rack. Receiver in cradle. Rack is rigid and vertical seismic acceleration Is minimal, therefore receiver will not jump out of cradle.Phone judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Instrument rack composed of angle iron and anchored by concrete expansion anchors and braced back to a reinforced concrete wall by structural rolled shapes.Seismic Walkdown Team: D. Carter & J. Griffith -8/22/2012 See South CRD Bank area walk-by for further notes.C-396 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: [-j N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-8 Equipment Class: (18) Instruments on Racks Eauioment Descriotion:

RACK. AUTO BLOWDOWN Evaluated by: Zllak David Carter Date: 10/4/2012 James Griffith 10/4/2012 Photos C-397 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status: E1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-8 Equipment Class: (18) Instruments on Racks C-398 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-8 Equipment Class: (18) Instruments on Racks C-399 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2201-8 Equipment Class: (18) Instruments on Racks-o BLOWDOWN o-zz-IL z uaa nliles z ii 8-C-400 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 4 Status: LYii N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-10 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK, U-1 DG RELAY & METERING Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-401 Quad Cities Generating Station Unit 1.12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 4 Status: FYI] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-10 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK, U-1 DG RELAY & METERING 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes.adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Cabinet welded to edge angle. One fillet weld in each of two corners (on outside) of 3" length and 1/8" size on one side of cabinet to edge angles and 1 seam weld which is entirely discounted.

The other corner is anchored by one 1.5"x2" tabs in corner (one side of tab welded to cabinet and the other 3 sides welded to edge angle).Seismic Walkdown Team: D. Carter & J. Griffith -8/21/2012 Evaluated by: David Carter Date: 10/4/2012 0 James Griffith .10/4/2012 C-402 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 4 Status: F-J N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251 -10 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK, U-1 DG RELAY & METERING C-403 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-10 Equipment Class: (18) Instruments on Racks-,..,.,i~,- , n r -. i-4 -DAP,(' I I Irnl(- AV 2.- K, C-404 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: LYII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-113 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK. DG ENGINE CONTROL Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

DG, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Bottom supported by brackets welded to DG skid. Top supported by bolted bracket to water expansion tank.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Not Applicable Mounted to DG skid.5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft tarqets free from impact by nearby equipment or structures?

Yes C-405 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-113 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK, DG ENGINE CONTROL 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

IR 1403068: One panel bolt missing on left side panel, 3 bolts loose on right side. Right side has locations for 16 bolts; 13 bolts acceptable by engineering judgment.

Left side has locations for 11 bolts; 10 bolts acceptable by engineering judgment.Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/21/2012 Evaluated by: ,14- David Carter Date: 10/4/2012 James Griffith 10/4/2012 C-406 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-113 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK, DG ENGINE CONTROL C-407 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-113 Equipment Class: (18) Instruments on Racks C-408 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status: ELI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-113 Equipment Class: (18) Instruments on Racks C-409 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-113 Equipment Class: (18) Instruments on Racks CONI 8-21-C-410 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status: rYl N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-113 Equipment Class: (18) Instruments on Racks RACK, DG ENGINE CONTROL C-411 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: EY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-86 Equipment Class: (18) Instruments on Racks EauiDment

==

Description:==

RACK Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 639.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoracqe

1. Is anchorage configuration verification required (i.e., is the item one of the 50%I of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft tarmcets free from impact by nearby equipment or structures?

Yes C-412 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-86 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Insulated pipe approximately 6 inches above floor touches P5500 legs.Judged to be acceptable.

