Issue date | Title | Topic | |
---|---|---|---|
ML20246N510 | 10 July 1989 | Advises That 890719 & 0630 Rev 2 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable | |
IR 05000097/1989001 | 12 May 1989 | Forwards Safety Insp Repts 50-097/89-01 & 50-157/89-01 on 890425-26.Weakness Identified in Area of Documentation | |
ML20206E609 | 14 November 1988 | Advises That Pages in Insp Repts 50-072/86-01,50-407/86-01, 50-072/88-01 & 50-407/88-01 Reclassified as Proprietary | |
ML20206E246 | 14 November 1988 | Forwards Insp Repts 50-072/88-03 & 50-407/88-03 on 881005-06.No Violations or Deviations Noted.Triga Reactor Restart Aspects Communicated Via Separate Correspondence | |
IR 05000072/1988001 | 28 October 1988 | Ack Receipt of 880804 & 25 Ltrs Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Repts 50-072/88-01 & 50-407/88-01 & Order.Concludes That W/ Exception of Violation 5.c,violations Did Not Occur | |
IR 05000072/1988003 | 28 October 1988 | Ack Receipt of 880906 & 27 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-072/88-03 & 50-407/88-03.Licensee Authorized to Resume Operation of Triga Reactor | |
ML20195D853 | 28 October 1988 | Ack Receipt of 880906 & 27 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-072/88-03 & 50-407/88-03.Licensee Authorized to Resume Operation of Triga Reactor | |
ML20195D858 | 27 September 1988 | Informs of 881005-06 Plan to Visit Facility to Review Corrective Actions Re Restart of Triga Reactor.Permission to Operate Could Be Granted by 881007 If No Problems Noted | |
ML20151U290 | 25 April 1988 | Forwards Summary of Enforcement Conference on 880328 in Region IV Ofc Re Violations Noted in Insp Rept 50-072/88-01 | |
ML20148E265 | 22 March 1988 | Forwards Special Team Insp Repts 50-072/88-01 & 50-407/88-01 on 880216-19.Violations Noted | |
ML20147D042 | 29 February 1988 | Requests That Recipient Resubmit Proposal to Convert to Low Enriched U Fuel to Meet 10CFR50.64(6)(2) or (3) Requirements by 880327.Identical Ltrs Sent to Listed Dockets | |
ML20236M792 | 10 November 1987 | Forwards Insp Repts 50-072/87-01 & 50-407/87-01 on 871008-09.No Violations or Deviations Noted | |
ML20236F922 | 26 October 1987 | Informs That,Effective 871025,JL Pellet Will Replace R Cooley as Section Chief of Operator Licensing Section in Div of Reactor Safety | |
ML20215J696 | 4 May 1987 | Confirms Arrangements Made for Reactor Operator & Senior Reactor Operator Licensing Exams During Wk of 870622. Facility Mgt Responsible for Providing Adequate Space & Facilities to Properly Conduct Exams.List of Ref Matls Encl | |
ML20206C606 | 8 April 1987 | Ack Receipt of & Payment of $3,000 for Civil Penalty Imposed on 870313.Corrective Actions Described in Will Be Examined During Future Insps | |
ML20207R515 | 13 March 1987 | Forwards Order Imposing Civil Monetary Penalties in Amount of $3,000 Based on Violations Identified During 860609-12 Insp | |
ML20212P185 | 11 March 1987 | Responds to 870309 10CFR2.206 Petition for Commission Review of Director'S Decision DD-87-2.Time Period for Commission Review Expired & Decision Became Final Agency Action on 870310.Served on 870312 | |
ML20212A806 | 24 February 1987 | Informs That 861006 Notice of Violation from Insp Repts 50-072/86-01 & 50-407/86-01 Submitted w/ Incorrectly Labeled as Safeguards Info.Safeguards Info Notations Should Be Marked Out | |
ML20215D607 | 6 October 1986 | Discusses Insp on 860609-12 & Forwards Notices of Deviation & Violation & Proposed Imposition of Civil Penalty.W/O App B (Ref 10CFR73.21) | |
ML20212K197 | 13 August 1986 | Forwards Summary of 860721 Enforcement Conference Re Deviations & Violations Identified in Insp Repts 50-072/86-01 & 50-407/86-01 | |
ML20203A930 | 14 July 1986 | Forwards Insp Repts 50-072/86-01 & 50-407/86-01 on 860609- 12.Violations & Deviations Will Be Discussed During 860721 Enforcement Conference in Salt Lake City,Ut.App Withheld (Ref 10CFR73.21) | |
ML20203C468 | 14 July 1986 | Confirms Arrangements for 860721 Enforcement Conference at Univ Re Findings Identified in Insp Repts 50-072/86-01 & 50-407/86-01.Proposed Agenda Encl | |
ML20210H637 | 26 March 1986 | Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address | |
ML20136G379 | 18 November 1985 | Discusses Actions Re Claims of Alleged Inadequacies in Containment Leak Rate Tests Performed at LWR Plants.Matter Will Not Be Considered Further | |
ML20126E431 | 25 March 1985 | Responds to FOIA Request for Records Re FIN B-0489, Containment Leak Rate Testing Program & Quadrex Corp/Nrc Contracts.Forwards Documents Re FIN B-0489.Documents Also Available in Pdr.No Documents Re Quadrex Subj to Request | |
