 Issue dateTitleTopic
ML20217L88321 October 1999Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18Incorporated by reference
ML18039A90415 October 1999LER 99-010-00:on 990917,automatic Reactor Scram on Turbine Stop Valve Closure Occurred.Caused by High Water Level in Main Steam Moisture Separator 2C2.Unit 2C2 Reservoir Level Transmitter & Relays Were Replaced & Tested Satisfactorily
ML18039A89814 October 1999LER 99-009-00:on 990915,manual Reactor Scram Was Noted Due to EHC Leak.Caused by Failure of Stainles Steel Tubing Connection.Removed Damaged Tubing & Connection Plug
ML20217D30613 October 1999SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage InstallationEarthquake
ML20217G20413 October 1999Safety Evaluation Supporting Amend 179 to License DPR-28Time of Discovery
Missed surveillance
ML18039A8958 October 1999LER 99-008-00:on 990905,HPCI Was Inoperable Due to Failed Flow Controller.Caused by Premature Failure of Capacitor 2C3.Replaced Controller & HPCI Sys Was Run IAW Sys Operating InstructionsFuel cladding
ML20217P0766 October 1999Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs
ML20217E33830 September 1999Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3
ML20217G03630 September 1999Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With
HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With30 September 1999Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With
ML18039A87530 September 1999LER 99-005-00:on 990901,SR for Standby Liquid Control Sampling Was Not Met.Caused by Deficient Procedure for Chemical Addition to Standby Liquid Control.Revised Procedure.With 990930 LtrMissed surveillance
ML20217F96730 September 1999Monthly Operating Repts for Sept 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
ML18107A55830 September 1999Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 LtrSafe Shutdown
Temporary Modification
ML18107A55730 September 1999Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 LtrSafe Shutdown
Temporary Modification
Coast down
ML20212K97830 September 1999Safety Evaluation Accepting USI A-46 Implementation ProgramSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Earthquake
ML20217D12130 September 1999Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with
BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With30 September 1999Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With
ML20217K80430 September 1999Rev 1 to Vegp,Unit 2 Cycle 7 ColrShutdown Margin
ML20217K77430 September 1999Rev 1 to Vegp,Unit 1 Cycle 9 ColrShutdown Margin
ML20217K45930 September 1999Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20217G74630 September 1999Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station
ML20217F99230 September 1999Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20212F56423 September 1999SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity LimitsFire Barrier
ML20212E63423 September 1999Suppl to SE Resolving Error in Original 990802 Se,Clarifying Fact That Licensee Has Not Committed to Retain Those Specific Compensatory Measures That Were Applied to one-time Extension
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212D38320 September 1999Safety Evaluation Supporting Proposed Rev to Withdrawal Schedule for First & Third Surveillance Capsules for BFN-3 RPV
ML20212C25517 September 1999Safety Evaluation Supporting Amend 175 to License DPR-28Shutdown Margin
ML20212A88613 September 1999Safety Evaluation Authorizing First & Second 10 Yr Interval Inservice Insp Plan Requestss for Relief RR-01Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Liquid penetrant
Pressure boundary leak
ML20212A66413 September 1999Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program
ML20212A14713 September 1999Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established
ML20211Q3179 September 1999Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996
ML20211N0513 September 1999SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design BasisSevere Accident Management Guideline
Exemption Request
Fuel cladding
ML20212E74531 August 1999Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.WithSafe Shutdown
Temporary Modification
ML20211Q82031 August 1999Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with
ML20216E49431 August 1999Monthly Operating Repts for Aug 1999 for Jmfnp.With
ML20216E48831 August 1999Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With
ML20212C50031 August 1999Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station
BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With31 August 1999Monthly Operating Rept for Aug 1999 for Vermont Yankee.With
ML20212A44831 August 1999Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With
ML20216E50631 August 1999Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with
HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With31 August 1999Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With
ML18039A88231 August 1999Increased MSIV Leakage Tech Spec Change Submittal - Seismic Evaluation Rept.Probabilistic Risk Assessment
Significance Determination Process
Design basis earthquake
Large early release frequency
Earthquake
Hardened vent
ML20212B85631 August 1999Monthly Operating Repts for Aug 1999 for Browns Ferry Nuclear Plant.With
ML18107A53131 August 1999Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913Safe Shutdown
Temporary Modification
Coast down
ML18107A53031 August 1999Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 LtrSafe Shutdown
Temporary Modification
ML18107A50326 August 1999LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 LtrTime of Discovery
Offsite Dose Calculation Manual
ML20211D64925 August 1999Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy
ML20211H86223 August 1999Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI IntervalCoatings
ML20211E98920 August 1999LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5Hydrostatic
VT-2
EVT-1