Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211P287 | 9 September 1999 | Proposed Tech Specs Pages,Increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal | Reactor Vessel Water Level Feedwater Controller Failure Fuel cladding |
ML20216E463 | 9 September 1999 | Proposed Tech Specs Change Eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula,Since Corbicula & Zebra Mussels Have Already Been Identified & Control & Treatment Plans Are Implemented | Zebra Mussel Biofouling |
ML20216E479 | 9 September 1999 | Proposed Tech Specs Revising Allowable Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons | High Radiation Area Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Recently irradiated fuel |
ML20210M785 | 4 August 1999 | Proposed Tech Specs 3.9.1,incorporating Addl Option Into Required Actions When Refueling Interlocks Are Inoperable | |
ML20196A202 | 17 June 1999 | Proposed Tech Specs SRs Implementing 24-month Operating Cycle at Pnpp | High Radiation Area Stroke time Hydrostatic Scram Discharge Volume Recently irradiated fuel Offsite Circuit |
ML20204E497 | 15 March 1999 | Proposed Tech Specs,Correcting Typos Found in Table 3.3.6.1-1 | |
ML20207K104 | 4 March 1999 | Proposed Tech Specs Improving Licensing & Design Basis for Isolation of FW Penetrations | Stroke time Hydrostatic Operator Manual Action |
ML20206Q357 | 6 January 1999 | Proposed Tech Specs Improving Licensing & Design Basis for Isolation of Feedwater Penetrations | Safe Shutdown Offsite Dose Calculation Manual Fire Barrier Stroke time Hydrostatic Operator Manual Action Emergency Lighting Exemption Request Earthquake Power Operated Valves |
ML20155D943 | 27 October 1998 | Proposed Tech Specs 2.1.1.2,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by GE | Safe Shutdown Reactor Vessel Water Level Fire Protection Program |
ML20155D824 | 27 October 1998 | Proposed Tech Specs Adding Two Paragraphs to TS 5.2.2.e, Organization - Unit Staff | |
ML20151V483 | 9 September 1998 | Proposed Tech Specs Stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Check Valves Do Not Need to Be Included in Hydrostatic Program | Hydrostatic Operator Manual Action Earthquake Power Operated Valves |
ML20151V111 | 3 September 1998 | Proposed Tech Specs Permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allowing Performance of EDG 24-hour TS SR Test in Modes 1 & 2 | Preplanned Activity Offsite Circuit |
ML20151V686 | 3 September 1998 | Proposed Tech Specs Increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Volume Due to Vortex Formation at Eductor Nozzles Located in Fuel Oil Storage Tank | |
ML20151S956 | 31 August 1998 | Proposed Tech Specs,Allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable | High Radiation Area Emergency Lighting |
ML20236T791 | 22 July 1998 | Proposed Tech Specs Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys | Fuel cladding |
ML20151P192 | 13 July 1998 | Proposed Tech Specs,Increasing Present +/- 1% Tolerance on Safety Mode Lift Setpoint for SRVs to +/- 3% | |
ML20236H841 | 30 June 1998 | Proposed Tech Specs,Increasing Boron Concentration in Standby Liquid Control Sys for Pnpp Cycle 8 Fuel Design & Providing Margin for Future Cycles as Required | Squib |
ML20216H936 | 14 April 1998 | Rev 1 to Proposed TS Bases,Reflecting Changes Made Since Original Implementation of TS in Improved Format in June 1996 | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Stroke time Anticipated operational occurrence Hydrostatic Squib Qualified Offsite Circuit Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure Battery sizing Overtravel Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change |
ML20197F787 | 23 December 1997 | Proposed Tech Specs,Revising 3.8.1 Re AC Sources to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs | Locked High Radiation Area Process Control Program Offsite Circuit |
ML20217K650 | 22 October 1997 | Proposed Tech Specs Incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchanger | |
ML20217F591 | 2 October 1997 | Proposed Tech Specs,Adding Note to TS 2.1.1.2 Re MCPR SL Values & Adding Footnote to TS 5.6.5.b to Reference NRC SER That Approved MCPR SL Values for Cycle 7 | Safe Shutdown Reactor Vessel Water Level Fire Protection Program |
ML20210T963 | 8 September 1997 | Proposed Tech Specs 5.2.2.e,removing Reference to NRC Policy Statement on Working Hours.Rev Allows Changes to Specific Overtime Limits & Working Hours to Be Evaluated IAW 10CFR50.59, Changes,Tests & Experiments | |
