Technical Specification Pages for Amendment 159
ML040780826
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/15/2004
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML040780826 (9)


Text

TABLE OF CONTENTS 3.6 CONTAINMENT SYSTEMS (continued) 3.6.3.1 Primary Containment Oxygen Concentration . .3.6-39 I 3.6.4.1 Secondary Containment 3.6-40 3.6.4.2 Secondary Containment Isolation Valves (SCIVsj 3.6-43 3.6.4.3 Standby Gas Treatment (SGT) System . .............3.6-47 3.7 PLANT SYSTEMS 3.7-1 3.7.1 Residual Heat Removal1 W stem . 3.7-1 3.7.2 Emergency Equipment Cooling Water (EECW)/

Emergency Equipment Service Water (EESW) System and Ultimate Heat Sink (UHS) .. 37-'3 3.7.3 Control Room Emergency Filtration (CRt) ....... 3.7-6 3.7.4 Control Center Air Conditioning (AC) System ........... 3.7-11 3.7.5 Main Condenser Offgas 3.7-14 3.7.6 The Main Turbine BypassSystem a.d.

Moisture Separator Reheater 3.7-16 3.7.7 Spent Fuel Storage Pool Water Level- -- 3.7-18 3.7.8 Emergency Diesel Generator Service Wtrt§J)

System 3.7-19 3.8 ELECTRICAL POWERtS pSTEi . 3.8-1 3.8.1 AC Sources- Operati.g. . .................... 3.8-1 3.8.2 AC Sources- Shutdown...;.;................... 3.8-10 3.8.3 Diesel Fuel Oil, and Starting Alr ..................... 3.8-13 3.8.4 DC Sources- Operating . 3.8-16 3.8.5 DC Sources- Shutdown. 3.8-19 3.8.6 Battery Cell Parameters .................. 3.8-22 3.8.7 Distribution Systems- 6O in ........................3.8-26 3.8.8 Distribution Systems- Shutdown. .-................... 3.8-28 3.9 REFUELING OPERATIONS 3.9-1 3.9.1 Refueling Equipment inte6 ki.s. 3.9-1 3.9.2 Refuel Position One-Rod-Out Interlok .3.9-3 3.9.3 Control Rod Position . 3.9-5 3.9.4 Control Rod Position Iniak~tion 3.9-6 3:9.5 Control Rod OPERABILITY- Refueling.3.98 3.9.6 Reactor Pressure Vessel (RPV) Water Level .3.9-9 3.9.7 Residual Heat Removal (RHR)- High Water L6e61` ........ 3.9-10 3.9.8 Residual Heat Removal CRHR)- Low Water Level . 3.9-12 (continued)

FERMI - UNIT 2 iii Amendment No. 134, 159

PAM Instrumentation 3.3.3.1 3.3 INSTRUMENTATION 3.3.3.1 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3.1 The PAM instrumentation for each Function in Table 3.3.3.1-1 shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS

. . . . . . .NOTES . . . . . . . . . . . . . . . . . .

1. LCO 3.0.4 is not applicable.
2. Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Restore required 30 days with one required channel to OPERABLE channel inoperable, status.

B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.7.

not met.

C. One or more Functions C.1 Restore one required 7 days .1 with two required channel to OPERABLE channels inoperable. status.

(continued)

FERMI - UNIT 2 3.3-24 Amendment No. 134, 159

PAM Instrumentation 3.3.3.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. Required Action and D.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C Table 3.3.3.1-1 for not met. the channel. I E. As required by E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Required Action D.1 and referenced in Table 3.3.3.1-1.

F. As required by F.1 Initiate action in Immediately Required Action D.1 accordance with and referenced in Specification 5.6.7.

Table 3.3.3.1-1.

FERMI - UNIT 2 3.3-25 Amendment No. tN4, 159

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS

---.--------------- .........-NOTE- .................................

These SRs apply to each Function in Table 3.3.3.1-1.

SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK. 31 days SR 3.3.3.1.2 ------------.-- -NOTE -----------------.

Radiation detectors are excluded.

Perform CHANNEL CALIBRATION. 18 months FERMI - UNIT 2 3.3-26 Amendment No. %4, 159

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)

Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REQUIRED FROM REQUIRED FUNCTION CHANNELS ACTION D.1

1. Reactor Vessel Pressure 2 E
2. Reactor Vessel Water Level Fuel Zone 2 E
3. Reactor Vessel Water Level - Wide Range 2 E
4. Suppression Pool Water Level 2 E S. Suppression Pool Water Temperature 2 E
6. Drywell Pressure Wide Range 2 E
7. Primary Containment High Range Radiation Monitor 2 F
8. PCIV Position 2 per penetration E flow path(a)(b)

(a) Not required for isolation valves whose associated penetration flow path is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.

FERMI - UNIT 2 3.3-27 Amendment No. 134,159

THIS PAGE INTENTIONALLY LEFT BLANK FERMI - UNIT 2 3.6-37 Amendment No. 14, 159

THIS PAGE INTENTIONALLY LEFT BLANK FERMI - UNIT 2 3.6-38 Amendment No. 1S4. 159

Primary Containment Oxygen Concentration 3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Primary Containment Oxygen Concentration I LCO 3.6.3.1 The primary containment oxygen concentration shall be I

< 4.0 volume percent.

APPLICABILITY: MODE 1 during the time period:

a. From 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after THERMAL POWER is > 15% RTP following startup, to
b. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to reducing THERMAL POWER to < 15% RTP prior to the next reactor shutdown.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.1 Restore oxygen 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> oxygen concentration concentration to not within limit. within limit. .

B. Required Action and B.1 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> associated Completion to

Time not met.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.3.1.1 Verify primary containment oxygen 7 days I concentration is within limits.

FERMI - UNIT 2 3.6-39 Amendment No. 134, 159

Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.6 Safety Relief Valve Challenge Report The main steam line Safety Relief Valve (SRV) Report documenting all challenges to SRVs during the previous calendar year shall be submitted by April 30 of each year.

5.6.7 PAM Report When a report is required by Condition B or F of LCO 3.3.3.1. I

'Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the action taken, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.

FERMI - UNIT 2 5.0-22 Amendment No. XX, 159