Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217K47030 September 1999Monthly Operating Rept for Sept 1999 for TMI-1.With
ML20211Q35531 August 1999Monthly Operating Rept for Aug 1999 for Tmi,Unit 1.With
ML20211H51131 August 1999Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis
ML20210R47913 August 1999Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2Decommissioning Funding Plan
Fire Protection Program
ML20210U47931 July 1999Monthly Operating Rept for July 1999 for TMI-1.With
ML20210K7659 July 1999Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca
ML20209G0019 July 1999Staff Evaluation of Individual Plant Exam of External Events Submittal on Plant,Unit 1Hot Short
High winds
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20209H8251 July 1999Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station
ML20209H14230 June 1999Monthly Operating Rept for June 1999 for TMI-1.With
ML20195H0758 June 1999Drill 9904, 1999 Biennial Exercise for Three Mile Island
ML20195H92631 May 1999Monthly Operating Rept for May 1999 for TMI-1.With
ML20209G03531 May 1999TER on Review of TMI-1 IPEEE Submittal on High Winds,Floods & Other External Events (Hfo)High winds
Tornado Generated Missile
ML20207B66227 May 1999SER Finding That Licensee Established Acceptable Program to Periodically Verify design-basis Capability of safety-related MOVs at TMI-1 & That Util Adequately Addressed Actions Required in GL 96-05Stroke time
Probabilistic Risk Assessment
ML20206R05730 April 1999Monthly Operating Rept for Apr 1999 for Tmi,Unit 1.With
ML20206D42020 April 1999Safety Evaluation Granting Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c for Fire Areas/Zones AB-FZ-4,CB-FA-1,FH-FZ-1,FH-FZ-6,FH-FZ-6, IPSH-FZ-1,IPSH-FZ-2,AB-FZ-3,AB-FZ-5,AB-FZ-7 & FH-FZ-2Safe Shutdown
High Radiation Area
Fire Barrier
Functionality Assessment
Exemption Request
Fire Protection Program
ML20205K68531 March 1999Monthly Operating Rept for Mar 1999 for Tmi,Unit 1.With
ML20209G00731 March 1999Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion)Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Seismically rugged
Earthquake
Weak link
ML20210C0161 March 1999Forwards Corrected Pp 3 of SECY-98-252.Correction Makes Changes to Footnote 3 as Directed by SRM on SECY-98-246
ML20207M84628 February 1999Monthly Operating Rept for Feb 1999 for TMI-1.With
ML20196K35622 January 1999Safety Evaluation Concluding That Although Original Licensee Thermal Model Was Unacceptable for Ampacity Derating Assessments Revised Model Identified in 970624 Submittal Acceptable for Installed Electrical Raceway Ampacity LimitsFire Barrier
ML20206P1505 January 1999LER 98-S03-00:on 981207,security Officer Discovered Uncontrolled Safeguards Info Drawing.Caused by Failure to Follow Established Procedures & Policies.Drawing Was Controlled by Site Security.WithTime of Discovery
ML20216F99331 December 1998Piedmont Municipal Power Agency 1998 Annual Rept
ML20196G46631 December 1998British Energy Annual Rept & Accounts 1997/98. Prospectus of British Energy Share Offer EnclEnvironment Report
ML20207A92931 December 19981998 Annual Rept for TMI-1 & TMI-2
ML20198E63817 December 1998LER 98-S02-00:on 981130,security Access Was Revoked Due to Falsification of Criminal Record.Individual Was Escorted from Protected Area & Unescorted Access Was Restricted. with
ML20196F6862 December 1998Safety Evaluation Accepting Licensee Second 10-yr Interval ISI Program Plan Request for Alternative to ASME B&PV Code Section XI Requirements Re Actions to Be Taken Upon Detecting Leakage at Bolted ConnectionVT-2
Incorporated by reference
ML20198B86430 November 1998Monthly Operating Rept for Nov 1998 for TMI-1.With
ML20195J85912 November 1998Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan
ML20195C69212 November 1998Safety Evaluation Supporting Amend 52 to License DPR-73
ML20196B71931 October 1998Monthly Operating Rept for Oct 1998 for TMI-1.With
ML20203G12130 October 1998Informs Commission About Staff Preliminary Views Concerning Whether Proposed Purchase of TMI-1,by Amergen,Inc,Would Cause Commission to Know or Have Reason to Believe That License for TMI-1 Would Be Controlled by Foreign Govt
ML20155E75115 October 1998Rev 1 to Form NIS-1 Owners Data Rept for Isi,Rept on 1997 Outage 12R EC Exams of TMI-1 OTSG Tubing
ML20154L55430 September 1998Monthly Operating Rept for Sept 1998 for TMI Unit 1.With
ML20153G46030 September 1998USI A-46 Seismic Evaluation Rept, Vols 1-2Safe Shutdown
High Radiation Area
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Emergency Lighting
Design basis earthquake
Earthquake
Scaffolding
ML20153A99416 September 1998Safety Evaluation Denying Request to Remove Missile Shields from Plant Design
ML17354B0979 September 1998Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils
ML20151U8828 September 1998SER on Revised Emergency Action Levels for Gpu Nuclear,Inc, Three Mile Island Nuclear Plant Units 1 & 2Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Earthquake
Turbine Missile
Pressure Boundary Leakage
Pressure boundary leak
ML15261A4684 September 1998Safety Evaluation Supporting Amends 232,232 & 231 to Licenses DPR-38,DPR-47 & DPR-55,respectivelySafe Shutdown
Probabilistic Risk Assessment
Maintenance Rule Program
ML20151V28131 August 1998Monthly Operating Rept for Aug 1998 for Tmi,Unit 1.With
ML20237A83312 August 1998Safety Evaluation Accepting USI A-46 Program Implementation at Plant,Unit 1Safe Shutdown
Boric Acid
Safe Shutdown Earthquake
Coatings
Earthquake
ML20237C64131 July 1998Monthly Operating Rept for July 1998 for Tmi,Unit 1
ML20236R22030 June 1998Monthly Operating Rept for June 1998 for TMI-1
ML20236W9969 June 19981998 Quadrennial Simulator Certification Rept
ML20248F74431 May 1998Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity
ML20249A10631 May 1998Monthly Operating Rept for May 1998 for TMI-1
ML20247G07630 April 1998Monthly Operating Rept for Apr 1998 for Three Mile Island Nuclear Station,Unit 1
ML20212A21922 April 1998Rev 3 to Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2Nondestructive Examination
Temporary Modification
Fire Protection Program
ML20248H6998 April 1998Requests,By Negative Consent,Commission Approval of Intent to Inform Doe,Idaho Operations Ofc of Finding That Adequate Safety Basis Support Granting Exemption to 10CFR72 Seismic Design Requirement for ISFSI to Store TMI-2 Fuel DebrisSafe Shutdown
Safe Shutdown Earthquake
Exemption Request
Earthquake
ML20216K10631 March 1998Monthly Operating Rept for Mar 1998 for Three Mile Island Nuclear Station,Unit 1
ML20217E08124 March 1998Rev 0 to TR-121, TMI-1 Control Room Habitability for Max Hypothetical Accident