ML20282A230
| ML20282A230 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/13/2020 |
| From: | Shilpa Arora Plant Licensing Branch III |
| To: | Peter Dietrich DTE Electric Company |
| Arora S | |
| References | |
| EPID L-2019-LLA-0200 | |
| Download: ML20282A230 (5) | |
Text
October 13, 2020 Mr. Peter Dietrich Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, MI 48166
SUBJECT:
FERMI 2 - CORRECTION TO AMENDMENT NO. 216 RE: REVISION TO TECHNICAL SPECIFICATIONS IN RESPONSE TO GE ENERGY-NUCLEARS 10 CFR PART 21 SAFETY COMMUNICATION SC05-03 (EPID L-2019-LLA-0200)
Dear Mr. Dietrich:
On October 5, 2020, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 216 to Renewed Facility Operating License No. NPF-43 for Fermi 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20233A838). The amendment revised technical specification (TS) requirements in response to your application dated September 5, 2019 (ADAMS Accession No. ML19248C571).
Subsequent to issuance of the amendment, it was noticed that TS page 2.0-1 inserted in the October 5, 2020, amendment was not correct as it was not based on the previous latest update of the TS. Enclosed with this letter is the corrected TS page 2.0-1 with which we ask you to replace the previously issued TS page 2.0-1 for Amendment No. 216. We regret any inconvenience caused by this correction.
The NRC concludes that this correction is entirely editorial in nature and does not change the staffs conclusion in the safety evaluation for Amendment No. 216, nor does it affect the no significant hazard consideration, as published in the Federal Register on December 3, 2019 (84 FR 66227).
P. Dietrich If you have any questions regarding this matter, please contact me at (301) 415-1421 or by e-mail at Surinder.Arora@nrc.gov.
Sincerely,
/RA/
Surinder Arora, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-341
Enclosure:
Corrected TS Page 2.0-1 for Amendment No. 216 cc: Listserv
ENCLOSURE CORRECTED TS PAGE 2.0-1 FOR AMENDMENT NO. 216 DTE ELECTRIC COMPANY FERMI 2 DOCKET NO. 50-341
FERMI - UNIT 2 2.0-1 Amendment No. 134, 138, 164, 214, 216 SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs 2.1.1.1 With the reactor steam dome pressure < 686 psig or core flow < 10% rated core flow:
THERMAL POWER shall be 25% RTP.
2.1.1.2 With the reactor steam dome pressure 686 psig and core flow 10% rated core flow:
MCPR shall be 1.07.
2.1.1.3 Reactor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 Reactor Coolant System Pressure SL Reactor steam dome pressure shall be 1325 psig.
2.2 SL Violations With any SL violation, the following actions shall be completed within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.1 Restore compliance with all SLs; and 2.2.2 Insert all insertable control rods.
- via e-mail OFFICE NRR/DORL/LPL3/PM* NRR/DORL/LPL3/LA*
NRR/DORL/LPL3/BC* NRR/DORL/LPL3/PM*
NAME SArora SRohrer (JBurkhardt for)
NSalgado SArora DATE 10/07/2020 10/08/2020 10/13/2020 10/13/2020