Issue date | Title | Topic | |
---|---|---|---|
PNO-I-99-045, on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill | 24 September 1999 | PNO-I-99-045:on 990923,operators at Limerick Generating Station Declared Unusual Event Due to Presence of Toxic Gases within Site Boundary.No Toxic Gases Were Detected within Main Cr.No Personnel Were Injured or Made Ill | |
PNO-I-99-019, on 990420,Limerick Unit 1 Automatically Shutdown from 100% Power on Low Rwl Due to Loss of Mfw. Normal Feedwater Sys Has Been Restored,Which Allowed for Securing of RCIC & HPCI Systems.Licensee Issued Pr | 21 April 1999 | PNO-I-99-019:on 990420,Limerick Unit 1 Automatically Shutdown from 100% Power on Low Rwl Due to Loss of Mfw. Normal Feedwater Sys Has Been Restored,Which Allowed for Securing of RCIC & HPCI Systems.Licensee Issued Pr | Reactor Vessel Water Level |
PNO-I-98-019, on 980603,operators Found One of Three Standby Liquid Injection Pumps Running & Injecting Into Reactor Vessel.No Alarms Identified on Redundant Reactivity Control Sys Which Provides Automatic SLC Initiation Feature | 4 June 1998 | PNO-I-98-019:on 980603,operators Found One of Three Standby Liquid Injection Pumps Running & Injecting Into Reactor Vessel.No Alarms Identified on Redundant Reactivity Control Sys Which Provides Automatic SLC Initiation Feature | |
PNO-I-98-013, on 980417,alert Declared After Detection by Smell of Unidentified Odor,Initially Believed to Be Acetylene or Propane Gas,Resulting in Evacuation of Area. Fire Brigade Activated | 17 April 1998 | PNO-I-98-013:on 980417,alert Declared After Detection by Smell of Unidentified Odor,Initially Believed to Be Acetylene or Propane Gas,Resulting in Evacuation of Area. Fire Brigade Activated | |
PNO-I-96-087, on 961206,reactor Was Manually Scramed Due to EHC Oil Leak at Turbine Control Valve 2.Licensee Implemented One Wk Maint Outage to Repair EHC Pressure Switch & Several Other Balance of Plant & Drywell Items | 10 December 1996 | PNO-I-96-087:on 961206,reactor Was Manually Scramed Due to EHC Oil Leak at Turbine Control Valve 2.Licensee Implemented One Wk Maint Outage to Repair EHC Pressure Switch & Several Other Balance of Plant & Drywell Items | |
ML20247N007 | 11 September 1989 | PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom | |
PNO-I-88-088, on 880825,FBI Confiscated Licensed Reactor Operator Vehicle Due to Alleged Drug Distribution.Operator Unescorted Access Withdrawn & Resident Inspector Informed. Region I Prepared to Respond to Media Inquiries | 25 August 1988 | PNO-I-88-088:on 880825,FBI Confiscated Licensed Reactor Operator Vehicle Due to Alleged Drug Distribution.Operator Unescorted Access Withdrawn & Resident Inspector Informed. Region I Prepared to Respond to Media Inquiries | |
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | 16 February 1988 | PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom | |
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | 2 February 1988 | PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named | |
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | 4 January 1988 | PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure | |
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | 9 October 1987 | PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted | |
ML20236M671 | 5 August 1987 | PNS-I-87-012:on 870803,unlicensed Operator Found Indicating Lamp Lenses Changed on Uninterruptible Power Supplies in Vital Area of Plant.Lenses on Auxiliary Switchgear Panel Also Found Changed & Lens Missing.Licensee Investigating | |
ML20235U662 | 16 July 1987 | PNS-I-87-011:on 870715,two Former Yoh Security,Inc Employees Indicted in Sept 1986 & Convicted in Apr 1987 for Falsifying Training Records for Security Force.Rept Issued as Followup to PNS-I-86-015 & PNS-I-87-004 | |
ML20235G654 | 6 July 1987 | PNS-I-87-009:on 870703,plant Security Personnel Detected Loaded Handgun & Spare Ammo Clip in Gym Bag of Contract Boilermaker.Individual,Gun & Ammo Turned Over to Local Police.Site Access Terminated.Commonwealth of PA Notified | |
ML20204F146 | 20 March 1987 | PNS-I-87-004:on 870320,YOH Security,Inc Pleaded Guilty to Federal Charges of Conspiracy,False Statements & Coverup by Former Employees Re Training Records for Security Force at Facility & Agreed to Pay Imposed Fine | |
