Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217N327 | 21 October 1999 | Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised | |
ML20217K993 | 14 October 1999 | Safety Evaluation Supporting Amend 234 to License DPR-56 | |
ML20217C912 | 12 October 1999 | SER Input Authorizing Licensee Proposed Request to Modify Definition of Core Alteration in Section 1.0 of TS & Update Sections 3/4.1,3.4.3 & 3/4.9 to Reflect Proposed Definition Change | Shutdown Margin Spiral reload |
ML20217B433 | 5 October 1999 | Safety Evaluation Supporting Amend 233 to License DPR-56 | Anticipated operational occurrence Minimum Critical Power Ratio Fuel cladding |
ML20217G354 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with | |
L-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | 30 September 1999 | Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with | |
ML20217D126 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Monticello Nuclear Generating Plant.With | |
BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with | |
ML20217F909 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for LaSalle County Stations,Units 1 & 2.With | Coast down |
ML20217E338 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 | |
ML20216H709 | 24 September 1999 | Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively | |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212D128 | 17 September 1999 | Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 | Coatings Nondestructive Examination VT-2 Incorporated by reference |
ML20212A147 | 13 September 1999 | Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established | |
ML20211N051 | 3 September 1999 | SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis | Severe Accident Management Guideline Exemption Request Fuel cladding |
L-99-139, LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | 2 September 1999 | LER 99-S01-00:on 990813,uncompensated Loss of Ability to Detect within Single Intrusion Security Detection Zone Occurred.Caused by Procedure non-compliance.Involved Personnel Received Counseling Re Event.With | |
ML20212A587 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With | |
ML20216E703 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Monticello Nuclear Generating Plant.With | |
L-99-140, Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Bvps,Units 1 & 2. with | |
ML20212C450 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for LaSalle County Station,Units 1 & 2.With | Coast down |
ML20211Q820 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with | |
ML20212D043 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 | |
ML20211D550 | 23 August 1999 | Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively | Offsite Dose Calculation Manual |
ML20211H862 | 23 August 1999 | Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval | Coatings |
ML20212H631 | 19 August 1999 | Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 | Unanalyzed Condition |
ML20210P473 | 11 August 1999 | COLR Cycle 10 Songs,Unit 2 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20210P479 | 11 August 1999 | COLR Cycle 10 Songs,Unit 3 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20210P944 | 10 August 1999 | Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers | Safe Shutdown Earthquake Stress corrosion cracking |
ML20210P918 | 10 August 1999 | Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part | Coatings Nondestructive Examination VT-2 Moisture barrier |
ML20210N234 | 5 August 1999 | SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 | Safe Shutdown Safe Shutdown Earthquake Design basis earthquake Earthquake Manual Operator Action |
ML20210Q052 | 4 August 1999 | Safety Evaluation Approving Relief Request 10 to License DPR-22 Per 10CFR50.55a(g)(6)(i).Inservice Exam for Relief Request 10,Parts A,B,C,D & E Impractical & Reasonable Assurance of Structural Integrity Provided | Boric Acid Hydrostatic Incorporated by reference |
ML20210N764 | 31 July 1999 | Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with | |
ML20210Q661 | 31 July 1999 | Monthly Operating Rept for July 1999 for Monticello Nuclear Generating Plant.With | |
L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With | Zebra Mussel |
ML20210R067 | 31 July 1999 | Monthly Operating Repts for July 1999 for LaSalle County Station,Units 1 & 2.With | Zebra Mussel Downpower |
ML20210Q652 | 31 July 1999 | Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 | |
ML20210R119 | 31 July 1999 | Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 | |
ML20210L277 | 30 July 1999 | SONGS Unit 3 ISI Summary Rept 2nd Interval,2nd Period Cycle 10 Refueling Outage U3C10 Site Technical Services | Nondestructive Examination VT-2 Liquid penetrant |
ML20210C168 | 9 July 1999 | Seventh Refueling Outage ASME Section XI Summary Rept | Packing leak Hydrostatic VT-2 |
ML20209H150 | 30 June 1999 | Monthly Operating Repts for June 1999 for LaSalle County Station,Units 1 & 2.With | Zebra Mussel Downpower Coast down |
ML20211G681 | 30 June 1999 | Pulstar Reactor Annual Rept to Us NRC for Jul 1998 - June 1999. with | |
ML20209C928 | 30 June 1999 | Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with | |
ML20209H112 | 30 June 1999 | Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with | |
ML20209F790 | 30 June 1999 | Monthly Operating Rept for June 1999 for Monticello Nuclear Generating Plant.With | |
L-99-107, Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with | 30 June 1999 | Monthly Operating Repts for June 1999 for Bvps,Units 1 & 2. with | |
ML20210R131 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 | |
BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with | 30 June 1999 | Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with | |
ML20209D953 | 27 June 1999 | Inservice Insp Ninety-Day Rept Bvps,Unit 2 Outage 7,Year 1999 | Boric Acid Hydrostatic Nondestructive Examination VT-2 |
ML20195D306 | 2 June 1999 | Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept Acceptable | Shutdown Margin Job Performance Measure |
ML20195H549 | 31 May 1999 | Monthly Operating Rept for May 1999 for Songs,Units 2 & 3 |