ML20217D640 | 31 October 1999 | Rev 2 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation | Anticipated operational occurrence Hydrostatic |
ML20217G996 | 14 October 1999 | SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & | VT-2 Incorporated by reference |
ML20217F289 | 13 October 1999 | Drill 99-08 Emergency Preparedness Exercise on 991013 | Grab sample |
ML20217E269 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With | |
RC-99-0202, Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for VC Summer Nuclear Station.With | |
ML20217G721 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with | |
BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | |
ML17300B381 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr | |
ML20217H522 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With | |
ML20217G152 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Wolf Creek Generating Station.With | |
ML20217P635 | 29 September 1999 | Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20216J419 | 24 September 1999 | Part 21 Rept Re 990806 Abb K-Line Breaker Defect After Repair.Vendor Notified of Shunt Trip Wiring Problem & Agreed to Modify Procedure for Refurbishment of Breakers | Unanalyzed Condition Earthquake |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212A336 | 14 September 1999 | 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included | |
ML20212D071 | 14 September 1999 | Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities | Hot Short Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Earthquake |
ML20212A744 | 10 September 1999 | Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety | Hydrostatic VT-2 Incorporated by reference Finite Element Analysis Liquid penetrant |
RC-99-0180, Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression | 8 September 1999 | Special Rept on 990807,electric Driven Fire Pump XPP0134A Was Declared Inoperable.Caused by Pump Discharge Relief Valve Failing to Open as Normally Expected.Two Temporary Fire Pumps Were Installed to Provide Backup Suppression | |
ML20211N045 | 2 September 1999 | Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding | Safe Shutdown Power-Operated Valves Backfit |
ML20211N016 | 2 September 1999 | Safety Evaluation Supporting GL 95-07 to License NPF-42 | Safe Shutdown Power-Operated Valves Backfit |
ML20212A025 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Wolf Creek Generating Station.With | |
ML20212B926 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With | |
ML17300B327 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 | |
ML20211K616 | 31 August 1999 | Rev 2 to VC Summer Nuclear Station,Colr for Cycle 12, Dtd Aug 1999 | |
RC-99-0183, Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Virgil C Summer Nuclear Station,Unit 1.With | |
ML20211Q214 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With | |
ML20212A020 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With | |
BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | |
ML20217P645 | 30 August 1999 | Requests Commission Approval to Publish Encl Pr,Rg & SRP & to Issue Encl Ltr to Parties of Wolf Creek Transfer Proceeding Re Disposition of Existing Antitrust License Conditions in Event OL Transfer Approved | Backfit |
ML17313B075 | 27 August 1999 | LER 99-002-00:on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with 990827 Ltr | Missed surveillance |
RC-99-0168, Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed | 19 August 1999 | Special Rept:On 990804,electric Driven Fire Pump XPP0134A & Diesel Driven Fire Pump XPP0134B,were Removed from Svc to Allow for Plant Mod.Fire Pumps Were Returned to Operable Condition on 990818,after Mod Was Completed | |
ML20210R642 | 13 August 1999 | ISI Outage Rept for A2R07 | Boric Acid Hydrostatic VT-2 Moisture barrier Liquid penetrant |
ML20210P044 | 10 August 1999 | Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 | VT-2 Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML20210Q833 | 5 August 1999 | Rev 4 to Callaway Cycle 10 Colr | |
ML20210U811 | 4 August 1999 | SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a | |
ML20210T948 | 3 August 1999 | Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 | Probabilistic Risk Assessment Large early release frequency |
ML20216D879 | 31 July 1999 | Rev 3 to Callaway Cycle 10 Colr | |
ML20211C220 | 31 July 1999 | Rev 1 to WCAP-15102, VC Summer Unit 1 Heatup & Cooldown Limit Curves for Normal Operation | Anticipated operational occurrence Hydrostatic |
RC-99-0163, Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With | 31 July 1999 | Monthly Operating Rept for July 1999 for VC Summer Nuclear Station,Unit 1.With | |
ML20210M707 | 31 July 1999 | Rev 1 to VC Summer Nuclear Station COLR for Cycle 12 | |
ML20210S058 | 31 July 1999 | Monthly Operating Rept for July 1999 for Waterford 3.With | |
ML20210Q636 | 31 July 1999 | Corrected Monthly Operating Rept for July 1999 for Waterford 3 | |
BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | |
ML20210T445 | 31 July 1999 | Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With | |
ML20210R343 | 31 July 1999 | Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With | |
ML17313B061 | 31 July 1999 | Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr | |
ML20210R574 | 31 July 1999 | Monthly Operating Rept for July 1999 for Wolf Creek Generating Station | |
ML20210K986 | 30 July 1999 | Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs | Stroke time |
ML20210H653 | 30 July 1999 | SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 | Boric Acid High Radiation Area Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Scaffolding |
ML20210J156 | 29 July 1999 | Rev 0 to Wolf Creek Generating Station,Unit 1 Pressure & Temp Limts Rept | Hydrostatic Pressure and Temperature Limits Report |
ML20210D895 | 23 July 1999 | Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 |