PNO-I-87-005, on 870127,normal Reactor Shutdown Begun Due to Increasing Unidentified RCS Leakage in Drywell.Leakage Increased from 2.5 Gpm on 870123 to 4.7 Gpm on 870126.Seven Valves Backseated in Unsuccesful Attempt to Reduce Leakage | 27 January 1987 | PNO-I-87-005:on 870127,normal Reactor Shutdown Begun Due to Increasing Unidentified RCS Leakage in Drywell.Leakage Increased from 2.5 Gpm on 870123 to 4.7 Gpm on 870126.Seven Valves Backseated in Unsuccesful Attempt to Reduce Leakage | |
ML20212B243 | 23 December 1986 | PNS-I-86-025:on 861222,bomb Threat Received by Site Telephone Switchboard Operator.Bomb Threat Procedure Initiated & Unusual Event Declared.No Bomb Found & Unusual Event Terminated | |
ML20203N864 | 10 October 1986 | PNS-I-86-018:on 861010,licensee Received Notification from Police of Threat Against Plant Security Measures Implemented.Threat Not Credible But Investigator Will Interview Convenience Store Attendant Making Rept | |
ML20214S015 | 25 September 1986 | PNS-I-86-015:on 860925,US Atty for Eastern District of State of PA Announced That Federal Grand Jury Returned Indictments Charging Yoh Security,Inc W/Conspiracy,False Statements & Coverup Re Training Records for Security Force | |
ML20211Q784 | 23 July 1986 | PNS-I-86-012:on 860604,two Employees from Subcontractor Portuguese Star Granted Unescorted Access to Protected Area Before Full Criminal Background Screening Received.Both Employees Had Criminal Backgrounds.Investigations Falsified | |
ML20203C689 | 15 July 1986 | PNS-I-86-011:on 860715,telephone Bomb Threat Received from Female Caller.Unusual Event Declared & NRC Notified.Search of Vital Areas Conducted.Threat Declared Not Credible | |
PNO-I-86-048, on 860704,unscheduled Reactor Shutdown Occurred Due to Increasing Unidentified Drywell Leakage.Caused by Packing Leak on Manual LPCI Injection Valve.Manual Valve Backseated.Startup Planned for 860711 | 7 July 1986 | PNO-I-86-048:on 860704,unscheduled Reactor Shutdown Occurred Due to Increasing Unidentified Drywell Leakage.Caused by Packing Leak on Manual LPCI Injection Valve.Manual Valve Backseated.Startup Planned for 860711 | Packing leak |
PNO-I-86-011, on 860201,plant Placed in Commercial Operation. Plant Operating at 99.5% Power.Util Received License to Load Fuel & Conduct Low Power Testing on 841026 & full-power License on 850808 | 3 February 1986 | PNO-I-86-011:on 860201,plant Placed in Commercial Operation. Plant Operating at 99.5% Power.Util Received License to Load Fuel & Conduct Low Power Testing on 841026 & full-power License on 850808 | |
PNO-I-85-092, on 851205,PUC of State of PA Voted 3.2 Billion Dollar Cost Cap.Unit About 30% Complete.Restart of Const Planned in Jan 1986 Pending Board of Directors Approval.Fuel Load Planned for Early 1990 | 6 December 1985 | PNO-I-85-092:on 851205,PUC of State of PA Voted 3.2 Billion Dollar Cost Cap.Unit About 30% Complete.Restart of Const Planned in Jan 1986 Pending Board of Directors Approval.Fuel Load Planned for Early 1990 | |
ML20137H429 | 25 November 1985 | PNS-I-85-016:on 851123,during Reactor Shutdown,Bomb Threat Received from Unidentified Male by Telephone.Bomb Search Initiated.Event Terminated When No Bomb Found | |
PNO-I-82-049, on 820630,smoke in Control Bldg Traced to Fire in Two nonsafety-related Cable Trays Just Outside Switchgear Room.Cables Appear to Be Cut as Well as Burned. Damage Limited to Two Cable Trays.Local Police Notified | 2 July 1982 | PNO-I-82-049:on 820630,smoke in Control Bldg Traced to Fire in Two nonsafety-related Cable Trays Just Outside Switchgear Room.Cables Appear to Be Cut as Well as Burned. Damage Limited to Two Cable Trays.Local Police Notified | |
ML20236J764 | 26 August 1976 | PNS-76-045:on 760825,Bechtel Telephone Operator Received Bomb Threat for Limerick.Threat Reported to PECO Project Manager.Bechtel Contract Security Force Was Alerted.No Further Action Taken.Fbi Notified | |
ML20236X095 | 24 November 1975 | PN-75-135:on 751122,construction Fire Involving Wooden Scaffolding & Electrical Cable Insulations Occurred.Local Fire Department Responded But Not Used.Local Newspaper Carried Story.Press Release Not Planned | Scaffolding |