DETROIT EDISON -
FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 04/23/04 To: 00935 US NRC DOCUMENT CNTRL DESK PAGE 2
WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lv1 Date Sec Status TMTRM TRM VOL I 67 11 IR 04/23/04 AFC Please destroy or mark all revised, superseded, or cancelled documents as such.
CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: e55202 AXDt
LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL - VOL I Revision 67 dated 4/23/04 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 66 has been inserted prior to inserting these pages.
Location In Front of TRM Manual Immediately following Title Page Table of Contents 3.3 Instrumentation 3.6 Containment Systems K> B3.3 Instrumentation B3.6 Containment Systems Remove Title Page Rev 66 9/22/03 List of Effective Pages LEP-1 through LEP-4 Rev 66 9/22/03 Page ii Rev 31 10/99 Page v Rev 31 10/99 Page 3.3-12 Rev 31 10/99 Page3.3-13 Rev31 10/99 Page 3.3-14 Rev 31 10/99 Page 3.6-2, Rev 60 01/03 Page B3.3.3-1 Rev 31 10/99 Page B3.6.2-1 Rev 31 10/99 Insert Title Page Rev 67 4/23/04 List of Effective Pages' LEP-1 through LEP-4 Rev 6 Page ii Rev 67 04/04 Page v Rev 67 04/04 Page 3.3-12 Rev 67 04/04 Page 3.3-13 Rev 67 04/04 Page 3.3-13a Rev 67 04/04 Page 3.3-14 Rev 67 04/04 Page 3.6-2, Rev 67 04/04 Page B3.3.3-1 Rev 67 04/04 Page B3.6.2-1 Rev 67 04/04 7 4/23/04 END
Fermi 2 Technical Requirements Manual Volume I Detroit Edison ARMS - INFORMATION DTC: TMTRM l File: 1754 l DSN TRM VOL I I Rev: 67 Date: 04/23/04 Recipient Li Z
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Page Revision Revision TRM i TRM ii TRM iii TRM iv TRM v TRM vi TRM 1.0-a TRM 1.0-1 TRM 2.0-1 TRM 3.0-a TRM 3.0-1 TRM 3.0-2 TRM 3.0-3 TRM 3.0-4 TRM 3.1-a TRM 3.1-1 TRM 3.2-1 TRM 3.3-a TRM 3.3-b TRM 3.3-c TRM 3.3-d TRM 3.3-1 TRM 3.3-2 TRM 3.3-3 TRM 3.3-4 TRM 3.3-5 TRM 3.3-6 TRM 3.3-7 TRM 3.3-8 TRM 3.3-9 TRM 3.3-10 TRM 3.3-11 TRM 3.3-12 TRM 3.3-13 TRM 3.3-13a TRM 3.3-14 TRM 3.3-15 TRM 3.3-16 TRM 3.3-17 TRM 3.3-18 TRM 3.3-19 TRM 3.3-20 TRM 3.3-21 TRM 3.3-22 TRM 3.3-23 TRM 3.3-24 TRM 3.3-25 TRM 3.3-26 TRM 3.3-27 TRM 3.3-28 TRM 3.3-29 TRM 3.3-30 Revision 31 Revision 67 Revision 31 Revision 34 Revision 67 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 63 Revision 63 Revision 54 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 34 Revision 59 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 67 Revision 67 Revision 67 Revision 67 Revision 31 Revision 31 Revision 31 Revision 52 Revision 31 Revision 31 Revision 59 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM 3.3-31 TRM 3.3-32 TRM 3.3-33 TRM 3.3-34 TRM 3.3-35 TRM 3.3-36 TRM 3.3-37 TRM 3.3-38 TRM 3.3-39 TRM 3.3-40 TRM 3.3-41 TRM 3.3-42 TRM 3.3-43 TRM 3.3-44 TRM 3.3-45 TRM 3.3-46 TRM 3.3-47 TRM 3.3-48 TRM 3.3-49 TRM 3.4-a TRM 3.4-1 TRM 3.4-la TRM 3.4-lb TRM 3.4-2 TRM 3.4-3 TRM 3.4-4 TRM 3.4-5 TRM 3.4-6 TRM 3.4-7 TRM 3.4-8 TRM 3.4-9 TRM 3.4-10 TRM 3.5-1 TRM 3.6-a TRM 3.6-1 TRM 3.6-2 TRM 3.6-3 TRM 3.6-4 TRM 3.6-5 TRM 3.6-6 TRM 3.6-7 TRM 3.6-8 TRM 3.6-9 TRM 3.6-10 TRM 3.6-11 TRM 3.6-12 TRM 3.6-13 TRM 3.6-14 TRM 3.6-15 TRM 3.6-16 TRM 3.6-17 TRM 3.6-18 Revision 31 Revision 31 Revision 31 Revision 31 Revision 60 Revision 41 Revision 31 Revision 31 Revision 31 Revision 56 Revision 56 Revision 45 Revision 62 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 36 Revision 34 Revision 34 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 60 Revision 67 Revision 31 Revision 55 Revision 31 Revision 33 Revision 31 Revision 31 Revision 66 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM Vol. I LEP-1 REV 67 4/23/04
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 TRM 3.6-20 TRM 3.6-21 TRM 3.6-22 TRM 3.6-23 TRM 3.6-24 TRM 3.6-25 TRM 3.6-26 TRM 3.6-27 TRM 3.6-28 TRM 3.6-29 TRM 3.6-30 TRM 3.6-31 TRM 3.6-32 TRM 3.6-33 TRM 3.6-34 TRM 3.6-35 TRM 3.7-a TRM 3.7-b TRM 3.7-1 TRM 3.7-2 TRM 3.7-3 TRM 3.7-4 TRM 3.7-5 TRM 3.7-6 TRM 3.7-7 TRM 3.7-8 TRM 3.7-9 TRM 3.7-10 TRM 3.7-11 TRM 3.7-12 TRM 3.7-13 TRM 3.7-14 TRM 3.7-15 TRM 3.7-16 TRM 3.7-17 TRM 3.7-18 TRM 3.7-19 TRM 3.7-20 TRM 3.8-a TRM 3.8-1 TRM 3.8-2 TRM 3.8-3 TRM 3.8-4 TRM 3.8-5 TRM 3.8-6 TRM 3.8-7 TRM 3.8-8 TRM 3.8-9 TRM 3.8-10 TRM 3.8-11 TRM 3.8-12 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 58 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 60 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 60 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 44 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 60 Revision 31 Revision 31 Revision 50 Revision 50 Revision 50 Revision 50 Revision 50 Revision 50 Revision 31 TRM 3.8-13 TRM 3.8-14 TRM 3.8-15 TRM 3.8-16 TRM 3.8-17 TRM 3.8-18 TRM 3.9-a TRM 3.9-1 TRM 3.9-2 TRM 3.9-3 TRM 3.9-4 TRM 3.9-5 TRM 3.10-1 TRM 3.11-a TRM 3.11-1 TRM 3.12-a TRM 3.12-1 TRM 3.12-2 TRM 3.12-3 TRM 3.12-4 TRM 3.12-5 TRM 3.12-6 TRM 3.12-7 TRM 3.12-8 TRM 3.12-9 TRM 3.12-10 TRM 3.12-11 TRM 3.12-12 TRM 3.12-13 TRM 3.12-14 TRM 3.12-15 TRM 3.12-16 TRM 3.12-17 TRM 3.12-18 TRM 3.12-19 TRM 3.12-20 TRM 3.12-21 TRM 3.12-22 TRM 3.12-23 TRM 3.12-24 TRM 3.12-25 TRM 3.12-26 TRM 3.12-27 TRM 3.12-28 TRM 3.12-29 TRM 3.12-30 TRM 4.0-1 TRM 5.0-a TRM 5.0-1 TRM 5.0-2 TRM 5.0-3 TRM 5.0-4 Revision 61 Revision 46 Revision 31 Revision 31 Revision 43 Revision 33 Revision 31 Revision 31 Revision 65 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 53 Revision 53 Revision 53 Revision 31 Revision 57 Revision 40 Revision 31 Revision 49 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM Vol. I LEP-2 REV 67 4/23/04
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES evision Page Revi Page Ri sion TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 5.0-5 5.0-6 5.0-7 5.0-8 5.0-9 Bl.0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-2a B3.0-2b B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3.1-1 B3.2-1 B3.3.1-1 B3.3.1-2 B3.3.2-1 B3.3.2-2 B3.3.3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3.3.5-2 B3.3.6-1 B3.3.6-2 B3.3.6-3 B3.3.6-4 B3.3.6-5 B3.3.7-1 B3.3.7-2 B3.3.8-1 B3.3.9-1 B3.3.10-1 B3.3.11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4.1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 B3.4.6-1 B3.4.7-1 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 63 Revision 63 Revision 63 Revision 63 Revision 31 Revision 31 Revision 54 Revision 54 Revision 54 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 67 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 56 Revision 45 Revision 62 Revision 31 Revision 31 Revision 31 Revision 34 Revision 34 Revision 34 Revision 34 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM B3.5-1 B3.6.1-1 B3.6.2-1 B3.6.3-1 B3.6.4-1 B3.6.5-1 B3.6.6-1 B3.6.7-1 B3.6.8-1 B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3.7.9-2 B3.8.1-1 B3.8.2-1 B3.8.3-1 B3.8.4-1 B3.8.5-1 B3.8.6-1 B3.9.1-1 B3.9.2-1 B3.9.3-1 B3.9.4-1 B3.10-1 B3.11.1-1 B3.12.1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 Revision 31 Revision 31 Revision 67 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 43 Revision 31 Revision 65 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 44 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 TRM Vol. I LEP-3 REV 67.
