Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217K12314 October 1999Revised Positions for DBNPS & Pnpp QA ProgramOffsite Dose Calculation Manual
Coatings
Nondestructive Examination
Local Leak Rate Testing
Process Control Program
Stress corrosion cracking
Commercial Grade
Fire Protection Program
ML20217F99230 September 1999Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20212J20130 September 1999Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico
PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With30 September 1999Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With
RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with30 September 1999Monthly Operating Rept for Sept 1999 for River Bend Station. with
ML20212F56423 September 1999SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity LimitsFire Barrier
ML20211Q3179 September 1999Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996
ML20216G1209 September 1999Rev 3 to Rbs,Cycle 9 ColrShutdown Margin
Anticipated operational occurrence
Feedwater Heater
RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With31 August 1999Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With
ML20216E48831 August 1999Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With31 August 1999Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With
RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection6 August 1999Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection
ML20210K4723 August 1999SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate ValvesPower-Operated Valves
Backfit
RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With31 July 1999Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With
ML20211A69231 July 1999Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With
PY-CEI-NRR-2424, Monthly Operating Rept for July 1999 for Perry Npp.With31 July 1999Monthly Operating Rept for July 1999 for Perry Npp.With
ML20210J38528 July 1999Pnpp - Unit 1 ISI Summary Rept Results for Outage 7 (1999) First Period,Second IntervalNon-Destructive Examination
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Intergranular Stress Corrosion Cracking
Liquid penetrant
Dissimilar Metal Weld
ML20209J19612 July 1999Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented
ML20210C6392 July 1999Rev 2 to River Bend Station,Cycle 9 Colr
ML20196K4981 July 1999Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI AcceptableHigh Radiation Area
Stroke time
Incorporated by reference
Foreign Material Exclusion
Power-Operated Valves
Scaffolding
ML20209G06930 June 1999Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With
PY-CEI-NRR-2416, Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With30 June 1999Monthly Operating Rept for June 1999 for Perry Nuclear Power Plant,Unit 1.With
RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With30 June 1999Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With
ML20196J80324 June 1999Rev 1 to Rbs,Cycle 9 Colr
ML20196A19517 June 1999Instrument Drift Analysis
ML20207G2747 June 1999Safety Evaluation Concluding That Firstenergy Flaw Evaluation Meets Rules of ASME Code & That IGSCC & Thermal Fatigue Crack Growth Need Not Be Considered in ApplicationWeld Overlay
Intergranular Stress Corrosion Cracking
Thermal fatigue
ML20196A11631 May 1999Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With
PY-CEI-NRR-2409, Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With31 May 1999Monthly Operating Rept for May 1999 for Perry Nuclear Power Plant,Unit 1.With
RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With31 May 1999Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With
PY-CEI-NRR-2393, Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be Explored12 May 1999Special Rept Update:On 990327 Refueling Outage 7 Began & Troubleshooting Efforts Began.Troubleshooting of Affected Calbe Confirmed Fault in Drywell Section of Cable.Determined That Installation of Newer Technology Should Be ExploredPost Accident Monitoring
ML20206G6453 May 1999Safety Evaluation Authorizing Requests for Relief IR-032 to IR-035 & IR-037 to IR-040 Re Implementation of Subsections IWE & Iwl of ASME Section XI for Containment InspCoatings
Nondestructive Examination
ML20206Q48330 April 1999Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With
ML20206J12030 April 1999Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators
PY-CEI-NRR-2399, Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With30 April 1999Monthly Operating Rept for Apr 1999 for Perry Nuclear Power Plant,Unit 1.With
RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With30 April 1999Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With
ML20206E22629 April 1999Safety Evaluation Concluding That Proposed Alternatives Will Result in Acceptable Level of Quality & Safety.Authorizes Use of Code Case N-504 for Weld Overlay Repair of FW Nozzle Weld at Pnpp & Use of Table IWB-3514Non-Destructive Examination
Weld Overlay
Intergranular Stress Corrosion Cracking
Stress corrosion cracking
Dissimilar Metal Weld
ML20206D79123 April 1999Rev 6 to PDB-F0001, COLR for Pnpp Unit 1 Cycle 8,Reload 7
ML20206A21121 April 1999Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002Stroke time
Incorporated by reference
Power-Operated Valves
ML20205P43715 April 1999Safety Evaluation Concluding That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking or Thermal BindingPower-Operated Valves
Backfit
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML20205P87731 March 1999Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20206D84631 March 1999Rev 1 to J11-03371SRLR, Supplemental Reload Licensing Rept for Pnpp,Unit 1 Reload 7 Cycle 8Shutdown Margin
Anticipated operational occurrence
ML20205S06031 March 1999Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331Fuel cladding
ML20205G42231 March 1999Safety Evaluation Accepting Second 10-yr Interval IST Program Releif Requests for Plant,Unit 1
PY-CEI-NRR-2389, Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With31 March 1999Monthly Operating Rept for Mar 1999 for Perry Nuclear Power Plant,Unit 1.With
RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With31 March 1999Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With
ML20205D54826 March 1999SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5)Incorporated by reference
Stress corrosion cracking
ML20205D31026 March 1999Safety Evaluation Supporting Amend 103 to License NPF-58Earthquake
ML20205C37626 March 1999Safety Evaluation Supporting Request for Proposed Exemption to 10CFR50,app a GDC 19Exemption Request
ML20207M92312 March 1999Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results