Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20212J6311 October 1999SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1Incorporated by reference
ML20217G37230 September 1999Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With
ML20217G79530 September 1999Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2
ML20212F47623 September 1999Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively
ML20212F08323 September 1999Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI IntervalSafe Shutdown
VT-2
Incorporated by reference
ML20217F36622 September 1999Rev 18 to McGuire Unit 1 Cycle 14 ColrBoric Acid
Shutdown Margin
ML20212D19120 September 1999SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2
ML20211B12831 August 1999Dynamic Rod Worth Measurement Using Casmo/Simulate
ML20212C47631 August 1999Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With
ML20216E88531 August 1999Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2
ML20217G81031 August 1999Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2
ML20211G52624 August 1999SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1VT-2
Incorporated by reference
Dissimilar Metal Weld
Unidentified leakage
ML20211F34417 August 1999Updated non-proprietary Page 2-4 of TR DPC-NE-2009
ML20210L4362 August 1999Cycle 9 12-Month SG Insp Rept
ML20210S23731 July 1999Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2
ML20216E37831 July 1999Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20216E89531 July 1999Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2
ML20210L44531 July 1999Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept
ML20210G66328 July 1999Cycle 9 90-Day ISI Summary Rept
ML20209E4369 July 1999SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation
ML20196K6637 July 1999Safety Evaluation Supporting Licensee 990520 Position Re Inoperable SnubbersOperability Determination
ML20209H38330 June 1999Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20209H16330 June 1999Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2
ML20210S24930 June 1999Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2
ML20211F90330 June 1999Cycle 9 Refueling Outage
ML20196J85228 June 1999Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i)Non-Destructive Examination
Incorporated by reference
ML20195K36931 May 1999Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2
ML20195K29531 May 1999Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20196L18831 May 1999Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response MethodologyGOTHIC
ML20206T47731 May 1999Rev 3 to UFSAR Chapter 15 Sys Transient Analysis MethodologyBoric Acid
Shutdown Margin
Loop seal
Fuel cladding
Coast down
Affidavit
Manual Operator Action
ML20209H17331 May 1999Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2
ML20206N35111 May 1999Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related MovsStroke time
ML20206Q8955 May 1999Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10
ML20195K37630 April 1999Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2
ML20206R50330 April 1999Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With
ML20206R08930 April 1999Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2
ML20205L2345 April 1999SFP Criticality Analysis
ML20205P89931 March 1999Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2
ML20205P98131 March 1999Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20206R09331 March 1999Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2
ML20205C41725 March 1999Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings ReviewedSafe Shutdown
Fire Barrier
Emergency Lighting
Fire Protection Program
Backfit
ML20207K2055 March 1999Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed
ML20205P90228 February 1999Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2
ML20205B66328 February 1999Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys
ML20204C31128 February 1999Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With
ML20204C89128 February 1999Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2
ML20203H73818 February 1999Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed ConditionsShutdown Margin
ML20204C89631 January 1999Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2
ML20211A20231 January 1999Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP IntersectionsWeak link