Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating28 September 2023Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - OperatingSafe Shutdown
Ultimate heat sink
Tornado Missile
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Earthquake
Offsite Circuit
NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.125 May 2023License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12Safe Shutdown
Surveillance Frequency Control Program
NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage5 May 2023License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) LeakageAnticipated operational occurrence
Nonconservative Technical Specifications
NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements16 December 2022License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance RequirementsSafe Shutdown
Time of Discovery
Stroke time
Surveillance Frequency Control Program
Offsite Circuit
NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements4 August 2022Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
High Radiation Area
Stroke time
Water Inventory Control
Operating Basis Earthquake
Squib
Qualified Offsite Circuit
Surveillance Frequency Control Program
Excess Flow Check Valve
Control of Heavy Loads
Power Operated Valves
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Scaffolding
NRC-21-0001, License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes31 March 2021License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial ChangesTime of Discovery
Shutdown Margin
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Water Inventory Control
Post Accident Monitoring
Missed surveillance
Surveillance Frequency Control Program
Scram Discharge Volume
Recently irradiated fuel
Offsite Circuit
NRC-20-0038, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules28 October 2020Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application RulesTime of Discovery
Missed surveillance
ML20282A23013 October 2020Correction to Amendment No. 216 - Revision to Technical Specifications in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03Reactor Vessel Water Level
NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program5 June 2020Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control ProgramSurveillance Frequency Control Program
NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle8 November 2019DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel CycleSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Anticipated operational occurrence
Water Inventory Control
Post Accident Monitoring
Squib
Surveillance Frequency Control Program
Scram Discharge Volume
Maintenance Rule Program
Fuel cladding
Offsite Circuit
NRC-19-0028, License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-035 September 2019License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03
ML17305A03816 October 2017Enclosures 1-6: 10CFR50.59 Evaluation Summary Report, Commitment Management Report, Revisions to Technical Requirements Manual and Technical Specifications BasesSafe Shutdown
Unanalyzed Condition
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Temporary Modification
Incorporated by reference
Test box
Surveillance Frequency Control Program
Fuel cladding
Biofouling
GOTHIC
NRC-17-0063, License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities.9 October 2017License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities.Water Inventory Control
Hydrostatic
Incorporated by reference
NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro25 July 2016License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement ProcesHigh Radiation Area
Stroke time
Squib
Missed surveillance
Surveillance Frequency Control Program
NRC-15-0091, License Amendment Request to Revise Technical Specification Section 3.5.1, ECCS - Operating.24 September 2015License Amendment Request to Revise Technical Specification Section 3.5.1, ECCS - Operating.Surveillance Frequency Control Program
NRC-15-0090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process24 September 2015License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement ProcessReactor Vessel Water Level
Stroke time
Surveillance Frequency Control Program
NRC-14-0055, License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan21 October 2014License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan
NRC-14-0010, License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries23 April 2014License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current BatteriesAnticipated operational occurrence
Battery sizing
Fuel cladding
NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate7 February 2013License Amendment Request for Measurement Uncertainty Recapture (Mur) Power UprateSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Scram Discharge Volume
Flow Induced Vibration
NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases5 November 2012Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications BasesSafe Shutdown
Grab sample
Stroke time
Anticipated operational occurrence
Temporary Modification
Incorporated by reference
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Unidentified leakage
NRC-11-0049, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration.20 December 2011License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration.Reactor Vessel Water Level
Squib
NRC-11-0013, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.8 April 2011License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.Grab sample
Pressure Boundary Leakage
NRC-10-0047, Proposed Emergency License Amendment for a Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B14 May 2010Proposed Emergency License Amendment for a Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition BSafe Shutdown
Probabilistic Risk Assessment
Temporary Modification
Large early release frequency
ML07355060018 December 2007Tech Spec Pages for Amendment 177 Technical Specification (TS) Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to TS 3.7.4Recently irradiated fuel
NRC-07-0047, Transmittal of Revised Technical Specifications (TS) Pages for Use with the Application to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems in TS 3.7.411 September 2007Transmittal of Revised Technical Specifications (TS) Pages for Use with the Application to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems in TS 3.7.4Recently irradiated fuel
NRC-07-0036, Proposed License Amendment to Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirement12 July 2007Proposed License Amendment to Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance RequirementPost Accident Monitoring
NRC-07-0030, Application for Technical Specification Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to Technical Specification 3.7.4 Using the Consolidated Line Item Improvement Process12 June 2007Application for Technical Specification Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to Technical Specification 3.7.4 Using the Consolidated Line Item Improvement ProcessIncorporated by reference
Recently irradiated fuel
NRC-06-0063, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process27 November 2006Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement ProcessIncorporated by reference
NRC-06-0010, Emergency License Amendment Request for One-Time Extension of Allowed Outage Time for the Plant Emergency Diesel Generator 125 February 2006Emergency License Amendment Request for One-Time Extension of Allowed Outage Time for the Plant Emergency Diesel Generator 12Safe Shutdown
Probabilistic Risk Assessment
Large early release frequency
ML05299001825 October 2005Technical Specification Page Control Rod Scram Time Testing Frequency
ML0433800097 December 2004Correction to Amendment No. 163 Technical Specification Change Regarding Increased Flexibility in Mode Changes
ML04335024829 November 2004Technical Specifications, Technical Specification Change Regarding Increased Flexibility in Mode ChangesTime of Discovery
Grab sample
Post Accident Monitoring
NRC-04-0074, Proposed License Amendment Request to Revise Technical Specification 2.1, Safety Limit Minimum Critical Power Ratio7 October 2004Proposed License Amendment Request to Revise Technical Specification 2.1, Safety Limit Minimum Critical Power RatioReactor Vessel Water Level
Minimum Critical Power Ratio
Fuel cladding
ML04125036423 April 2004Licensing Document Transmittal Firm 2 Technical Requirements Manual - Vol I, Revision 67, 04/23/2004.Ultimate heat sink
Post Accident Monitoring
NRC-04-0006, Proposed License Amendment to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation.19 March 2004Proposed License Amendment to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation.
ML04078082615 March 2004Technical Specification Pages for Amendment 159Reactor Vessel Water Level
Ultimate heat sink
Post Accident Monitoring
NRC-04-0004, Proposed Amendment to Revise Technical Specification 3.3.6.2, Secondary Containment Isolation Instrumentation.30 January 2004Proposed Amendment to Revise Technical Specification 3.3.6.2, Secondary Containment Isolation Instrumentation.
ML04022078616 January 2004Technical Specification Pages for Fermi 2, Amendment No. 158
ML03309035730 October 2003Tech Spec Pages for License Amendment 157, Revised Action for SCRAM Discharge Volume Vent and Drain ValvesScram Discharge Volume
NRC-03-0009, Proposed License Amendment for Revision of TS Section 5.5.10, TS Bases Control Program to Be Consistent with Revised 10 CFR 50.5913 February 2003Proposed License Amendment for Revision of TS Section 5.5.10, TS Bases Control Program to Be Consistent with Revised 10 CFR 50.59