Comments SEWS Anchorage Notes: Relay box weighing less than 100 lbs. mounted on P5500 (Unistrut) frame anchored by eight -3/4" concrete expansion anchors.Seismic Walkdown Team: D. Carter & J. Griffith -8/20/2012 Evaluated by: Q,&IQQZ- David Carter Date: 10/12/2012 I James Griffith 10/12/2012 C-413 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: r-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-86 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK C-414 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-86 Equipment Class: (18) Instruments on Racks C-415 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-86 Equipment Class: (18) Instruments on Racks 0-C-416 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: [jY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-87 Equipment Class: (18) Instruments on Racks Eauioment DescriOtion:

RACK Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 639.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora.ge

1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracking in floor judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-417 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: EYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-87 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Relay box weighing less than 100 lbs. mounted on P5500 (Unistrut) frame anchored by eight -3/4" concrete expansion anchors.Seismic Walkdown Team: D. Carter & J. Griffith -8/20/2012 Evaluated by: David Carter Date: 10/4/2012 James Griffith 10/4/2012 C-418 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: Fj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-87 Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

RACK Photos v m vm m C-419 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-87 Equipment Class: (18) Instruments on Racks C-420 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 2251-87 Equipment Class: (18) Instruments on Racks C-421 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status: jY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC BATT 1 Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

BATTERY, 250V Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 628.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraqge

1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?SQUG identified one missing anchor Thorough examination of anchor determined that all the anchors are in place.3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes Yes 4. Is theanchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracking judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-422 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC BATT 1 Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

BATTERY, 250V Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes Softeners in place between batteries and between the batteries and racks in place to mitigate impacts.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could adversely affect the safety functions of the equipment?

Yes Comments SEWS Anchorage Notes: Each leg anchored by a single 3/8" Wedge type expansion anchor through a 3x3x1/4" clip angle that is thru-bolted thru the tube leg. On one of the rack, one bolt was missing from the center leg (sixth one from either end) on the furthest back leg (third from front).Seismic Walkdown Team: D. Carter & J. Griffith -8/20/2012 C-423 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: Y- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC BATT 1 Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

BATTERY, 250V Evaluated by: ' -- David Carter Date: 10/4/2012 James Griffith 10/4/2012 Photos C-424 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC BATT 1 Equipment Class: (15) Batteries on Racks C-425 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: E[III N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC BATT 1 Equipment Class: (15) Batteries on Racks Equipment

==

Description:==

BATTERY, C-426 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC BATT 1 Equipment Class: (15) Batteries on Racks 0-" I C-427 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 6 Status: -FLI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC MCC 1 Equipment Class: (1) Motor Control Centers Eauir)ment Descriotion:

MCC Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

TB, 615.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraqe 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes Minor shrinkage cracks in the floor judged to be acceptable.
5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-428 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC MCC 1 Equipment Class: (1) Motor Control Centers Eauipment

==

Description:==

MCC 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

Adjacent masonry wall restrained at top indicating that the wall was designed to resist lateral loads. Therefore it is judged to be seismically adequate.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Welded to embedded angle with 1," long 1/4" thick fillet weld in corner of each unit.Seismic Walkdown Team: D. Carter & J. Griffith -8/20/2012 Evaluated by: Q. David Carter Date: 10/4/2012 James Griffith 10/4/2012 C-429 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 6 Status: LY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Eauioment Descriotion:

25OVDC MCC I (1) Motor Control Centers MCC Photos C-430 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 6 Status: Y-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC MCC 1 Equipment Class: (1) Motor Control Centers C-431 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 6 Status: Y-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 25OVDC MCC 1 (1) Motor Control Centers ts-zu-iz uuaa unies u4o kt)C-432 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 25OVDC MCC 1 Equipment Class: (1) Motor Control Centers EQUI ment Descr tion: MCC-M 2i 8-20-12 Quad Cities 045 (9)8-20-12 Quad Cities 045 (8)C-433 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 5 Status: FYJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC MCC 1A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

MCC Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

RB, 623.00 ft, ALL Manufacturer/Model.

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-434 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 5 Status: Fi-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC MCC 1A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

MCC 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Two doors on the back of the MCC are slightly sprung. They are adequately latched and judged to be acceptable.