ML20217Q459 | 28 August 1997 | Proposed Tech Specs 3.4.11,revising Pressure-Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 | |
ML20148A659 | 2 May 1997 | Proposed Tech Specs,Revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys | |
ML20148A687 | 2 May 1997 | Proposed Tech Specs Re Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria | |
ML20137S776 | 9 April 1997 | Proposed TS Requirements 3.9.1.1 & 3.9.2.2 Re Frequency on Refueling Equipment & one-rod-out Interlocks | |
ML20134D825 | 31 January 1997 | Proposed Tech Specs 1.1 Re definitions,3.6.1.1 Re Primary Containment - operating,3.6.1.2 Re Primary Containment Air locks,3.6.1.3 Re PCIVs,3.6.5.1 Re Drywell & 5.5 Re Programs & Manuals | High Radiation Area Stroke time Hydrostatic Recently irradiated fuel |
ML20134D875 | 24 October 1996 | Proposed Tech Specs 2.1.1.2,safety Limits Applying Conservatism by Increasing MCPR Safety Limit Values | Reactor Vessel Water Level |
ML20117E789 | 27 August 1996 | Proposed Tech Specs,Revising Mls Leakage Requirements & Eliminating MSIV Control Sys | Grab sample |
ML20108A258 | 26 April 1996 | Proposed Improved Tech Specs | Shutdown Margin High Radiation Area Post Accident Monitoring Hydrostatic Scram Discharge Volume |
ML20100N950 | 1 March 1996 | Proposed TS Pages Re Drywell Leak Rate Testing Requirements | |
ML20100L333 | 27 February 1996 | Proposed Tech Specs Re Drywell Personnel Air Lock Shield Door Analyses | |
ML20100J597 | 24 February 1996 | Proposed Tech Specs,Revising Definition of Core Alteration | |
ML20149K222 | 17 February 1996 | Proposed Tech Specs,Reflecting Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 | |
ML20096D465 | 16 January 1996 | Proposed TS Requirements for Drywell Leak Rate Testing | High Radiation Area Stroke time |
ML20096C059 | 10 January 1996 | Proposed Tech Specs,Requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 | Scram Discharge Volume |
ML20095H472 | 20 December 1995 | Proposed Tech Specs Re Replacement of Selected Analog Leak Detection Sys Instruments W/Ge Numac Leak Detection Monitor | Reactor Vessel Water Level Process Control Program Fuel cladding Pressure Boundary Leakage |
ML20094E675 | 2 November 1995 | Proposed Tech Spec,Requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operation | |
ML20094F205 | 2 November 1995 | Proposed Tech Specs for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Performing Core Alterations | |
ML20091R191 | 29 August 1995 | Proposed Tech Specs,Incorporating New Instrumentation Trip Setpoints & Allowable Values | Reactor Vessel Water Level |
ML20086C728 | 30 June 1995 | Proposed Tech Specs Re Surveillance Test Interval Extension Request | Reactor Vessel Water Level |
ML20084U078 | 9 June 1995 | Proposed Tech Specs Reflecting one-time Extension of Performance Intervals of Certain SRs | Reactor Vessel Water Level Hydrostatic |
ML20084Q535 | 1 June 1995 | Proposed Tech Specs for Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnnp Improved TS LAR | Shutdown Margin Scram Discharge Volume |
ML20083Q199 | 18 May 1995 | Proposed Tech Specs for Conversion to TS Based on NUREG-1434, Improved BWR6 Ts | Reactor Vessel Water Level High Radiation Area Offsite Dose Calculation Manual Process Control Program Pressure Boundary Leakage |
ML20083A684 | 5 May 1995 | Proposed Tech Specs Re Changes to App a TSs | Safe Shutdown Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Stroke time Anticipated operational occurrence Hydrostatic Qualified Offsite Circuit Feedwater Controller Failure Fuel cladding Pressure Boundary Leakage Offsite Circuit |
ML20087H891 | 1 May 1995 | Proposed Tech Specs Re Incorporation of Results of Work Performed by BWROG | Reactor Vessel Water Level Packing leak Process Control Program Fuel cladding Pressure Boundary Leakage |
ML20087H941 | 28 April 1995 | Proposed Tech Specs Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & in Attachment 2 to Operating License | Liquid penetrant |
ML20087H931 | 28 April 1995 | Proposed Tech Specs,Proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS | |
ML20082C268 | 3 April 1995 | Proposed Tech Specs,Adding New Programmatic Requirements Governing Radiological Effluents & Relocating Procedural Details of RETS to ODCM or PCP | |
ML20081K319 | 24 March 1995 | Proposed Tech Specs Re one-time Extension of Performance Intervals for Certain TS Surveillance Requirements |