Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K944 | 15 October 1999 | SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) | Nondestructive Examination |
ML20217K915 | 15 October 1999 | SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) | Nondestructive Examination Incorporated by reference |
ML20217F150 | 12 October 1999 | Special Rept:On 990929,south Plant Vent (SPV) Range Ng Monitor Was Inoperable.Monitor Was Inoperable for More than 72 H.Caused by Electronic Noise Generated from Noise Suppression Circuit.Replaced Circuit | Grab sample |
ML20217E802 | 7 October 1999 | CPSES Unit 1 Cycle 8 Colr | Shutdown Margin |
ML20217G415 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 | Coast down |
L-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | 30 September 1999 | Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | |
ML20217N653 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with | 30 September 1999 | Monthly Operating Rept for Sept 1999 for River Bend Station. with | |
NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With | |
ML20217D053 | 30 September 1999 | Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr | |
ML20217D048 | 30 September 1999 | Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr | |
ML20212F767 | 24 September 1999 | SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) | Incorporated by reference |
ML20217M021 | 20 September 1999 | Part 21 Rept Re Possible Deviation of NLI Dc Power Supply Over Voltage Protection Circuit Actuation.Caused by Electrical Circuit Conditions Unique to Remote Engine Panel. Travelled to Hope Creek to Witness Startup Sequence of DG | |
ML20216J570 | 16 September 1999 | Rev 2 to CPSES Unit 2 Cycle 5 Colr | Shutdown Margin |
ML20216G120 | 9 September 1999 | Rev 3 to Rbs,Cycle 9 Colr | Shutdown Margin Anticipated operational occurrence |
ML20211Q673 | 9 September 1999 | Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 | Boric Acid Hydrostatic VT-2 Incorporated by reference |
ML20211P841 | 9 September 1999 | Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 | Incorporated by reference |
ML20211P781 | 9 September 1999 | SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 | Incorporated by reference |
ML20211N553 | 8 September 1999 | Safety Evaluation Supporting Amend 121 to License NPF-57 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | 2 September 1999 | LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | |
L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | |
ML20212E519 | 31 August 1999 | Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment | |
NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With | |
RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With | |
TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Cpses.With | |
ML20211F453 | 24 August 1999 | Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period | Non-Destructive Examination Incorporated by reference |
ML20211F511 | 23 August 1999 | Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 | Nondestructive Examination VT-2 Incorporated by reference |
ML20211B378 | 13 August 1999 | Special Rept 99-002:on 990730,NPV Radiation Monitoring Sys Was Declared Inoperable.Caused by Voltage Induced in Detector Output by Power Cable to Low Range Sample Pump. Separated Cables & Secured in Place to Prevent Recurrence | |
ML20211M298 | 6 August 1999 | Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 | |
RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection | 6 August 1999 | Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection | |
ML20210K472 | 3 August 1999 | SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves | Power-Operated Valves Backfit |
RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With | 31 July 1999 | Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With | |
L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With | Zebra Mussel |
ML20210U472 | 31 July 1999 | Monthly Operating Rept for July 1999 for Hope Creek Generating Station,Unit 1.With | Safe Shutdown Temporary Modification |
ML20210R363 | 31 July 1999 | Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With | |
ML20210C941 | 31 July 1999 | Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 | |
ML20210U408 | 31 July 1999 | Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 | Downpower |
ML20216D833 | 26 July 1999 | Safety Evaluation Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given HCGS Design,Operation & History | Safe Shutdown High winds Tornado Missile Safe Shutdown Earthquake Earthquake |
ML20216D872 | 26 July 1999 | Review of Submittal in Response to USNRC GL 88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Hope Creek Rev 1:980518 | Hot Short Safe Shutdown Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Fire Protection Program Fire Watch |
ML20210D832 | 23 July 1999 | Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp | Coatings Moisture barrier |
ML20210D916 | 23 July 1999 | Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency | Enforcement Discretion Probabilistic Risk Assessment Incorporated by reference Foreign Material Exclusion Large early release frequency |
ML20210F333 | 22 July 1999 | Safety Evaluation Granting Relief Requests RR-B1,RR-C1,RR-D1 & RR-B3.Finds That Proposed Alternative for RR-B3 Provides Acceptable Level of Quality & Safety & Authorizes Alternative Pursuant to 10CFR50.55a(a)(3)(i) | Fire Barrier Incorporated by reference Pressure Boundary Leakage |
ML20210D449 | 21 July 1999 | Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review | |
ML20210D482 | 21 July 1999 | 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 | |
NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With | 15 July 1999 | LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With | |
ML20209H766 | 15 July 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 | Safe Shutdown Power-Operated Valves |
ML20209H272 | 9 July 1999 | 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage | |
ML20209H263 | 9 July 1999 | 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage | Hydrostatic Liquid penetrant |
ML20209G750 | 8 July 1999 | SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Earthquake |