Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24071A1237 March 2024Staff’S Assessment of Hazards from a Hypothetical Rupture and Subsequent Release of Natural Gas of the Three Rivers Pipeline Lateral to the Dresden Power Station Units 2 and 3Tornado Missile
Tornado Generated Missile
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits30 June 2022Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air SuitsMururoa
RS-22-082, Defueled Safety Analysis Report Update, Revision 1122 June 2022Defueled Safety Analysis Report Update, Revision 11Safe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Zebra Mussel
Emergency Lighting
Intergranular Stress Corrosion Cracking
Process Control Program
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Backfit
Siren
Overspeed
Water hammer
Control Room Habitability
RS-21-086, Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E23 August 2021Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix EExemption Request
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping4 January 2021Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel PipingNondestructive Examination
ML20300A23517 November 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai Ichi AccidentUnanalyzed Condition
Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Earthquake
Backfit
Seismic Walkdown Report
RS-20-070, Defueled Safety Analysis Report Update, Revision 1022 June 2020Defueled Safety Analysis Report Update, Revision 10Safe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Zebra Mussel
Emergency Lighting
Intergranular Stress Corrosion Cracking
Process Control Program
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Backfit
Siren
Overspeed
Water hammer
Control Room Habitability
RS-19-093, Secondary Containment Drawdown Analysis17 October 2019Secondary Containment Drawdown AnalysisGOTHIC
RS-18-077, Defueled Safety Analysis Report Update, Revision 920 June 2018Defueled Safety Analysis Report Update, Revision 9Safe Shutdown
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Zebra Mussel
Emergency Lighting
Intergranular Stress Corrosion Cracking
Process Control Program
Earthquake
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Backfit
Siren
Overspeed
Water hammer
Control Room Habitability
RS-18-003, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions12 January 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsHigh winds
Ultimate heat sink
Tornado Missile
Hydrostatic
FLEX
Tornado Generated Missile
Design basis earthquake
Severe Accident Management Guideline
Hardened vent
ML15251A38431 August 2015Attachment 9 - NP-3305NP, Revision 1, Mechanical Design Report for Quad Cities and Dresden Atrium 10XN Fuel Assemblies - Licensing Report. (Non-Proprietary)Anticipated operational occurrence
Finite Element Analysis
ML15215A33730 July 2015Holtec International Report No. HI-2146153, Revision 2, Licensing Report for the Criticality Analysis of the Dresden Unit 2 and 3 SEP for Atrium 10XM Fuel DesignFuel cladding
RS-14-310, License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, Criticality30 December 2014License Amendment Request Regarding Spent Fuel Storage Pool Criticality Methodology and Proposed Change to Technical Specification 4.3.1, CriticalityEarthquake
Fuel cladding
Affidavit
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 124 September 2014Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1Through-Wall Leak
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14115A26930 May 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Fukushima Dai-Ichi
Earthquake
Seismic Walkdown Report
RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.19 December 2013Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.Safe Shutdown
Reactor Vessel Water Level
Mission time
Stroke time
Post Accident Monitoring
Feedwater Heater
Scram Discharge Volume
MELLLA
Affidavit
ML13220A23822 November 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation StrategiesSafe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
Hardened vent
GOTHIC
Control Room Habitability
ML13317A82920 November 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Dresden Nuclear Power Station Units 2 and 3, TAC Nos.: MF1046 and MF1047Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Frazil ice
Earthquake
Hardened vent
GOTHIC
Control Room Habitability
ML13126A18628 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 6 of 13Seismic Walkdown Report
ML13126A18828 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 8 of 13Seismic Walkdown Report
ML13126A18728 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 7 of 13Seismic Walkdown Report
ML13126A18528 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 5 of 13Seismic Walkdown Report
ML13126A18428 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 4 of 13Seismic Walkdown Report
ML13126A18328 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 3 of 13Scram Discharge Volume
Seismic Walkdown Report
ML13126A18128 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 2 of 13Scram Discharge Volume
Seismic Walkdown Report
ML13126A18028 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 13 of 13Safe Shutdown
Unanalyzed Condition
Fukushima Dai-Ichi
