IR 05000407/1982001
ML20062D572 | |
Person / Time | |
---|---|
Site: | University of Utah |
Issue date: | 08/02/1982 |
From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | Jacobs H UTAH, UNIV. OF, SALT LAKE CITY, UT |
Shared Package | |
ML20062D577 | List: |
References | |
NUDOCS 8208060147 | |
Download: ML20062D572 (1) | |
Similar Documents at University of Utah | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20211G5151999-08-24024 August 1999
[Table view]Informs NRC That Krahenbuhl Will Be Appointed Reactor Supervisor for 100 Kw Triga Nuclear Reactor (License R-126), Effective 990824 ML20197J3201998-12-0303 December 1998 Forwards Amend 7 to License R-126 & Safety Evaluation.Amend Provides Clarifications to TSs in Response to Submittal of 981102 ML20236R7301998-07-16016 July 1998 Forwards Insp Rept 50-407/98-202 on 980622-24.No Violations Noted.Aspects of Safeguards & Security Program Were Inspected ML20248M2491998-06-11011 June 1998 Forwards Insp Rept 50-407/98-201 on 980112-16.No Violations Noted.Two Change Requests Are Expected Following Evaluation & Recommendation to Reactor Safety Committee for Approval Re TS 4.3.3 & 5.4 ML20217P3051998-04-30030 April 1998 Forwards List of Triga Research Reactor Components Available for Acquisition.Location of Each Component,Provided ML20202F5151998-02-13013 February 1998 Requests 30-day Extension to Respond to Request for License Mod.Extension Is Needed Because Licensee Has Been Forced to Focus Resources on Other Tasks at Present Time ML20198N2151998-01-0909 January 1998 Informs of Continuance of Review of 971205 Requests for Amend of Univ of Utah Research Reactor Ts.Forwards Request for Addl Info Re Reactor ML20211B3991997-09-22022 September 1997 Submits Ltr as Replacement of 970826 Cover Ltr,Which Forwarded 1997 Annual Operating Rept.Previous Ltr Stated Incorrect Docket Number ML20117D9121996-05-0808 May 1996 Forwards Rev 3 to Reactor Operator Requalification Plan, Reflecting Editorial Changes ML20101L4501996-03-29029 March 1996 Forwards Revision 3,Reactor Operation Requalification Plan & Audit & Review Plan for University of Utah Center ML20107H0881996-03-29029 March 1996 Forwards Updated Rev 3 to Univ of Utah Ctr for Excellence in Nuclear Technology Engineering & Research Reactor Operation Requalification Plan ML20101L3571996-03-27027 March 1996 Forwards Rev 4 to Univ of UT Emergency Plan for Triga Nuclear Reactor ML20101M5911996-03-26026 March 1996 Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d)(1)) ML20084G6361995-05-11011 May 1995 Provides Notice of Mod in Position of Reactor Administrator at Univ of UT Triga Research Reactor ML20065L7821994-04-0707 April 1994 Informs of Changes in Facility Administrative Personnel in Operation & Maint of Nuclear Engineering Lab Triga Reactor ML20063M1901994-03-0101 March 1994 Forwards Rev 2 to Univ of Utah Nuclear Engineering Lab Reactor Operation Requalification Plan ML20067D2751994-02-25025 February 1994 Forwards Rev 5 to Physical Security Plan,In Accordance W/ 10CFR50.4(iv) & 10CFR50.54p(2).Rev Withheld (Ref 10CFR2.790(d)(1)) ML20064D4851994-02-25025 February 1994 Forwards Rev 3 to Utec Me 93-9, Univ of UT Nuclear Engineering Lab Emergency Plan ML20059H5261994-01-0303 January 1994 Informs That as of 931227,interval for Visual Insp of CRs for Deterioration Exceeded.Crs Inspected on 931229 & CRs Functioned Properly W/No Noticeable Wear or Deterioration of Matl ML20058P0961993-12-14014 December 1993 Discusses Initial Exam Rept 50-407/OL-93-01 Administered at Facility During Wk of 931025.W/0 Stated Encl ML20058J0521993-12-0101 December 1993 Forwards Results of Operator Initial Exam Conducted at Univ of Utah on 931026-28.W/o Encl ML20058G1951993-11-18018 November 1993 Forwards Rev 2 to Univ of UT Nuclear Engineering Lab Emergency Plan for Triga Nuclear Reactor. Changes in Revised Plan Eliminate Identified Weaknesses Stated in ML20056F9491993-08-24024 August 1993 Advises That 930719 Rev 4 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20056D9981993-07-30030 July 1993 Informs That Licensee 930623 Proposed Changes to Plant Emergency Plan Meets Requirements of 10CFR50,App E & Therefore Acceptable.Addl Info Requested Re Listed Issues ML20056F9581993-07-19019 July 1993 Forwards Rev 4 of Physical Security Plan,Reflecting Removal of Door 5 & Installation of Improved Locks & Lockguards on Outer Perimeter of Door 6.Rev Withheld,Per 10CFR2.790(d)(1) ML20046A1211993-07-19019 July 1993 Forwards Changes to Physical Security Plan Dtd 930715, Reflecting Removal of Door 5.Since Door within Defined Caa,Security Effectiveness Remains the Same.Encls Withheld (Ref 10CFR2.790(d)(1)) ML20045H5531993-07-0808 July 1993 Advises That Senior Operator License SOP-43333 for T Gasauge Terminated Due to Other Obligations & Academic Pursuits. Requests Termination of License,Effective 930720 ML20045H5621993-07-0606 July 1993 Advises of Changes in Facility Administrative Personnel in Operation & Maint of Triga Nuclear Reator.Dm Slaughter Will Assume Responsibilities of Director of Nuclear Engineering Lab,Beginning on 930701 ML20115C6291992-09-28028 September 1992 Extends Appreciation for NRC Assistance in Updating & Upgrading Nuclear Engineering Program & Future Reactor Operations.In Upcoming Months,License Will Be Changed to Eliminate Doctor of Philosophy Requirement ML20118A6811992-09-18018 September 1992 Informs Changes in Facility Administrative Personnel & Membership of Reactor Safety Committee Which Oversees Operation & Maint of Nuclear Engineering Lab Triga (License R-126) Nuclear Reactor ML20104A5831992-08-13013 August 1992 Requests Changes in Personnel That Should Receive Carbon Copies of Official Correspondence from Nrc.Dm Slaughter Should Be Added to List & Kl Devries Omitted.Dm Slaughter Address Listed ML20104B4291992-08-12012 August 1992 Clarifies Distribution List for Correspondence from Nrc. Requests That Future Written NRC Communication Be Addressed to Dk Gemlich at Listed Address & Copy Sent to Ofc of Vice President for Research at Listed Address ML20210E2131992-06-12012 June 1992 Forwards Exam Rept 50-407/OL-91-01 of Exam Administered During Wk of 911209 ML20101F9761992-05-20020 May 1992 Forwards Revised Tech Specs Re Visual Insp of Fuel Elements for Damage or Deterioration ML20092L5071992-02-19019 February 1992 Forwards Rev 3 to Physical Security Plan for Protection of SNM of Low Strategic Significance.Advises That Major Changes in Rev Reflect Fact That SNM for AGN-201M Training Reactor Has Been Shipped Offsite.Rev Withheld (Ref 10CFR2.790(d)) ML20083D4551991-09-20020 September 1991 Forwards Univ of Utah Triga Reactor Annual Operating Rept, Jul 1990-June 1991. Submittal of Rept Delayed to Allow Reactor Safety Committee to Review Rept in Light of Acquisition of Research Reactor from Univ of CA at Berkeley ML20082K1411991-08-23023 August 1991 Informs of Changes in Facility Administrative Personnel & Membership of Reactor Safety Committee.Kc Crawford Accepted Academic Position at Idaho State Univ & Resigned as Reactor Supervisor & Will Be Replaced by DM Slaughter ML20082K5171991-08-23023 August 1991 Informs of Changes in Facility Administrative Personnel & Membership of Reactor Safety Committee ML20077E5661991-06-0505 June 1991 Forwards Revised Reactor Operator Requalification Plan for Univ of Utah Triga Nuclear Reactor, in Response to NRC 910513 Request ML20024H1881991-05-0808 May 1991 Informs of Changes in Membership of Reactor Safety Committee Oversees Operation & Maint of Nuclear Engineering Lab Triga & AGN-201M.P Sheehan Will Replace VC Rogers Who Resigned Due to Conflicting Commitments ML20073M8711991-05-0808 May 1991 Lists Current Membership Roster of Reactor Safety Committee.P Sheehan Will Replace VC Rogers Who Resigned Due to Conflicting Commitments ML20073P1381991-05-0808 May 1991 Informs of Changes in Membership of Reactor Safety Committee Which Oversees Operation & Maint of Triga Reactors.P Sheehan Will Replace VC Rogers.Lists Current Membership Roster of Committee ML20073C1441991-04-10010 April 