Technical Specification Page Control Rod Scram Time Testing Frequency
ML052990018
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/25/2005
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML052990018 (1)


Text

Control Rod Scram Times 3.1.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE j FREQUENCY SR 3.1.4.2 Verify, for a representative sample, each 200 days I tested control rod scram time is within the cumulative limits of Table 3.1.4-1 with reactor steam operation in dome pressure 2 800 psig. MODE 1 SR 3.1.4.3 Verify each affected control rod scram time Prior to is Within the limits of Table 3.1.4-1 with declaring any reactor steam dome pressure. control rod OPERABLE after work on control rod or CRD System that could affect scram time SR 3.1.4.4 Verify each affected control rod scram time Prior to is within the limits of Table 3.1.4-1 with exceeding reactor steam dome pressure > 800 psig. 40% RTP after fuel movement within the associated core cell AND Prior to exceeding 40X RTP after work on control rod or CRD System that could affect scram time FERMI - UNIT 2 3.1-13 Amendment No. X34, 167