Scram Discharge Volume
License Renewal
Earthquake
Scaffolding
Power Uprate
Seismic Walkdown Report
ML13126A17928 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 1 of 13Safe Shutdown
Unanalyzed Condition
Ultimate heat sink
Commercial Grade Dedication
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Arc flash
Fukushima Dai-Ichi
Design basis earthquake
Scram Discharge Volume
Frazil ice
Earthquake
Commercial Grade
Scaffolding
Weak link
Power Uprate
Seismic Walkdown Report
ML13126A18928 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 9 of 13Seismic Walkdown Report
ML13126A19028 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 10 of 13Scaffolding
Seismic Walkdown Report
RS-12-167, Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 12 of 1328 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 12 of 13Scaffolding
Seismic Walkdown Report
RS-13-067, Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal 1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 11 of 1328 March 2013Seismic Walkdown Report in Response to 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Updated Transmittal #1 (Annex a) for Dresden, Unit 3, Report No. RS-13-06, Part 11 of 13Scaffolding
Seismic Walkdown Report
ML12306A3931 November 2012Request for a Written Response to NRC Observations and Concerns Regarding Dresden Station Response Plan for External Flooding EventsFukushima Dai-Ichi
RS-09-165, Request for Approval of Updated Pipe Flaw Evaluation Report7 December 2009Request for Approval of Updated Pipe Flaw Evaluation ReportOperating Basis Earthquake
Intergranular Stress Corrosion Cracking
ML0908404305 March 2009Medical Services (MS-1) Drill ReportSiren
Potassium iodide
ML0821900137 August 2008Monthly Operating Reports Second Quarter 2008Reserve Station Service Transformer
Feedwater Heater
Power change
Downpower
Power Uprate
Overspeed trip
Overspeed
RS-07-097, Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit10 July 2007Request for Technical Specifications Change for Minimum Critical Power Ratio Safety LimitShutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Fuel cladding
Affidavit
ML0715705105 April 2007CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-3, Rev 004, Diesel Generator 2/3 Loading Under Design Bases Accident Condition.Safe Shutdown
Stroke time
Emergency Lighting
Fuel cladding
ML0715705015 April 2007CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-1, Rev 003 Diesel Generator 3 Loading Under Design Bases Accident ConditionSafe Shutdown
Stroke time
Emergency Lighting
Fuel cladding
ML0715705054 April 2007CC-AA-309-1001, Rev 1, Attachment 1, Design Analysis Major Revision Cover Sheet, 989-46-19-2, Rev 003, Calculation for Diesel Generator 2 Loading Under Design Bases Accident ConditionSafe Shutdown
Stroke time
Emergency Lighting
Fuel cladding
ML0634601317 December 2006Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS BarrierDeep Dose Equivalent
Fuel cladding
ML06213003231 May 2006GE-NE-0000-0053-8435-R1-NP, Rev 1, Dresden 2 & 3 and Quad Cities 1 & 2, Safety Valve Setpoint Tolerance Relaxation, May 2006Safe Shutdown
Stroke time
High Energy Line Break
Feedwater Heater
Feedwater Controller Failure
Power change
Power Uprate
Manual Operator Action
Loss of condenser vacuum
ML06062036826 January 2006Attachment 3 (Technical Specifications) and 4 (Affidavit and Non-Proprietary Version of Attachment 2 to Exelon Letter Dated January 26, 2006)Anticipated operational occurrence
Safe Shutdown Earthquake
MELLLA
Coast down
Power Uprate
Affidavit
Water rod
ML1024201467 December 2005Groundwater Tritium Investigation Report, Dresden Generating Station, Project Number EXENW-18513-400
RS-05-064, Commitments and Plans Related to Extended Power Uprate Operation13 May 2005Commitments and Plans Related to Extended Power Uprate OperationTemporary Modification
Finite Element Analysis
MELLLA
Power change
Power Uprate
ML0514400845 May 2005Enclosure 1, Attachment 2, 26A6266AB, Revision 4, Steam Dryer, GE Nuclear Energy, Design Specification Data Sheet, Dated May 5, 2005Control of Heavy Loads
Flow Induced Vibration
ML05136010030 April 2005Enclosure 2, Attachment 2, Replacement Steam Dryer Reactor Vessel Bracket Stress Report for Quad Cities 1, 2, and Dresden 2,3, GE-NE-0000-0034-4803-02, Non-Proprietary, Dated April 2005Safe Shutdown Earthquake
Operating Basis Earthquake
Flow Induced Vibration
Power Uprate
ML05133005325 April 2005Enclosure 3, Dresden Strain Gage Uncertainty Evaluation, SIA File No.: EXLN-17Q-301, Revision 0, Dated April 25,2005
ML05144008124 April 2005Enclosure 1, Attachment 1, 26A6266, Rev 3, Steam Dryer, GE Nuclear Energy, Design Specification, April 24, 2005Safe Shutdown Earthquake
Operating Basis Earthquake
Stress corrosion cracking
Flow Induced Vibration
Power Uprate
RS-05-042, Additional Information Related to Analysis and Design of New Quad Cities Steam Dryers, and Responses to Requests for Additional Information Related to EPU Operation at Dresden and Quad Cities Nuclear Power Stations6 April 2005Additional Information Related to Analysis and Design of New Quad Cities Steam Dryers, and Responses to Requests for Additional Information Related to EPU Operation at Dresden and Quad Cities Nuclear Power Stations