4/23/04
FERMI 2 -
TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 10, Revision 0 Page Revision Notation Page 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 18 19 20 TRM Vol. I LEP-4 REV 67 4/23/04
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I Table of Contents (Cont'd)
Section and Title Page TR 3.4.2 TR 3.4.3 TR 3.4.4 TR 3.4.5 TR 3.4.6 TR 3.4.7 TR 3.5 Safety Relief Valve (SRV) Position Indication....
Reactor Coolant System (RCS) Leakage Detection System...........................................
Reactor Pressure Vessel Water Level - Cold Shutdown.........................................
Chemistry........................................
Structural Integrity.............................
Recirculation Pump MG Set Scoop Tube.............
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLANT (RCIC) SYSTEM (Blank).............
TRM 3.4-2 TRM 3.4-3 TRM TRM TRM TRM 3.4-4 3.4-5 3.4-9 3.4-10 TRM 3.5-1 TR 3.6 TR 3.6.1 TR 3.6.2 TR 3.6.3 TR 3.6.4 TR 3.6.5 TR 3.6.6 TR 3.6.7 TR 3.6.8 TR 3.7 TR 3.7.1 TR 3.7.2 TR 3.7.3 TR 3.7.4 TR 3.7.5 TR 3.7.6 TR 3.7.7 TR 3.7.8 TR 3.7.9 TR 3.8 TR 3.8.1 TR 3.8.2 TR 3.8.3 TR 3.8.4 TR 3.8.5 TR 3.8.6 CONTAINMENT SYSTEMS Suppression Chamber..............................
Primary Containment Hydrogen Recombiners (Blank)
Primary Containment Isolation Valves (PCIVs)
Reactor Building-to-Suppression Chamber Vacuum Breaker Position Indication......................
Suppression Chamber-to-Drywell Vacuum Breaker Position Indication..............................
Main Steam Isolation Valve (MSIV) Leakage Control System (LCS).....................................
Secondary Containment Isolation Valves (SCIVs)...
Drywell Spray....................................
PLANT SYSTEMS Ultimate Heat Sink (UHS) Minimum Temperature.....
Control Room Emergency Filtration (CREF) System..
Control Center Air Temperature...................
Shore Barrier Protection.........................
Sealed Source Contamination.....................
Main Turbine Bypass System.......................
Appendix R Alternative Shutdown Auxiliary Systems (Blank)..........................................
Snubbers.........................................
ELECTRICAL POWER SYSTEMS AC Circuits Inside Primary Containment...........
(Blank)..........................................
AC Sources.......................................
Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection Primary Containment Penetration Conductor Overcurrent Protection Devices...................
Standby Liquid Control (SLC) System Associated Isolation Devices................................
TRM 3.6-1 TRM 3.6-2 TRM 3.6-3 TRM 3.6-27 TRM 3.6-29 TRM 3.6-32 TRM 3.6-33 TRM 3.6-34 I
TRM TRM TRM TRM TRM TRM TRM TRM TRM 3.7-1 3.7-2 3.7-4 3.7-5 3.7-9 3.7-11 3.7-12 3.7-19 3.7-20 TRM 3.8-1 TRM 3.8-2 TRM 3.8-3 TRM 3.8-5 TRM 3.8-12 TRM 3.8-16 (continued)
TRM VOL I TRM-ii REV 67 04/04
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I Table of Contents (Cont'd)
Section and Title Page TR B3.6 TR B3.6.1 TR B3.6.2 TR B3.6.3 TR B3.6.4 TR B3.6.5 TR B3.6.6 TR B3.6.7 TR B3.6.8 CONTAINMENT SYSTEMS Suppression Chamber............................
Primary Containment Hydrogen Recombiners (Blank)
Primary Containment Isolation Valves (PCIVs)...
