Issue date | Title | Topic | |
---|---|---|---|
ML20217L883 | 21 October 1999 | Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 | Incorporated by reference |
ML18039A904 | 15 October 1999 | LER 99-010-00:on 990917,automatic Reactor Scram on Turbine Stop Valve Closure Occurred.Caused by High Water Level in Main Steam Moisture Separator 2C2.Unit 2C2 Reservoir Level Transmitter & Relays Were Replaced & Tested Satisfactorily | |
ML18039A898 | 14 October 1999 | LER 99-009-00:on 990915,manual Reactor Scram Was Noted Due to EHC Leak.Caused by Failure of Stainles Steel Tubing Connection.Removed Damaged Tubing & Connection Plug | |
ML20217D306 | 13 October 1999 | SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation | Earthquake |
ML20217G204 | 13 October 1999 | Safety Evaluation Supporting Amend 179 to License DPR-28 | Time of Discovery Missed surveillance |
ML18039A895 | 8 October 1999 | LER 99-008-00:on 990905,HPCI Was Inoperable Due to Failed Flow Controller.Caused by Premature Failure of Capacitor 2C3.Replaced Controller & HPCI Sys Was Run IAW Sys Operating Instructions | Fuel cladding |
ML20217P076 | 6 October 1999 | Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs | |
ML20217E338 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 | |
ML20217G036 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With | |
ML18039A875 | 30 September 1999 | LER 99-005-00:on 990901,SR for Standby Liquid Control Sampling Was Not Met.Caused by Deficient Procedure for Chemical Addition to Standby Liquid Control.Revised Procedure.With 990930 Ltr | Missed surveillance |
ML20217F967 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3.With | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML18107A558 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr | Safe Shutdown Temporary Modification |
ML18107A557 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr | Safe Shutdown Temporary Modification Coast down |
ML20212K978 | 30 September 1999 | Safety Evaluation Accepting USI A-46 Implementation Program | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Earthquake |
ML20217D121 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Lgs,Units 1 & 2. with | |
BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With | |
ML20217K804 | 30 September 1999 | Rev 1 to Vegp,Unit 2 Cycle 7 Colr | Shutdown Margin |
ML20217K774 | 30 September 1999 | Rev 1 to Vegp,Unit 1 Cycle 9 Colr | Shutdown Margin |
ML20217K459 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With | |
ML20217G746 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station | |
ML20217F992 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20212F564 | 23 September 1999 | SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits | Fire Barrier |
ML20212E634 | 23 September 1999 | Suppl to SE Resolving Error in Original 990802 Se,Clarifying Fact That Licensee Has Not Committed to Retain Those Specific Compensatory Measures That Were Applied to one-time Extension | |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212D383 | 20 September 1999 | Safety Evaluation Supporting Proposed Rev to Withdrawal Schedule for First & Third Surveillance Capsules for BFN-3 RPV | |
ML20212C255 | 17 September 1999 | Safety Evaluation Supporting Amend 175 to License DPR-28 | Shutdown Margin |
ML20212A886 | 13 September 1999 | Safety Evaluation Authorizing First & Second 10 Yr Interval Inservice Insp Plan Requestss for Relief RR-01 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Pressure boundary leak |
ML20212A664 | 13 September 1999 | Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program | |
ML20212A147 | 13 September 1999 | Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established | |
ML20211Q317 | 9 September 1999 | Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 | |
ML20211N051 | 3 September 1999 | SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis | Severe Accident Management Guideline Exemption Request Fuel cladding |
ML20212E745 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With | Safe Shutdown Temporary Modification |
ML20211Q820 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with | |
ML20216E494 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Jmfnp.With | |
ML20216E488 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With | |
ML20212C500 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station | |
BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Vermont Yankee.With | |
ML20212A448 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Limerick Generating Station,Units 1 & 2.With | |
ML20216E506 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with | |
HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With | |
ML18039A882 | 31 August 1999 | Increased MSIV Leakage Tech Spec Change Submittal - Seismic Evaluation Rept. | Probabilistic Risk Assessment Significance Determination Process Design basis earthquake Large early release frequency Earthquake Hardened vent |
ML20212B856 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Browns Ferry Nuclear Plant.With | |
ML18107A531 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 | Safe Shutdown Temporary Modification Coast down |
ML18107A530 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr | Safe Shutdown Temporary Modification |
ML18107A503 | 26 August 1999 | LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr | Time of Discovery Offsite Dose Calculation Manual |
ML20211D649 | 25 August 1999 | Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy | |
ML20211H862 | 23 August 1999 | Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval | Coatings |
ML20211E989 | 20 August 1999 | LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5 | Hydrostatic VT-2 EVT-1 |