Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20207G5158 June 1999Summary of 990422 Meeting with Ue & NRC Staff Re Electrosleeved Repaired SG Tubes During Beyond Design Basis Accidents.List of Meeting Attendees,Nrc Staff Meeting Presentation Matls & Ue Meeting Presentation Matls EnclSevere Accident Management Guideline
ML20205J6596 April 1999Summary of 990318 Meeting with Union Electric & Framatome Technologies Re Electrosleeve Amend Application for Callaway Npp.List of Telcon Participants & Union Electric Fax with Callaway Probability Info Encl
ML20205J2292 April 1999Summary of 990325 Meeting with Westinghouse Owners Group in Rockville,Md Re NRC Staff Comments on WOG Post Accident Sampling Sys Approach (Topical Rept WCAP-14986,rev 1), Currently Under Staff Review.List of Attendees EnclGrab sample
IR 05000482/199720130 March 1999Summary of 990212 Meeting W/Util Re Proposed Change to Battery Tss,Per Insp Rept 50-482/97-201.List of Meeting Attendees,Slides & Vendor Ltr & List of Questions on ITS Section 3.8 Encl
ML20204H51516 March 1999Summary of 990224 Meeting with Wog,W,Wcnoc & NRC Staff in Rockville,Md Re NRC Comments on WOG Core Damage Assessment Guidance (WCAP-14696).Attendance List & Meeting Matls EnclGrab sample
Fuel cladding
ML20199G98720 January 1999Summary of 981014 & 15 Meetings with WCNOC & Ue Re Proposed TS Amend That Supports Mod to Increase Sfp.List of Attendees & Summary of Each Topic Discussed EnclSafe Shutdown Earthquake
Finite Element Analysis
Earthquake
ML20198M31129 December 1998Summary of 981203 Meeting with Wolf Creek Nuclear Operating Co Re Amend Application Requesting Approval to Increase SFP Capacity at Wolf Creek & Callaway Plants.List of Attendees & Licensee Presentation Matl Encl
ML20237A28311 August 1998Summary of 980806 Meeting W/Util Re Planned Suppl to Util 970806 Proposed Rev to Plant Emergency Plan.List of Attendees Encl
ML20236T28816 July 1998Summary of 980707 Meeting W/Util Re Proposed Amend to TS to Allow Installation of Electrosleeves in SG at Plant,Unit 1Earthquake
Pressure Boundary Leakage
ML20248H0551 June 1998Summary of 980513 Meeting W/Utils Re Proposed Amends to TSs to Support Planned Mods to Spent Fuel Pools at Plants
ML20217A02618 March 1998Summary of 980129 Meeting W/Util to Discuss Licensee Interpretation of Allowance to Perform TS Required Shutdown Surveillance Testing While at Power.Oversize Drawings EnclMissed surveillance
ML20198H56631 December 1997Summary of 971209 Meeting W/Union Electric & Framatome Technologies,Inc in Rockville,Md Re Electrosleeving Process in Support of Union Electric Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at PlantNondestructive Examination
ML20198G22122 December 1997Summary of 971120 Meeting W/Util in Rockville,Md,Re Electrosleeving Process in Support of UE-proposed TS Amend That Would Allow Electrosleeving of Steam Generator Tubes at Callaway Plant.List of Attendees Encl
ML20199F26919 November 1997Summary of 971008 & 09 Meetings W/Union Electric & Westinghouse Electric Corp to Discuss Effects of Axial Offset Anomaly Currently Being Experienced by Plant.List of Attendees & non-proprietary Versions of Handout Matls Encl
ML20217K83115 October 1997Summary of 970924 Meeting W/Wcnoc in Rockville,Md to Discuss Results of Evaluations & Proposed Actions in Response to GL 96-06, Assurance of Equipment Operability & Ci During DBA Conditions. Handout & Attendance List Encl
ML20217E04124 September 1997Summary of 970813 Meeting W/Une & Framatome Technologies Re Electrosleeving Process in Support of UNE-proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Meeting Handout Matl Encl
ML20149G32318 July 1997Summary of 970506 & 07 Meetings W/Listed Attendees in Toronto,Ontario,Canada to Discuss FTI SG Electrosleeving Process.Nonproprietary Version of Handout Matl Presented at Meeting EnclNondestructive Examination
ML20149H27517 July 1997Summary of 970513-15 Meeting W/Util in Lynchburg,Va Re Licensee Steam Generator Electrosleeving Process.Meeting Attendees & Meeting Slides Encl
ML20148P09625 June 1997Summary of 970603 Meeting W/Wcnoc Staff to Discuss Status of Licensing Actions Currently Under Review by NRR & to Discuss Any Upcoming Requests That Licensee Has Identified
ML20147G83127 March 1997Summary of 970220 Meeting W/Util Re June 1997 Operational Safeguards Response Evaluation at Plant
ML20137A37917 March 1997Summary of 970212 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status of Licensing Actions Currently Under Review by NRR Staff & to Discuss Upcoming Requests Identified by Licensee
ML20133P86822 January 1997Summary of 970114 Meeting W/Util Re Future Plans for Core Reload Design Analysis for Plant.List of Attendees & Matls Used in Presentation EnclShutdown Margin
ML20134D0409 October 1996Summary of 960919 Meeting W/Western Resources Re Proposed Takeover of Kansas City Power & Light by Western Resources. List of Attendees Encl
ML20129D54625 September 1996Summary of 960911 Meeting W/Wolf Creek Nuclear Operating Corp Staff to Discuss Status of Licensing Actions Currently Under Review by NRR Staff & to Discuss Upcoming Requests Identified by Licensee
ML20059G57612 January 1994Summary of 931209 Meeting W/Representatives of Util & Licensee Contractors to Discuss Planned Elimination of SG Hydraulic Snubbers at Plants.List of Attendees & Licensee Presentation Handout EnclScaffolding
ML20059F90211 January 1994Summary of 931208 Meeting W/Representatives of Wcnoc,Une & Licensees Contractor to Discuss TS Changes Being Considered by Licensees.List of Attendees Encl
ML20059L99712 November 1993Summary of 931015 Meeting W/Util in Rockville,Md Re Licensee Program on MOVs & Completion of Actions Recommended in GL 89-10.List of Meeting Attendees & Handouts EnclStroke time
Anchor Darling
ML20149D60515 September 1993Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing IssuesGeneric Fundamentals Examination
License Renewal
Inattentive
ML20056D83426 May 1993Summary of Operator Reactors Event Meeting 93-18 on 930519Loop seal
ML20128F0738 February 1993Summary of 921215 Meeting W/Util in Rockville,Md Re Deletion or Modification of Boron Dilution Mitigation Sys.List of Attendees & Viewgraphs EnclBoric Acid
Shutdown Margin
Stroke time
ML20055H73425 July 1990Summary of 900724 Meeting W/Kansas City Power & Light Co (Kcpl) Re Kcpl 900723 Announcement of Tender Offer for All Outstanding Shares of Kansas Gas & Electric Co Common Stock
ML20247L98324 July 1989Summary of 890418 Meeting W/Util in Arlington,Tx to Discuss Util Program to Improve Security Sys at Plant
ML20246J70812 July 1989Trip Rept of 890619-23 Visit to Plant & Training for Unescorted Site Access to Nonradiological & Radiological Areas.Training Completed by Passing Two ExamsGrab sample
ML20247K06714 May 1989Summary of 890518 Meeting W/Util in Rockville,Md to Discuss Reload Design & Planned Topical Repts Re Rod Exchange Methodology,Core Thermal Hydraulics & Transient Analysis. Agenda & List of Attendees Encl
ML20246L7285 May 1989Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation EnclScaffolding
ML20248J31730 March 1989Summary of 890320 Meeting W/Util in Arlington,Tx Re Security Sys Upgrade
ML20236B52428 February 1989Summary of 890223 Meeting W/Licensee in Arlington,Tx Re Personnel Access Control Into Vital Areas.List of Attendees & Util Handout Encl
ML20235R22123 February 1989Summary of 890214 Meeting W/Util & Westinghouse Re Licensee Reload Application.Licensee Proposed Tech Spec Changes Include Increased Peaking Factors,Positive Moderator Temp Coefficient & Increased Boron Concentration.Viewgraphs EnclShutdown Margin
ML20206L55625 November 1988Summary of 881117 Meeting W/Util Re Decision to Replace Rod Cluster Control Assemblies at Plant
ML20195H02725 November 1988Summary of Operating Reactor Events Meeting 88-46 on 881122
ML20155B82320 September 1988Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor ScramsFire Watch
ML20153G5484 May 1988Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items
ML20151N47113 April 1988Summary of 880407 Meeting W/Util & Westinghouse Re Reload for Cycle 4.Meeting Attendees & Nonproprietary Presentation EnclFLEX
ML20148P5881 April 1988Summary of 880316 Meeting W/Utils Re Containment Tendon Tech Specs for Facilities.Attendance List & Licensees Presentation Encl
ML20148H66215 January 1988Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl
ML20236P2845 November 1987Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams EnclUnanalyzed Condition
Flow Induced Vibration
ML20236K8012 November 1987Summary of 871023 Meeting W/Util Re Stuck Reactor Vessel Head Closure Bolts at Plant.Util Requested to Submit Analysis of Three Adjacent Bolts & Listed Commitments, Including Strict Leakage Limit on Vessel FlangeBoric Acid
ML20236A48614 October 1987Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl
ML20236A49014 October 1987Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl.Record Copy
ML20237L11128 August 1987Summary of Operating Reactors Events Meeting 87-28 on 870825 Re Events Which Occurred Since 870818 Meeting.List of Attendees & Significant Elements EnclUltimate heat sink