ML040220786

From kanterella
Jump to navigation Jump to search

Technical Specification Pages for Fermi 2, Amendment No. 158
ML040220786
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/16/2004
From: Chernoff H
NRC/NRR/DLPM/LPD3
To:
References
TAC MC1139
Download: ML040220786 (1)


Text

CREF System 3.7.3 SURVEILLANCEREQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.7.3.5 Verify each CREF subsystem can maintain a 18 months positive pressure of 2 0.125 inches water on a gauge relative to the outside atmosphere STAGGERED during the recirculation mode of operation TEST BASIS at a makeup flow rate of

  • 1800 cfm.

SR 3.7.3.6 Verify that unfiltered inleakage from CREF 36 months#

system duct work outside the Control Room envelope that is at negative pressure during accident conditions is within limits.

I This surveillance requirement may be extended on a one-time basis to prior to startup from RF-10.

I FERMI UNIT 2 3.7-10 Amendment No. z&4',

158