NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | 28 September 2023 | Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | Safe Shutdown Ultimate heat sink Tornado Missile Enforcement Discretion Probabilistic Risk Assessment FLEX Earthquake Offsite Circuit |
NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | 5 May 2023 | License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | Safe Shutdown Surveillance Frequency Control Program |
NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage | 5 May 2023 | License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage | Anticipated operational occurrence Nonconservative Technical Specifications |
NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | 16 December 2022 | License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | Safe Shutdown Time of Discovery Stroke time Surveillance Frequency Control Program Offsite Circuit |
NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 4 August 2022 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level High Radiation Area Stroke time Water Inventory Control Operating Basis Earthquake Squib Qualified Offsite Circuit Surveillance Frequency Control Program Excess Flow Check Valve Control of Heavy Loads Power Operated Valves Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
NRC-21-0001, License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes | 31 March 2021 | License Amendment Request to Revise Technical Specifications to Remove Obsolete Information, Make Minor Corrections, and Make Miscellaneous Editorial Changes | Time of Discovery Shutdown Margin High Radiation Area Grab sample Offsite Dose Calculation Manual Water Inventory Control Post Accident Monitoring Missed surveillance Surveillance Frequency Control Program Scram Discharge Volume Recently irradiated fuel Offsite Circuit |
NRC-20-0038, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules | 28 October 2020 | Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules | Time of Discovery Missed surveillance |
ML20282A230 | 13 October 2020 | Correction to Amendment No. 216 - Revision to Technical Specifications in Response to GE Energy-Nuclear's 10 CFR Part 21 Safety Communication SC05-03 | Reactor Vessel Water Level |
NRC-20-0032, Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | 5 June 2020 | Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program | Surveillance Frequency Control Program |
NRC-19-0054, DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | 8 November 2019 | DTE Energy Company - License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Squib Surveillance Frequency Control Program Scram Discharge Volume Maintenance Rule Program Fuel cladding Offsite Circuit |
NRC-19-0028, License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 | 5 September 2019 | License Amendment Request - Proposed Revision to Technical Specifications in Response to GE Energy - Nuclear 10 CFR Part 21 Safety Communication SC05-03 | |
ML17305A038 | 16 October 2017 | Enclosures 1-6: 10CFR50.59 Evaluation Summary Report, Commitment Management Report, Revisions to Technical Requirements Manual and Technical Specifications Bases | Safe Shutdown Unanalyzed Condition Reactor Vessel Water Level Ultimate heat sink Stroke time Temporary Modification Incorporated by reference Test box Surveillance Frequency Control Program Fuel cladding Biofouling GOTHIC |
NRC-17-0063, License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities. | 9 October 2017 | License Amendment Request for Adoption of TSTF-484, Rev. 0, Use of TS 3.10.1 for Scram Time Testing Activities. | Water Inventory Control Hydrostatic Incorporated by reference |
NRC-16-0036, License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Pro | 25 July 2016 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, Using the Consolidated Line Item Improvement Proces | High Radiation Area Stroke time Squib Missed surveillance Surveillance Frequency Control Program |
NRC-15-0091, License Amendment Request to Revise Technical Specification Section 3.5.1, ECCS - Operating. | 24 September 2015 | License Amendment Request to Revise Technical Specification Section 3.5.1, ECCS - Operating. | Surveillance Frequency Control Program |
NRC-15-0090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | 24 September 2015 | License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process | Reactor Vessel Water Level Stroke time Surveillance Frequency Control Program |
NRC-14-0055, License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan | 21 October 2014 | License Amendment Request to Revise the Emergency Action Level Scheme for the Emergency Plan | |
NRC-14-0010, License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries | 23 April 2014 | License Amendment Request to Revise Technical Specification Surveillance Requirements for Direct Current Batteries | Anticipated operational occurrence Battery sizing Fuel cladding |
NRC-13-0004, License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate | 7 February 2013 | License Amendment Request for Measurement Uncertainty Recapture (Mur) Power Uprate | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Scram Discharge Volume Flow Induced Vibration |
NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases | 5 November 2012 | Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases | Safe Shutdown Grab sample Stroke time Anticipated operational occurrence Temporary Modification Incorporated by reference Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Unidentified leakage |
NRC-11-0049, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration. | 20 December 2011 | License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration. | Reactor Vessel Water Level Squib |
NRC-11-0013, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | 8 April 2011 | License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. | Grab sample Pressure Boundary Leakage |
NRC-10-0047, Proposed Emergency License Amendment for a Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B | 14 May 2010 | Proposed Emergency License Amendment for a Onetime Extension of the Completion Time in Technical Specification 3.7.3, Control Room Emergency Filtration (CREF) System, Condition B | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Large early release frequency |
ML073550600 | 18 December 2007 | Tech Spec Pages for Amendment 177 Technical Specification (TS) Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to TS 3.7.4 | Recently irradiated fuel |
NRC-07-0047, Transmittal of Revised Technical Specifications (TS) Pages for Use with the Application to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems in TS 3.7.4 | 11 September 2007 | Transmittal of Revised Technical Specifications (TS) Pages for Use with the Application to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems in TS 3.7.4 | Recently irradiated fuel |
NRC-07-0036, Proposed License Amendment to Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirement | 12 July 2007 | Proposed License Amendment to Delete the Note Associated with the Performance of Channel Calibration for Primary Containment High Range Radiation Monitor in Technical Specification 3.3.3.1 Surveillance Requirement | Post Accident Monitoring |
NRC-07-0030, Application for Technical Specification Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to Technical Specification 3.7.4 Using the Consolidated Line Item Improvement Process | 12 June 2007 | Application for Technical Specification Change (TSTF-477) to Add an Action Statement for Two Inoperable Control Center Air Conditioning Subsystems to Technical Specification 3.7.4 Using the Consolidated Line Item Improvement Process | Incorporated by reference Recently irradiated fuel |
NRC-06-0063, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process | 27 November 2006 | Application for Technical Specification Change TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for the Diesel Fuel Oil Testing Programs Using the Consolidated Line Item Improvement Process | Incorporated by reference |
NRC-06-0010, Emergency License Amendment Request for One-Time Extension of Allowed Outage Time for the Plant Emergency Diesel Generator 12 | 5 February 2006 | Emergency License Amendment Request for One-Time Extension of Allowed Outage Time for the Plant Emergency Diesel Generator 12 | Safe Shutdown Probabilistic Risk Assessment Large early release frequency |
ML052990018 | 25 October 2005 | Technical Specification Page Control Rod Scram Time Testing Frequency | |
ML043380009 | 7 December 2004 | Correction to Amendment No. 163 Technical Specification Change Regarding Increased Flexibility in Mode Changes | |
ML043350248 | 29 November 2004 | Technical Specifications, Technical Specification Change Regarding Increased Flexibility in Mode Changes | Time of Discovery Grab sample Post Accident Monitoring |
NRC-04-0074, Proposed License Amendment Request to Revise Technical Specification 2.1, Safety Limit Minimum Critical Power Ratio | 7 October 2004 | Proposed License Amendment Request to Revise Technical Specification 2.1, Safety Limit Minimum Critical Power Ratio | Reactor Vessel Water Level Minimum Critical Power Ratio Fuel cladding |
ML041250364 | 23 April 2004 | Licensing Document Transmittal Firm 2 Technical Requirements Manual - Vol I, Revision 67, 04/23/2004. | Ultimate heat sink Post Accident Monitoring |
NRC-04-0006, Proposed License Amendment to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation. | 19 March 2004 | Proposed License Amendment to Revise Technical Specification 3.3.6.1, Primary Containment Isolation Instrumentation. | |
ML040780826 | 15 March 2004 | Technical Specification Pages for Amendment 159 | Reactor Vessel Water Level Ultimate heat sink Post Accident Monitoring |
NRC-04-0004, Proposed Amendment to Revise Technical Specification 3.3.6.2, Secondary Containment Isolation Instrumentation. | 30 January 2004 | Proposed Amendment to Revise Technical Specification 3.3.6.2, Secondary Containment Isolation Instrumentation. | |
ML040220786 | 16 January 2004 | Technical Specification Pages for Fermi 2, Amendment No. 158 | |
ML033090357 | 30 October 2003 | Tech Spec Pages for License Amendment 157, Revised Action for SCRAM Discharge Volume Vent and Drain Valves | Scram Discharge Volume |
NRC-03-0009, Proposed License Amendment for Revision of TS Section 5.5.10, TS Bases Control Program to Be Consistent with Revised 10 CFR 50.59 | 13 February 2003 | Proposed License Amendment for Revision of TS Section 5.5.10, TS Bases Control Program to Be Consistent with Revised 10 CFR 50.59 | |