1991 Forwards Matls Which Support Upgrading of Triga Reactor Console at Univ of Utah ML20062G0411990-11-16016 November 1990 Forwards Insp Repts 50-072/90-01 & 50-407/90-01 on 900924- 28.Violations Noted But No Citation Being Issued.Open Items Also Noted ML20059N7311990-10-10010 October 1990 Forwards Revised Reactor Operator Requalification Plan for Univ of Utah Triga Nuclear Reactor. Major Structural Changes Include Replacing Implementation Section W/Appendix & New Section, Operator Reinstatement Added ML20056A6841990-07-25025 July 1990 Forwards Assuring Financial Responsibility to Provide Adequate Funds for Decommissioning Reactors ML20055H7381990-07-17017 July 1990 Submits Info Re Decommissioning Reactors,Per 10CFR50.33 & 50.75 & NRC Rule Entitled, General Requirements for Decommissioning Nuclear Facilities ML20246N5101989-07-10010 July 1989 Advises That 890719 & 0630 Rev 2 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246C4701989-06-30030 June 1989 Forwards Corrected Pages 10-12 to Rev 2 to Physical Security Plan,Correcting Typos.W/O Encl ML20206E2461988-11-14014 November 1988 Forwards Insp Repts 50-072/88-03 & 50-407/88-03 on 881005-06.No Violations or Deviations Noted.Triga Reactor Restart Aspects Communicated Via Separate Correspondence 1999-08-24 Category:NRC TO EDUCATIONAL INSTITUTION MONTHYEARML20246N5101989-07-10010 July 1989
[Table view]Advises That 890719 & 0630 Rev 2 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20206E2461988-11-14014 November 1988 Forwards Insp Repts 50-072/88-03 & 50-407/88-03 on 881005-06.No Violations or Deviations Noted.Triga Reactor Restart Aspects Communicated Via Separate Correspondence IR 05000072/19880011988-10-28028 October 1988 Ack Receipt of 880804 & 25 Ltrs Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Repts 50-072/88-01 & 50-407/88-01 & Order.Concludes That W/ Exception of Violation 5.c,violations Did Not Occur IR 05000072/19880031988-10-28028 October 1988 Ack Receipt of 880906 & 27 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-072/88-03 & 50-407/88-03.Licensee Authorized to Resume Operation of Triga Reactor ML20195D8531988-10-28028 October 1988 Ack Receipt of 880906 & 27 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-072/88-03 & 50-407/88-03.Licensee Authorized to Resume Operation of Triga Reactor ML20195D8581988-09-27027 September 1988 Informs of 881005-06 Plan to Visit Facility to Review Corrective Actions Re Restart of Triga Reactor.Permission to Operate Could Be Granted by 881007 If No Problems Noted ML20151U2901988-04-25025 April 1988 Forwards Summary of Enforcement Conference on 880328 in Region IV Ofc Re Violations Noted in Insp Rept 50-072/88-01 ML20148E2651988-03-22022 March 1988 Forwards Special Team Insp Repts 50-072/88-01 & 50-407/88-01 on 880216-19.Violations Noted ML20236M7921987-11-10010 November 1987 Forwards Insp Repts 50-072/87-01 & 50-407/87-01 on 871008-09.No Violations or Deviations Noted ML20236F9221987-10-26026 October 1987 Informs That,Effective 871025,JL Pellet Will Replace R Cooley as Section Chief of Operator Licensing Section in Div of Reactor Safety ML20215J6961987-05-0404 May 1987 Confirms Arrangements Made for Reactor Operator & Senior Reactor Operator Licensing Exams During Wk of 870622. Facility Mgt Responsible for Providing Adequate Space & Facilities to Properly Conduct Exams.List of Ref Matls Encl ML20206C6061987-04-0808 April 1987 Ack Receipt of & Payment of $3,000 for Civil Penalty Imposed on 870313.Corrective Actions Described in Will Be Examined During Future Insps ML20207R5151987-03-13013 March 1987 Forwards Order Imposing Civil Monetary Penalties in Amount of $3,000 Based on Violations Identified During 860609-12 Insp ML20212A8061987-02-24024 February 1987 Informs That 861006 Notice of Violation from Insp Repts 50-072/86-01 & 50-407/86-01 Submitted w/ Incorrectly Labeled as Safeguards Info.Safeguards Info Notations Should Be Marked Out ML20215D6071986-10-0606 October 1986 Discusses Insp on 860609-12 & Forwards Notices of Deviation & Violation & Proposed Imposition of Civil Penalty.W/O App B (Ref 10CFR73.21) ML20212K1971986-08-13013 August 1986 Forwards Summary of 860721 Enforcement Conference Re Deviations & Violations Identified in Insp Repts 50-072/86-01 & 50-407/86-01 ML20203A9301986-07-14014 July 1986 Forwards Insp Repts 50-072/86-01 & 50-407/86-01 on 860609- 12.Violations & Deviations Will Be Discussed During 860721 Enforcement Conference in Salt Lake City,Ut.App Withheld (Ref 10CFR73.21) ML20203C4681986-07-14014 July 1986 Confirms Arrangements for 860721 Enforcement Conference at Univ Re Findings Identified in Insp Repts 50-072/86-01 & 50-407/86-01.Proposed Agenda Encl ML20210H6371986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address IR 05000407/19820011982-08-0202 August 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-407/82-01 ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20148U2021981-02-17017 February 1981 Forwards Revised NRC Region 4 Organization Chart,Effective 810227 1989-07-10 Category:OUTGOING CORRESPONDENCE MONTHYEARML20197J3201998-12-0303 December 1998
[Table view]Forwards Amend 7 to License R-126 & Safety Evaluation.Amend Provides Clarifications to TSs in Response to Submittal of 981102 ML20236R7301998-07-16016 July 1998 Forwards Insp Rept 50-407/98-202 on 980622-24.No Violations Noted.Aspects of Safeguards & Security Program Were Inspected ML20248M2491998-06-11011 June 1998 Forwards Insp Rept 50-407/98-201 on 980112-16.No Violations Noted.Two Change Requests Are Expected Following Evaluation & Recommendation to Reactor Safety Committee for Approval Re TS 4.3.3 & 5.4 ML20198N2151998-01-0909 January 1998 Informs of Continuance of Review of 971205 Requests for Amend of Univ of Utah Research Reactor Ts.Forwards Request for Addl Info Re Reactor ML20058P0961993-12-14014 December 1993 Discusses Initial Exam Rept 50-407/OL-93-01 Administered at Facility During Wk of 931025.W/0 Stated Encl ML20058J0521993-12-0101 December 1993 Forwards Results of Operator Initial Exam Conducted at Univ of Utah on 931026-28.W/o Encl ML20056F9491993-08-24024 August 1993 Advises That 930719 Rev 4 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20056D9981993-07-30030 July 1993 Informs That Licensee 930623 Proposed Changes to Plant Emergency Plan Meets Requirements of 10CFR50,App E & Therefore Acceptable.Addl Info Requested Re Listed Issues ML20210E2131992-06-12012 June 1992 Forwards Exam Rept 50-407/OL-91-01 of Exam Administered During Wk of 911209 ML20062G0411990-11-16016 November 1990 Forwards Insp Repts 50-072/90-01 & 50-407/90-01 on 900924- 28.Violations Noted But No Citation Being Issued.Open Items Also Noted ML20246N5101989-07-10010 July 1989 Advises That 890719 & 0630 Rev 2 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20206E2461988-11-14014 November 1988 Forwards Insp Repts 50-072/88-03 & 50-407/88-03 on 881005-06.No Violations or Deviations Noted.Triga Reactor Restart Aspects Communicated Via Separate Correspondence IR 05000072/19880011988-10-28028 October 1988 Ack Receipt of 880804 & 25 Ltrs Informing NRC of Steps Taken to Correct Violations & Deviations Noted in Insp Repts 50-072/88-01 & 50-407/88-01 & Order.Concludes That W/ Exception of Violation 5.c,violations Did Not Occur ML20195D8531988-10-28028 October 1988 Ack Receipt of 880906 & 27 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-072/88-03 & 50-407/88-03.Licensee Authorized to Resume Operation of Triga Reactor IR 05000072/19880031988-10-28028 October 1988 Ack Receipt of 880906 & 27 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-072/88-03 & 50-407/88-03.Licensee Authorized to Resume Operation of Triga Reactor ML20195D8581988-09-27027 September 1988 Informs of 881005-06 Plan to Visit Facility to Review Corrective Actions Re Restart of Triga Reactor.Permission to Operate Could Be Granted by 881007 If No Problems Noted ML20151U2901988-04-25025 April 1988 Forwards Summary of Enforcement Conference on 880328 in Region IV Ofc Re Violations Noted in Insp Rept 50-072/88-01 