Reactor Building-to-Suppression Chamber Vacuum Breaker Position Indication....................
Suppression Chamber-to-Drywell Vacuum Breaker Position Indication............................
Main Steam Isolation Valve (MSIV) Leakage Control System (LCS)...................................
Secondary Containment Isolation Valves (SCIVs).
Drywell Spray..................................
TRM B3.6.1-1 TRM B3.6.2-1 TRM B3.6.3-1 TRM B3.6.4-1 TRM B3.6.5-1 I
TRM TRM TRM B3.6.6-1 B3.6.7-1 B3.6.8-1 TR B3.7 TR B3.7.1 TR B3.7.2 TR B3.7.3 TR B3.7.4 TR B3.7.5 TR B3.7.6 TR B3.7.7 TR B3.7.8 TR B3.7.9 PLANT SYSTEMS Ultimate Heat Sink (UHS) Minimum Temperature...
Control Room Emergency Filtration (CREF) System Control Center Air Temperature.................
Shore Barrier Protection.......................
Sealed Source Contamination....................
Main Turbine Bypass System.....................
Appendix R Alternative Shutdown Auxiliary Systems........................................
(Blank)........................................
Snubbers.......................................
TRM TRM TRM TRM TRM TRM TRM TRM TRM B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 TR B3.8 TR B3.8.1 TR B3.8.2 TR B3.8.3 TR B3.8.4 TR B3.8.5 TR B3.8.6 TR B3.9 TR B3.9.1 TR B3.9.2 TR B3.9.3 TR B3.9.4 TR B3.10 TR B3.11 TR B3.11.1 ELECTRICAL POWER SYSTEMS AC Circuits Inside Primary Containment.........
(Blank)
AC Sources.....................................
Electrical Equipment Protective Devices Motor-Operated Valves Thermal Overload Protection.....................................
Primary Containment Penetration Conductor Overcurrent Protection Devices.................
Standby Liquid Control System Associated Isolation Devices..............................
REFUELING OPERATIONS Communications.................................
Refueling Platform.............................
Crane Travel -
Spent Fuel Storage Pool.........
Reactor Pressure Vessel Water Level -
Refueling SPECIAL OPERATIONS (Blank)........................
RADIOACTIVE EFFLUENTS Temporary Outdoor Storage Tank Radioactivity...
TRM B3.8.1-1 TRM B3.8.2-1 TRN B3.8.3-1 TRM B3.8.4-1 TRM B3.8.5-1 TRM B3.8.6-1 TRM B3.9.1-1 TRM B3.9.2-1 TRM B3.9.3-1 TRM B3.9.4-1 TRM B3.10-1 TRM B3.11.1-1 (continued)
TRM VOL I TRM-v REV 67 04/04
Accident Monitoring Instrumentation TR 3.3.3 TR 3.3 INSTRUMENTATION TR 3.3.3 Accident Monitoring Instrumentation TRLCO 3.3.3 APPLICABILITY:
The Non-Type A, Non-Category 1 Post Accident Monitoring Instrumentation for each Function in Table TR3.3.3-1 shall be OPERABLE.
According to Table TR3.3.3-1.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each Function.
CONDITION REQUIRED ACTION COMPLETION TIME A.
For Functions 1, 2, A.1 Restore required 7 days and 3, one or more channel to OPERABLE Functions with one status.
required channel inoperable.
B.
For Functions 1, 2, B.1 Restore one required 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> and 3, one or more channel to OPERABLE Functions with more status.
than one required channel inoperable.
C.
For Function 4, one or C.1 Restore the required 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> more required channels channel(s) to inoperable.
OPERABLE status.
D.
For Functions 6 and 7, D.1 Restore required 30 days one or more Functions channel to OPERABLE with one required status.
channel inoperable.
(continued)
TRM Vol. I TRM 3.3-12 REV 67 04/04
Accident Monitoring Instrumentation TR 3.3.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E.
For Functions 6 and 7, F.1 Restore one required 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> one or more Functions channel to OPERABLE with more than one status.
required channel inoperable.
F.
Required-Action and F.1 Submit a Corrective Immediately associated Completion Action Document for Time of Condition A, evaluation of the B, C, D or E not met.
degraded condition.
G.
For Functions 5.a, G.1 Initiate the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 5.b, 5.c, and 5.d, one preplanned alternate or more Functions with method of monitoring one or more required the appropriate channels inoperable.
parameterts).
AND G.2 Restore channel(s) to 7 days OPERABLE status.