ML20128P309 | 4 December 1984 | Responds to 841126 & 27 Telcon Requests for Listed Info. Diagram of Mark II Containment Encl.S&W Will Forward Correct Diagram of Surry Containment.Experimental Data for Decay Heat Curve Does Not Exist.W/O Encl | Earthquake |
ML20128P269 | 20 November 1984 | Forwards Diagrams Illustrating Core Concrete Interaction, Based on Corcon Calculations for Facility.Concrete Consists of Limestone | |
ML20128P233 | 14 November 1984 | Forwards Microfiche of EPRI Mar 1980 Revised Rept NSAC-1, Analysis of TMI-2 Accident. Version Out of Print.W/O Encl | |
NUREG-0850, Forwards Vol 1 to NUREG-0850, Preliminary Assessment of Core Melt Accidents at Zion & Indian Point Nuclear Power Plants & Strategies for Mitigating Effects. Vol 1 Only Vol Available at Present | 14 August 1984 | Forwards Vol 1 to NUREG-0850, Preliminary Assessment of Core Melt Accidents at Zion & Indian Point Nuclear Power Plants & Strategies for Mitigating Effects. Vol 1 Only Vol Available at Present | |
ML20128N936 | 14 August 1984 | Forwards Vol 1 to NUREG-0850, Preliminary Assessment of Core Melt Accidents at Zion & Indian Point Nuclear Power Plants & Strategies for Mitigating Effects. Vol 1 Only Vol Available at Present | |
ML20128N385 | 31 May 1984 | Forwards NUREG/CR-3028, Review of Limerick Generating Station PRA & Vols 1 & 2 to NUREG/CR-0027, Proceedings of Intl Meeting on Thermal Nuclear Reactor Safety. Advises That NUREG/CR-3300 Not Published.W/O Encls | |
NUREG/CR-3028, Forwards NUREG/CR-3028, Review of Limerick Generating Station PRA & Vols 1 & 2 to NUREG/CR-0027, Proceedings of Intl Meeting on Thermal Nuclear Reactor Safety. Advises That NUREG/CR-3300 Not Published.W/O Encls | 31 May 1984 | Forwards NUREG/CR-3028, Review of Limerick Generating Station PRA & Vols 1 & 2 to NUREG/CR-0027, Proceedings of Intl Meeting on Thermal Nuclear Reactor Safety. Advises That NUREG/CR-3300 Not Published.W/O Encls | |
ML20210E676 | 23 March 1984 | Forwards Region V Evaluation of Emergency Preparedness Concerns Expressed in 831104,1209 & s Included in Latest Plant Sser | |
ML20128N200 | 18 March 1984 | Forwards Vols 1 & 2 to NUREG/CR-1250, TMI - Rogovin Rept | |
NUREG/CR-1250, Forwards Vols 1 & 2 to NUREG/CR-1250, TMI - Rogovin Rept | 18 March 1984 | Forwards Vols 1 & 2 to NUREG/CR-1250, TMI - Rogovin Rept | |
ML20210E689 | 30 December 1983 | Ack Providing Addl Data Re Concern About Method of Notifying Population in Case of Flood.Siren Concern Being Addressed.Fema Ltr Addressing Items Identified in Initial Encl | |
ML20128M700 | 1 November 1983 | Forwards Draft Vols I-III to BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M774 | 12 September 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M760 | 12 September 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M731 | 12 September 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M795 | 9 September 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M819 | 12 August 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
ML20128M798 | 12 August 1983 | Forwards Draft Vols I-III of BMI-2104 Re Ongoing Source Term Reassessment Study.W/O Encls | |
IR 05000407/1982001 | 2 August 1982 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-407/82-01 | |
ML20054L388 | 16 June 1982 | Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl | |
ML20148U202 | 17 February 1981 | Forwards Revised NRC Region 4 Organization Chart,Effective 810227 | |
ML20137G472 | 23 June 1971 | Advises That Presence & Irradiation of Explosives in Reactor Must Be Evaluated Due to Potential for Damage to Reactor. Evaluation Requested Establishing Operating Restrictions,Max Quantity of Explosives Allowed in Facility & Form | |
ML20235C920 | 28 August 1968 | Requests Nm Newmark Consulting Engineering Svcs Provide Listed Svcs,Including Analyses of Engineering Factors Included in Proposed Design to Minimize Damage from Seismically Induced Ground Motion for Proposed Plant Const | |
ML20151W976 | 14 February 1967 | Requests Listed Svc for Commission Per Conditions of Contract AT(49-5)2667 Re Proposed Const of PWR by PG&E at Diablo Canyon Site,Including Rept on Analyses of Engineering Factors by 670415 | Safe Shutdown Earthquake |
ML20234D959 | 9 November 1964 | Forwards Repts Released Re Proposed Nuclear Power Plant at Bodega Head,Ca in Accordance W/Telcon.Util Has Withdrawn Application for CP on Project.W/O Encls |