ML20148E2651988-03-22022 March 1988 Forwards Special Team Insp Repts 50-072/88-01 & 50-407/88-01 on 880216-19.Violations Noted ML20150D9721988-03-18018 March 1988 Informs of NRC Relocation to Stated Address.Mailing Address Unchanged.A Adams Project Manager & TS Michaels back-up Project Manager ML20236M7921987-11-10010 November 1987 Forwards Insp Repts 50-072/87-01 & 50-407/87-01 on 871008-09.No Violations or Deviations Noted ML20236F9221987-10-26026 October 1987 Informs That,Effective 871025,JL Pellet Will Replace R Cooley as Section Chief of Operator Licensing Section in Div of Reactor Safety ML20215J6961987-05-0404 May 1987 Confirms Arrangements Made for Reactor Operator & Senior Reactor Operator Licensing Exams During Wk of 870622. Facility Mgt Responsible for Providing Adequate Space & Facilities to Properly Conduct Exams.List of Ref Matls Encl ML20206C6061987-04-0808 April 1987 Ack Receipt of & Payment of $3,000 for Civil Penalty Imposed on 870313.Corrective Actions Described in Will Be Examined During Future Insps ML20207R5151987-03-13013 March 1987 Forwards Order Imposing Civil Monetary Penalties in Amount of $3,000 Based on Violations Identified During 860609-12 Insp ML20212A8061987-02-24024 February 1987 Informs That 861006 Notice of Violation from Insp Repts 50-072/86-01 & 50-407/86-01 Submitted w/ Incorrectly Labeled as Safeguards Info.Safeguards Info Notations Should Be Marked Out ML20215D6071986-10-0606 October 1986 Discusses Insp on 860609-12 & Forwards Notices of Deviation & Violation & Proposed Imposition of Civil Penalty.W/O App B (Ref 10CFR73.21) ML20212K1971986-08-13013 August 1986 Forwards Summary of 860721 Enforcement Conference Re Deviations & Violations Identified in Insp Repts 50-072/86-01 & 50-407/86-01 ML20203A9301986-07-14014 July 1986 Forwards Insp Repts 50-072/86-01 & 50-407/86-01 on 860609- 12.Violations & Deviations Will Be Discussed During 860721 Enforcement Conference in Salt Lake City,Ut.App Withheld (Ref 10CFR73.21) ML20203C4681986-07-14014 July 1986 Confirms Arrangements for 860721 Enforcement Conference at Univ Re Findings Identified in Insp Repts 50-072/86-01 & 50-407/86-01.Proposed Agenda Encl ML20210H6371986-03-26026 March 1986 Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address IR 05000407/19820011982-08-0202 August 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-407/82-01 ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20148U2021981-02-17017 February 1981 Forwards Revised NRC Region 4 Organization Chart,Effective 810227 ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility 1998-07-16 |
Inspection Report - University of Utah - 1982001 | |
---|---|
Assessments
|
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
,,
,
August 2, 1982
.Dockat: 50-407/82-01 University of Utah ATTN: Dr. Harold R. Jacobs Reactor Administrator College of Engineering Salt Lake City, Utah 84112 Gentlemen:
Thank you for your letter of July 7,1982, in response to our letter, dated June ll,1982, and the attached Notice of Violation. We have reviewed your responso and still consider the matters reported in our Notice to be violations; however, the corrective actions, which you indicated in your letter, appear to be appropriate. We have no further questions at this time and we will review your corrective actions during a future inspectio
Sincerely,
" Original Signed ISR W. C. SEIDLE" W. C. Seidle, Chief Reactor Project Branch 2 cc:
University of Utah ATTH: Dr. G. M. Sandquist Reactor Supervisor College of Engineering Salt Lake City, Utah 84112 bcc to DMB: bec distrib. by RIV: [
BC NSIC J. Jaudon PM AE00 NTIS J. T. Collins, RA Enforcement Assistant
/V //
ELD IE FILE RIV File NRR/DHFS/0LB NRR/0SI/RAB 8208060147 820802 RES PDR ADOCK 05000407 PDR: liq , O PDR o"'cr > . .RPB DRRP.&E .D/.IES~l{f . ..
.R ' ,, . .
5"""^"'> .J.au on:Jc. .WCSeidl .... ..JGag .d o . .EJohnso . . . .. .
o 1, p 7/27/82
..
7/L1/82 ...
7/n/
. ...
' 3y 7 As./71/82r.9/yh . . . .. .. . - - - . -
,
Nac roaa 3'e i'o-so' ~ac u 0240 OFFICI A'L_ RECOR D' COPY