H.
Required Action and H.1 Submit a Corrective 14 days associated Completion Action Document Time of Condition G outlining the action not met.
taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status.
TRM Vol. I TRM 3.3-13 REV 67 04/04
Accident Monitoring Instrumentation TR 3.3.3 SURVEILLANCE REQUIREMENTS
NOTE---------------------------------------
These SRs apply to each Function in Table TR3.3.3-1.
SURVEILLANCE FREQUENCY TRSR 3.3.3.1 Perform CHANNEL CHECK.
31 days TRSR 3.3.3.2
NOTE----------------------
Only applicable to Functions 1, -2, 3, 4
and 5.
Perform CHANNEL CALIBRATION.
18 months TRSR 3.3.3.3
NOTES---------------------
- 1.
Only applicable to Functions 6 and 7.
- 2.
Not required to be performed until 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for one channel, and 7 days for the second channel after 2 15% RTP.
Perform___CHANNEL
___C__I____TIO
__.__2__DAYS Perform CHANNEL CALIBRATION.
92 DAYS TRM Vol. I TRM 3.3-13a REV 67 04/04
Accident Monitoring Instrumentation TR 3.3.3 TABLE TR3.3.3-1 (Page 1 of 1)
Non-Type A, Non-Category 1 Post Accident Monitoring Instrumentation FUNCTION
- 1.
Suppression Chamber Air Temperature
- 2.
Suppression Chamber Pressure
- 3.
Drywell Air Temperature
- 4.
Safety/Relief Valve Position Indicators
- 5.
Standby Gas Treatment (SGT) System Radiation Monitors
- a. Noble Gas (Low-range)(a)
- b. Noble Gas (Mid-range)
- c. AXM-Noble Gas (Mid-range)
- d. AXM-Noble Gas (High-range)
- 6.
Primary Containment 02 Concentration
- 7.
Primary Containment H2 Concentration APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS 1,2 1,2 1,2 1,2 1,2,3 1,2,3 1,2,3 1,2,3 1, 2 1, 2 REQUIRED CHANNELS 2
2 2
1 pressure switch per valve 1 per subsystem 1 per subsystem 1 per subsystem 1 per subsystem.
2 2
(a), Also included in the ODCM.
TRM Vol. I TRM 3.3-14 REV 67 04/04
Primary Containment Hydrogen Recombiners TR 3.6.2 TR 3.6 CONTAINMENT SYSTEMS TR 3.6.2 Primary Containment Hydrogen Recombiners (Deleted)
THIS PAGE INTENTIONALLY LEFT BLANK TRM Vol. I TRM 3.6-2 REV 67 04/04
Accident Monitoring Instrumentation TR B3.3.3 TR B3.3 INSTRUMENTATION TR B3.3.3 Accident Monitoring Instrumentation BASES See Technical Specifications Bases for LCO 3.3.3.1, Post Accident Monitoring Instrumentation.-
The primary containment hydrogen analyzer is a Regulatory Guide (R.G.) 1.97 Rev.
2, Type C, Category 3 variable provided to diagnose the course of beyond design basis accidents. The primary containment oxygen analyzer is a R.G. 1.97, Type C, Category 2 variable provided to verify the status of the inerted containment.
The multiple noble gas monitors installed on each division of the Standby Gas Treatment system provide the necessary monitoring capabilities to assure that the normal and extended monitoring ranges required by NUREG-0737 and Regulatory Guide 1.97 are met.
The 92 day Frequency for the primary containment oxygen and hydrogen analyzers Channel Calibration (per Note 1 to TRSR 3.3.3.3) is based upon vendor recommendations and instrument accuracy requirements.
TRSR 3.3.3.3 is modified by Note 2 stating that performance of the calibration of the oxygen and hydrogen monitors may be delayed until after exceeding 15% RTP (i.e., the power at which Technical Specification LCO 3.6.3.1 requires the primary containment to be inerted).
This delay is allowed for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for one oxygen and one hydrogen monitor, and for 7 days for the second oxygen and hydrogen monitor.
These delays facilitate more accurate calibration methods, which can be employed with the primary containment inerted.
TRM Vol. I TRM B3.3.3-1 Rev. 67 04/04
Primary Containment Hydrogen Recombiners TR B3.6.2 TR B3.6 TR B3.6.2 CONTAINMENT SYSTEMS Primary Containment Hydrogen Recombiners (Deleted)
THIS PAGE INTENTIONALLY LEFT BLANK TRM Vol. I TRM B3.6.2-1 REV.
67 04/04