Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212J631 | 1 October 1999 | SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 | Incorporated by reference |
ML20217G372 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With | |
ML20217G795 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20212F476 | 23 September 1999 | Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively | |
ML20212F083 | 23 September 1999 | Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval | Safe Shutdown VT-2 Incorporated by reference |
ML20217F366 | 22 September 1999 | Rev 18 to McGuire Unit 1 Cycle 14 Colr | Boric Acid Shutdown Margin |
ML20212D191 | 20 September 1999 | SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 | |
ML20211B128 | 31 August 1999 | Dynamic Rod Worth Measurement Using Casmo/Simulate | |
ML20212C476 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With | |
ML20216E885 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20217G810 | 31 August 1999 | Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 | |
ML20211G526 | 24 August 1999 | SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 | VT-2 Incorporated by reference Dissimilar Metal Weld Unidentified leakage |
ML20211F344 | 17 August 1999 | Updated non-proprietary Page 2-4 of TR DPC-NE-2009 | |
ML20210L436 | 2 August 1999 | Cycle 9 12-Month SG Insp Rept | |
ML20210S237 | 31 July 1999 | Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20216E378 | 31 July 1999 | Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20216E895 | 31 July 1999 | Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20210L445 | 31 July 1999 | Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept | |
ML20210G663 | 28 July 1999 | Cycle 9 90-Day ISI Summary Rept | |
ML20209E436 | 9 July 1999 | SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation | |
ML20196K663 | 7 July 1999 | Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers | Operability Determination |
ML20209H383 | 30 June 1999 | Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20209H163 | 30 June 1999 | Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20210S249 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20211F903 | 30 June 1999 | Cycle 9 Refueling Outage | |
ML20196J852 | 28 June 1999 | Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i) | Non-Destructive Examination Incorporated by reference |
ML20195K369 | 31 May 1999 | Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20195K295 | 31 May 1999 | Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20196L188 | 31 May 1999 | Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology | GOTHIC |
ML20206T477 | 31 May 1999 | Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology | Boric Acid Shutdown Margin Loop seal Fuel cladding Coast down Affidavit Manual Operator Action |
ML20209H173 | 31 May 1999 | Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20206N351 | 11 May 1999 | Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs | Stroke time |
ML20206Q895 | 5 May 1999 | Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10 | |
ML20195K376 | 30 April 1999 | Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20206R503 | 30 April 1999 | Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With | |
ML20206R089 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205L234 | 5 April 1999 | SFP Criticality Analysis | |
ML20205P899 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205P981 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20206R093 | 31 March 1999 | Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205C417 | 25 March 1999 | Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed | Safe Shutdown Fire Barrier Emergency Lighting Fire Protection Program Backfit |
ML20207K205 | 5 March 1999 | Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed | |
ML20205P902 | 28 February 1999 | Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20205B663 | 28 February 1999 | Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys | |
ML20204C311 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With | |
ML20204C891 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20203H738 | 18 February 1999 | Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed Conditions | Shutdown Margin |
ML20204C896 | 31 January 1999 | Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 | |
ML20211A202 | 31 January 1999 | Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP Intersections | Weak link |