Comments Seismic Walkdown Team: D. Carter & J. Griffith -8/22/2012 Evaluated by: Q.dAI,6k David Carter Date: 10/4/2012 James Griffith 10/4/2012 C-435 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 5 Status: F-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC MCC 1A Equipment Class: (1) Motor Control Centers Equipment

==

Description:==

MCC Photos C-436 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 5 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC MCC 1A Equipment Class: (1) Motor Control Centers ment Descinotion:

MCC 8-C-437 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 5 Status: YZ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 250VDC MCC 1A Equipment Class: (1) Motor Control Centers C-438 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-3 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

PANEL Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

SB, 623.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

Viewed 5 of 9 anchors (all in front). Remaining anchors could not be viewed due to cabling and limitation on access. Anchors viewed matched documentation.

Thus it is reasonable to conclude that the anchors match plant documentation without further verification.

C-439 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-3 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauipment

==

Description:==

PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead equipment not visible due to drop ceilings outside of cabinet and sheet metal ceiling inside.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Back of panel was open. No adverse seismic conditions were observed.Comments SEWS Anchorage Notes: Panel 901-3 has 6" of 1/4" fillet welding and 13 plug welds attaching cabinet to base channels and 9 welded or bolted friction clips (5 on front, 2 in center and 2 on back) attaching base channel to embedded steel.Seismic Walkdown Team: D. Carter & J. Griffith -8/20/2012 Per Operations, no photos permitted in control room.C-440 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-3 Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment Descrintion:

PANEL Evaluated by: ,J, Qk David Carter Date: 10/4/2012 A 0 James Griffith 10/4/2012 Photos C-441 ,

Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: EZII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-33 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

PANEL Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

SB, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes Minor shrinkage cracks judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-442 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-33 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

PANEL Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Duct stiffeners modified to provide clearance to cabinet. Top of 901-33 tied to adjacent cabinet (901-47).

Therefore, no seismic interaction concerns.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures have open S-hooks. Excessive swing mitigated by conduit, unistrut, etc. Fixtures not judged to disengage from S-hooks and therefore are acceptable.

S hooks closed during walkdown.

Refer to IR 1402669.9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

All panel doors were opened. No adverse seismic conditions were observed.Comments SEWS Anchorage Notes: 30"Dx72"Wx90"H Panel anchored by 4 -3/4" (flat-flat on bolt head) CEA shells in corners (approximately 4 inches in from corners).Seismic Walkdown Team: D. Carter & J. Griffith -8/20/2012 Evaluated by: P-Ji/ok. David Carter Date: 10/4/2012ý_ 6 P James Griffith 10/4/2012 C-443 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status: LYJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-33 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

PANEL Photos 8-20-12-Quad Cities 121 (1)C-444 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-33 Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-445 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status: LII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-33 Equipment Class: (20) Instrumentation and Control Panels and Cabinets 8-20-12 Quad Cities 121 (3)C-446 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-33 Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-447 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-33 Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-448 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 1 of 7 Status: jjY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-39 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

PANEL Project: Quad Cities 1 SWEL Location (Bldg, Elev, Room/Area):

SB, 595.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3, Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4, Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracking judged to be acceptable.

5, Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-449 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 2 of 7 Status: LIII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-39 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

PANEL 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures have open S-hooks. Excessive swing mitigated by conduit, unistrut, etc. Fixtures not judged to disengage from S-hooks and therefore are acceptable.

Refer to IR 1402669.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

All panel doors were opened. No adverse seismic conditions were observed.Comments SEWS Anchorage Notes: 30"Dx48"Wx90"H Panel anchored by 4 -3/4" (flat-flat on bolt head) CEA in corners.Seismic Walkdown Team: D. Carter & J. Griffith -8/20/2012 Evaluated by: David Carter Date: 10/4/2012 James Griffith 10/4/2012 C-450 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 3 of 7 Status: E-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-39 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

==

Description:==

PANEL Photos C-451 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 4 of 7 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-39 Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-452 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 5 of 7 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-39 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment Descrintion:

PANEL 0-C-453 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 6 of 7 Status: L1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-39 Equipment Class: (20) Instrumentation and Control Panels and Cabinets 8-20-12 Quad Cities 132 (8)0-C-454 Quad Cities Generating Station Unit 1 12Q0108.40-R-001 Rev. 3 Correspondence No.: RS-12-169 Sheet 7 of 7 Status: r-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 901-39 Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-455