Issue date | Title | Topic | |
---|---|---|---|
ML20217N438 | 25 October 1999 | Safety Evaluation Supporting Amend 17 to License DPR-9 | |
ML20217P355 | 22 October 1999 | LER 99-S01-00:on 990922,loaded 9mm Handgun Was Discovered on Truck Cargo Area of Vehicle Inside Protected Area.Caused by Inadequate Vehicle Search.Guidance in Procedures & Security Training to Address Multiple Vehicle Searches Was Provided | Contraband Stolen |
ML20217G216 | 15 October 1999 | Errata Pages 2 & 3 for Safety Evaluation Supporting Amend 168 Issued to FOL DPR-63 Issued on 990921.New Pages Change Description of Flow Control Trip Ref Cards to Be Consistent with Application for Amend | Fuel cladding |
ML20217D306 | 13 October 1999 | SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation | Earthquake |
ML20217C912 | 12 October 1999 | SER Input Authorizing Licensee Proposed Request to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change | Shutdown Margin Spiral reload |
ML20217F909 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for LaSalle County Stations,Units 1 & 2.With | Coast down |
ML20216J925 | 30 September 1999 | Suppl to Special Rept:On 990621,11 Containment Hydrogen Monitoring Sys Chart Recorder Was Indicating Below Normal Operating Range.Caused by Excessive Wear on Valve Body & Discs of Bypass Pump.Sample Pump Replaced | |
ML20217D126 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With | |
ML20217K463 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Nine Mile Point, Unit 1.With | |
HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With | |
ML17300B381 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr | |
NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Fermi 2.With | |
U-603277, Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With | |
ML20217H522 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With | |
ML20217D121 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with | |
ML20217P635 | 29 September 1999 | Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212F730 | 21 September 1999 | Special Rept:On 990907,CR Operators Declared 12 Containment Hydrogen Monitoring Sys Inoperable for Planned Maint.Cause of Low Flow Condition Was Determined to Be Foreign Matl. Replaced Sample Pump Valve Discs | |
ML20212B908 | 14 September 1999 | Special Rept:On 990901, 12 Containment Hydrogen Monitoring Sys Was Declared Inoperable for Planned Maint.Caused by Planned Maint Being Performed as Corrective Action.Check Valves with O Rings Were Replaced | |
ML20212A664 | 13 September 1999 | Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program | |
ML20212A886 | 13 September 1999 | Safety Evaluation Authorizing First & Second 10 Yr Interval Inservice Insp Plan Requestss for Relief RR-01 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Pressure boundary leak |
ML20212B926 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With | |
ML20212A448 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With | |
U-603267, Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With | |
ML20216F514 | 31 August 1999 | Rept on Status of Public Petitions Under 10CFR2.206 | Unanalyzed Condition Hydrostatic |
ML20216E703 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With | |
HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With | |
ML20212C460 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Nine Mile Point Nuclear Station,Unit 1.With | |
ML20212C450 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for LaSalle County Station,Units 1 & 2.With | Coast down |
NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Fermi 2.With | |
ML17300B327 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 | |
ML17313B075 | 27 August 1999 | LER 99-002-00:on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with 990827 Ltr | Missed surveillance |
ML20211E989 | 20 August 1999 | LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5 | Hydrostatic VT-2 EVT-1 |
ML20210Q052 | 4 August 1999 | Safety Evaluation Approving Relief Request 10 to License DPR-22 Per 10CFR50.55a(g)(6)(i).Inservice Exam for Relief Request 10,Parts A,B,C,D & E Impractical & Reasonable Assurance of Structural Integrity Provided | Boric Acid Hydrostatic Incorporated by reference |
ML20210J927 | 2 August 1999 | SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding | Backfit |
ML20210J963 | 2 August 1999 | SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 | Stroke time |
ML20210Q661 | 31 July 1999 | Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With | |
HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With | |
ML20210R343 | 31 July 1999 | Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With | |
ML20210L705 | 31 July 1999 | Monthly Operating Repts for July 1999 for Limerick Generating Station,Units 1 & 2.With | |
U-603245, Monthly Operating Rept for Jul 1999 for CPS Unit 1.With | 31 July 1999 | Monthly Operating Rept for Jul 1999 for CPS Unit 1.With | |
ML20210U459 | 31 July 1999 | Monthly Operating Rept for July 1999 for Nine Mile Point, Unit 1.With | |
NRC-99-0065, Monthly Operating Rept for July 1999 for Fermi 2.With | 31 July 1999 | Monthly Operating Rept for July 1999 for Fermi 2.With | |
ML17313B061 | 31 July 1999 | Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr | |
ML20210R067 | 31 July 1999 | Monthly Operating Repts for July 1999 for LaSalle County Station,Units 1 & 2.With | Zebra Mussel Downpower |
ML20211C962 | 26 July 1999 | ISI Summary Rept | Hydrostatic Anchor Darling Nondestructive Examination VT-2 Liquid penetrant |
ML20210E225 | 21 July 1999 | B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Pressure Boundary Leakage |
ML17313B019 | 16 July 1999 | LER 99-005-00:on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure | Anticipated operational occurrence |
ML20210C168 | 9 July 1999 | Seventh Refueling Outage ASME Section XI Summary Rept | Packing leak Hydrostatic VT-2 |
U-603232, Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted | 9 July 1999 | Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted |