Letter Sequence Meeting |
---|
|
Results
Other: ML20195G001, ML20196G562, ML20199G257, ML20202F772, ML20207A732, ML20217D579, ULNRC-03920, Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair, ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld, ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790, ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions
|
MONTHYEARML20155B5791998-10-27027 October 1998 Proposed Tech Specs for Use of Electrosleeves on Two Cycle Basis Project stage: Request ULNRC-03920, Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair1998-11-13013 November 1998 Forwards non-proprietary Rev 3 to BAW-10219, Electrosleeving Qualification for PWR Recirculating SG Tube Repair Project stage: Other ML20198D1271998-12-16016 December 1998 Forwards RAI Re Request for Amend to TS & Bases to Allow Installation of Framatome Electrosleeves in Plant,Unit 1 SG for Max of 2 Operating Cycles Project stage: RAI ML20199G2571999-01-11011 January 1999 Provides Responses to 981216 RAI Re 981027 Amend Request to Revise TSs to Use Electrosleeves to Repair SG Tubes. Proprietary Encl Withheld Project stage: Other ML20202F7721999-01-29029 January 1999 Provides Changes to Further Clarify That Electrosleeve Use Is Limited to 2 Cycles Following Installation of First Electrosleeve Project stage: Other ML20205J6591999-04-0606 April 1999 Summary of 990318 Meeting with Union Electric & Framatome Technologies Re Electrosleeve Amend Application for Callaway Npp.List of Telcon Participants & Union Electric Fax with Callaway Probability Info Encl Project stage: Meeting ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.7901999-04-0707 April 1999 Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790 Project stage: Other ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld1999-04-0707 April 1999 Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld Project stage: Other ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions1999-05-17017 May 1999 Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions Project stage: Other ML20207A7321999-05-20020 May 1999 Submits Record of 990429 Telcon with Union Electric Personnel Re Electrosleeve Amend Application for Callaway Plant,Unit 1.Info Provided by Ue Included in Attachments 1 & 2.List of Personnel That Participated in Telcon Encl Project stage: Other ML20207G5151999-06-0808 June 1999 Summary of 990422 Meeting with Ue & NRC Staff Re Electrosleeved Repaired SG Tubes During Beyond Design Basis Accidents.List of Meeting Attendees,Nrc Staff Meeting Presentation Matls & Ue Meeting Presentation Matls Encl Project stage: Meeting ML20195G0011999-06-11011 June 1999 Submits Record of 990430 Telcon Re Nondestructive Exam ISI Issues,Including Increased Sensitivity of UT Exam Performed After Electrosleeve Installation Versus Eddy Current Test Performed Prior to Sleeve Installation Project stage: Other ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve Project stage: Other ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included Project stage: Other 1999-04-07
[Table View] |
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20207G5151999-06-0808 June 1999 Summary of 990422 Meeting with Ue & NRC Staff Re Electrosleeved Repaired SG Tubes During Beyond Design Basis Accidents.List of Meeting Attendees,Nrc Staff Meeting Presentation Matls & Ue Meeting Presentation Matls Encl ML20205J6591999-04-0606 April 1999 Summary of 990318 Meeting with Union Electric & Framatome Technologies Re Electrosleeve Amend Application for Callaway Npp.List of Telcon Participants & Union Electric Fax with Callaway Probability Info Encl ML20199G9871999-01-20020 January 1999 Summary of 981014 & 15 Meetings with WCNOC & Ue Re Proposed TS Amend That Supports Mod to Increase Sfp.List of Attendees & Summary of Each Topic Discussed Encl ML20198M3111998-12-29029 December 1998 Summary of 981203 Meeting with Wolf Creek Nuclear Operating Co Re Amend Application Requesting Approval to Increase SFP Capacity at Wolf Creek & Callaway Plants.List of Attendees & Licensee Presentation Matl Encl ML20248H0551998-06-0101 June 1998 Summary of 980513 Meeting W/Utils Re Proposed Amends to TSs to Support Planned Mods to Spent Fuel Pools at Plants ML20217A0261998-03-18018 March 1998 Summary of 980129 Meeting W/Util to Discuss Licensee Interpretation of Allowance to Perform TS Required Shutdown Surveillance Testing While at Power.Oversize Drawings Encl ML20198H5661997-12-31031 December 1997 Summary of 971209 Meeting W/Union Electric & Framatome Technologies,Inc in Rockville,Md Re Electrosleeving Process in Support of Union Electric Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant ML20198G2211997-12-22022 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md,Re Electrosleeving Process in Support of UE-proposed TS Amend That Would Allow Electrosleeving of Steam Generator Tubes at Callaway Plant.List of Attendees Encl ML20199F2691997-11-19019 November 1997 Summary of 971008 & 09 Meetings W/Union Electric & Westinghouse Electric Corp to Discuss Effects of Axial Offset Anomaly Currently Being Experienced by Plant.List of Attendees & non-proprietary Versions of Handout Matls Encl ML20217E0411997-09-24024 September 1997 Summary of 970813 Meeting W/Une & Framatome Technologies Re Electrosleeving Process in Support of UNE-proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Meeting Handout Matl Encl ML20149G3231997-07-18018 July 1997 Summary of 970506 & 07 Meetings W/Listed Attendees in Toronto,Ontario,Canada to Discuss FTI SG Electrosleeving Process.Nonproprietary Version of Handout Matl Presented at Meeting Encl ML20149H2751997-07-17017 July 1997 Summary of 970513-15 Meeting W/Util in Lynchburg,Va Re Licensee Steam Generator Electrosleeving Process.Meeting Attendees & Meeting Slides Encl ML20147G8311997-03-27027 March 1997 Summary of 970220 Meeting W/Util Re June 1997 Operational Safeguards Response Evaluation at Plant ML20133P8681997-01-22022 January 1997 Summary of 970114 Meeting W/Util Re Future Plans for Core Reload Design Analysis for Plant.List of Attendees & Matls Used in Presentation Encl ML20059G5761994-01-12012 January 1994 Summary of 931209 Meeting W/Representatives of Util & Licensee Contractors to Discuss Planned Elimination of SG Hydraulic Snubbers at Plants.List of Attendees & Licensee Presentation Handout Encl ML20059F9021994-01-11011 January 1994 Summary of 931208 Meeting W/Representatives of Wcnoc,Une & Licensees Contractor to Discuss TS Changes Being Considered by Licensees.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20128F0731993-02-0808 February 1993 Summary of 921215 Meeting W/Util in Rockville,Md Re Deletion or Modification of Boron Dilution Mitigation Sys.List of Attendees & Viewgraphs Encl ML20246J7081989-07-12012 July 1989 Trip Rept of 890619-23 Visit to Plant & Training for Unescorted Site Access to Nonradiological & Radiological Areas.Training Completed by Passing Two Exams ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20235R2211989-02-23023 February 1989 Summary of 890214 Meeting W/Util & Westinghouse Re Licensee Reload Application.Licensee Proposed Tech Spec Changes Include Increased Peaking Factors,Positive Moderator Temp Coefficient & Increased Boron Concentration.Viewgraphs Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20151N4711988-04-13013 April 1988 Summary of 880407 Meeting W/Util & Westinghouse Re Reload for Cycle 4.Meeting Attendees & Nonproprietary Presentation Encl ML20148P5881988-04-0101 April 1988 Summary of 880316 Meeting W/Utils Re Containment Tendon Tech Specs for Facilities.Attendance List & Licensees Presentation Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236K8011987-11-0202 November 1987 Summary of 871023 Meeting W/Util Re Stuck Reactor Vessel Head Closure Bolts at Plant.Util Requested to Submit Analysis of Three Adjacent Bolts & Listed Commitments, Including Strict Leakage Limit on Vessel Flange ML20236A4901987-10-14014 October 1987 Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl.Record Copy ML20236A4861987-10-14014 October 1987 Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl ML20237L1111987-08-28028 August 1987 Summary of Operating Reactors Events Meeting 87-28 on 870825 Re Events Which Occurred Since 870818 Meeting.List of Attendees & Significant Elements Encl ML20213F8021987-05-0404 May 1987 Summary of 870429 Meeting W/Util & Westinghouse Re Reload for Cycle 3 & Power Uprating Amend Requests.List of Attendees & Viewgraphs Encl ML20212F2921986-12-30030 December 1986 Summary of Operating Reactors Events Meeting 86-45 on 861222 Re Events Which Occurred Since Last Meeting on 861215.List of Attendees & Significant Elements of Events Discussed Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20154K2171986-03-0505 March 1986 Summary of Allegation Review Board 860210 Meeting.Listed Actions to Close Allegations RIII-86-A-002,RIII-86-A-0007, RIII-86-A-011,RIII-85-A-0188,RIII-85-A-0208 & RIII-86-A-003 Agreed Upon ML20138J8441985-12-12012 December 1985 Summary of 851205 Meeting W/Util & Westinghouse Re 851115 Reload Submittal for Cycle 2.Non-LOCA Transient Analysis, LOCA Analysis,Tech Spec Changes & Radiological Consequences Discussed.Viewgraphs & List of Attendees Encl ML20136G9081985-11-15015 November 1985 Summary of 850522 Meeting W/Kansas Gas & Electric Co,Union Electric Co & Snupps in Bethesda,Md Re Snupps Spds.List of Attendees & Proposed Agenda Encl ML20138R6711985-11-0707 November 1985 Summary of 851105 Meeting W/Util & Snupps at Site Re Proposed Mods to Low Temp Overpressure Protection Sys. Attendee List & Slides Used During Presentation Encl ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20209G6871985-09-0909 September 1985 Summary of Operating Reactor Events Meeting 85-14 on 850826 to Brief Director & Div Directors on Events Which Occurred Since 850813 Meeting.Computer Printout of 1985 Operating Reactor Events Meeting Topics to Date Encl IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed1984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed ML20127B5101984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed ML20054J0301982-06-17017 June 1982 Summary of 820430 Meeting W/Utils & Bechtel in Bethesda,Md Re Alternate Shutdown Panel & Related Fire Protection 1999-06-08
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20207G5151999-06-0808 June 1999 Summary of 990422 Meeting with Ue & NRC Staff Re Electrosleeved Repaired SG Tubes During Beyond Design Basis Accidents.List of Meeting Attendees,Nrc Staff Meeting Presentation Matls & Ue Meeting Presentation Matls Encl ML20205J6591999-04-0606 April 1999 Summary of 990318 Meeting with Union Electric & Framatome Technologies Re Electrosleeve Amend Application for Callaway Npp.List of Telcon Participants & Union Electric Fax with Callaway Probability Info Encl ML20199G9871999-01-20020 January 1999 Summary of 981014 & 15 Meetings with WCNOC & Ue Re Proposed TS Amend That Supports Mod to Increase Sfp.List of Attendees & Summary of Each Topic Discussed Encl ML20198M3111998-12-29029 December 1998 Summary of 981203 Meeting with Wolf Creek Nuclear Operating Co Re Amend Application Requesting Approval to Increase SFP Capacity at Wolf Creek & Callaway Plants.List of Attendees & Licensee Presentation Matl Encl ML20248H0551998-06-0101 June 1998 Summary of 980513 Meeting W/Utils Re Proposed Amends to TSs to Support Planned Mods to Spent Fuel Pools at Plants ML20217A0261998-03-18018 March 1998 Summary of 980129 Meeting W/Util to Discuss Licensee Interpretation of Allowance to Perform TS Required Shutdown Surveillance Testing While at Power.Oversize Drawings Encl ML20198H5661997-12-31031 December 1997 Summary of 971209 Meeting W/Union Electric & Framatome Technologies,Inc in Rockville,Md Re Electrosleeving Process in Support of Union Electric Proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant ML20198G2211997-12-22022 December 1997 Summary of 971120 Meeting W/Util in Rockville,Md,Re Electrosleeving Process in Support of UE-proposed TS Amend That Would Allow Electrosleeving of Steam Generator Tubes at Callaway Plant.List of Attendees Encl ML20199F2691997-11-19019 November 1997 Summary of 971008 & 09 Meetings W/Union Electric & Westinghouse Electric Corp to Discuss Effects of Axial Offset Anomaly Currently Being Experienced by Plant.List of Attendees & non-proprietary Versions of Handout Matls Encl ML20217E0411997-09-24024 September 1997 Summary of 970813 Meeting W/Une & Framatome Technologies Re Electrosleeving Process in Support of UNE-proposed TS Amend That Would Allow Electrosleeving of SG Tubes at Plant.List of Attendees & Meeting Handout Matl Encl ML20149G3231997-07-18018 July 1997 Summary of 970506 & 07 Meetings W/Listed Attendees in Toronto,Ontario,Canada to Discuss FTI SG Electrosleeving Process.Nonproprietary Version of Handout Matl Presented at Meeting Encl ML20149H2751997-07-17017 July 1997 Summary of 970513-15 Meeting W/Util in Lynchburg,Va Re Licensee Steam Generator Electrosleeving Process.Meeting Attendees & Meeting Slides Encl ML20147G8311997-03-27027 March 1997 Summary of 970220 Meeting W/Util Re June 1997 Operational Safeguards Response Evaluation at Plant ML20133P8681997-01-22022 January 1997 Summary of 970114 Meeting W/Util Re Future Plans for Core Reload Design Analysis for Plant.List of Attendees & Matls Used in Presentation Encl ML20059G5761994-01-12012 January 1994 Summary of 931209 Meeting W/Representatives of Util & Licensee Contractors to Discuss Planned Elimination of SG Hydraulic Snubbers at Plants.List of Attendees & Licensee Presentation Handout Encl ML20059F9021994-01-11011 January 1994 Summary of 931208 Meeting W/Representatives of Wcnoc,Une & Licensees Contractor to Discuss TS Changes Being Considered by Licensees.List of Attendees Encl ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20128F0731993-02-0808 February 1993 Summary of 921215 Meeting W/Util in Rockville,Md Re Deletion or Modification of Boron Dilution Mitigation Sys.List of Attendees & Viewgraphs Encl ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20235R2211989-02-23023 February 1989 Summary of 890214 Meeting W/Util & Westinghouse Re Licensee Reload Application.Licensee Proposed Tech Spec Changes Include Increased Peaking Factors,Positive Moderator Temp Coefficient & Increased Boron Concentration.Viewgraphs Encl ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20151N4711988-04-13013 April 1988 Summary of 880407 Meeting W/Util & Westinghouse Re Reload for Cycle 4.Meeting Attendees & Nonproprietary Presentation Encl ML20148P5881988-04-0101 April 1988 Summary of 880316 Meeting W/Utils Re Containment Tendon Tech Specs for Facilities.Attendance List & Licensees Presentation Encl ML20148H6621988-01-15015 January 1988 Summary of Operating Reactors Events Meeting 88-02 on 880112 Re Events Which Occurred Since Last Meeting on 880105.List of Attendees,Significant Elements of Events & Tabulation of long-term Followup Assignments to Be Completed Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl ML20236K8011987-11-0202 November 1987 Summary of 871023 Meeting W/Util Re Stuck Reactor Vessel Head Closure Bolts at Plant.Util Requested to Submit Analysis of Three Adjacent Bolts & Listed Commitments, Including Strict Leakage Limit on Vessel Flange ML20236A4901987-10-14014 October 1987 Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl.Record Copy ML20236A4861987-10-14014 October 1987 Summary of 871006 Meeting W/Util & Westinghouse to Discuss Transition Core Departure from Nucleate Boiling Ratio Penalty for Cycle 3 Operation.Attendee List,Util Ltr & Proprietary & Nonproprietary Viewgraphs Encl ML20237L1111987-08-28028 August 1987 Summary of Operating Reactors Events Meeting 87-28 on 870825 Re Events Which Occurred Since 870818 Meeting.List of Attendees & Significant Elements Encl ML20213F8021987-05-0404 May 1987 Summary of 870429 Meeting W/Util & Westinghouse Re Reload for Cycle 3 & Power Uprating Amend Requests.List of Attendees & Viewgraphs Encl ML20212F2921986-12-30030 December 1986 Summary of Operating Reactors Events Meeting 86-45 on 861222 Re Events Which Occurred Since Last Meeting on 861215.List of Attendees & Significant Elements of Events Discussed Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20154K2171986-03-0505 March 1986 Summary of Allegation Review Board 860210 Meeting.Listed Actions to Close Allegations RIII-86-A-002,RIII-86-A-0007, RIII-86-A-011,RIII-85-A-0188,RIII-85-A-0208 & RIII-86-A-003 Agreed Upon ML20138J8441985-12-12012 December 1985 Summary of 851205 Meeting W/Util & Westinghouse Re 851115 Reload Submittal for Cycle 2.Non-LOCA Transient Analysis, LOCA Analysis,Tech Spec Changes & Radiological Consequences Discussed.Viewgraphs & List of Attendees Encl ML20136G9081985-11-15015 November 1985 Summary of 850522 Meeting W/Kansas Gas & Electric Co,Union Electric Co & Snupps in Bethesda,Md Re Snupps Spds.List of Attendees & Proposed Agenda Encl ML20138R6711985-11-0707 November 1985 Summary of 851105 Meeting W/Util & Snupps at Site Re Proposed Mods to Low Temp Overpressure Protection Sys. Attendee List & Slides Used During Presentation Encl ML20141E5521985-09-26026 September 1985 Summary of ACRS Subcommittee on Reactor Operations 850910 Meeting in Washington,Dc to Discuss Recent Operating Occurrences.Fr Notice,Meeting Schedule & List of Meeting Slides Encl ML20209G6871985-09-0909 September 1985 Summary of Operating Reactor Events Meeting 85-14 on 850826 to Brief Director & Div Directors on Events Which Occurred Since 850813 Meeting.Computer Printout of 1985 Operating Reactor Events Meeting Topics to Date Encl ML20054J0301982-06-17017 June 1982 Summary of 820430 Meeting W/Utils & Bechtel in Bethesda,Md Re Alternate Shutdown Panel & Related Fire Protection 1999-06-08
[Table view] |
Text
'
l 8- '
pu%
g t UNITED STATE 8 l
g } NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20086 0001 l
l
! MEMORANDUM TO: FILE FROM: Mel Gray, Project Manager he/r '
Section IV-2 Project Directorate IV & Decommissioning Division of Licensing Project Management !
Office of Nuclear Reactor Regulation l
SUBJECT:
RECORD OF TELECON WITH UNION ELECTRIC AND FRAMATOME i TECHNOLOGIES, INC. PERSONNEL REGARDING ELECTROSLEEVE '
AMENDMENT APPLICATION FOR CALLAWAY PLANT, UNIT 1 (TAC ;
NO. MA3954) '
REFERENCES:
'(1) License Amendment Application, UE Letter ULNRC-03910, dated October 27,1998
)
(2) FTl Proprietary Presentation Material from July 2,1996 meeting, ,
submitted to NRC in FTl letter JHT/96-45, Attachment 7, from '
^
J. H. Taylor to K. M. Thomas, dated July 18,1996 j The NRC staff is completing its review of the Union Electric (UE) amendment application that requests approval to install the electrosleeve steam generator tube repair in Callaway Plant, ;
Unit 1 (Reference 1). The electrosleeve tube repair was developed by Framatome Technologies Inc. (FTI). Personnel that participated in the telecon on March 18,1999, are
. listed in Attachment 1.
During the telecon, FTl personnel discussed the electrosleeve strength data at elevated temperatures provided in Reference 2. FTl personnel described the temperature profile time history for each sample to ensure the staff and UE personnel have a common understanding of i
' this information.
, Considering that the strength data available indicates electrosleeve material strength will l decrease significantly at high temperature severe accident conditions, the staff is evaluating the
- l. capability of the repaired steam generator parent tube and installed electrosleeve to maintain integrity during severe accident conditions.- The staff described their in progress evaluations to FTl and UE personnel. FT! personnel indicated that they are preparing a white paper to
- - describe their understanding of the behavior of electrosleeve repaired tubes during severe i accident conditions. The white paper information would be more qualitative in nature compared i to the staff's ongoing quantitative evaluation. FTl and UE personnel agreed that FTl will )
provide the white paper to the NRC staff. -
m V 9904120134 990406 o PDR ADOCK 05000483 p PDR
-y -
l # f f , M , S h i b fi: ,l bmda Aa m 093069
1 F- .
. ! l l
A second telecon was held later on March 18,1998, with NRC and UE persennel. Attachment !
1 list: the participants. UE personnel faxed an evaluation of the Callaway plant specific !
probability of scenarios that could cause severe accident corditions la the steam generator )
- tubes. This fax was discussed during the second telecon and is enclosed as Attachtnent 2. l l The staff is considering this probability data in the ongoing review of the amendment
! application.
4 l
Attachments: 1. List of Telecon Participants
- 2. Fax from UE of Callaway Probability information l
- i i 1 I
[:
April 6, 1999 A second telecon was held later on March 18,1998, with NRC and UE personnel. Attachment i lists the participants. UE personnel faxed an evaluation of the Callaway plant specific probability of scenarios that could cause severe accident conditions in the steam generator tubes. This fax was discussed during the second telecon and is enclosed as Attachment 2.
The staff is considering this probability data in the ongoing review of the amendment application.
Attachments: 1. List of Telecon Participants
- 2. Fax from UE of Callaway Probability Information DISTRIBUTION:
iDocketfNeilf PUBLIC PlV Reading BSheron SRichards SDembek MGray EMurphy EPeyton CBeardslee JStrosnider PRush JMuscara EHackett SLong OGC.
ACRS KBrockman, Region IV LYandell, Region IV DOCUMENT NAME: MTFA3954.WPD OFC PDIV/PM PDIV/LA PDIV/SC NRR:EMCB NAME Mir EPIho'r SDembek d_ '-"rp.y 7~L ' /; ,,
DATE 3/ 27 /99 38 G99 / [/99 / k /99 OFFICIAL RECORD COPY f i
l
i
]
i I
j l
l ATTACHMENT 1 l
l LIST OF TELECON PARTICIPANTS March 18,1999,1:00 PM (eastern time)
Union Electric Comoany D. Shafer l T. Herrmann Framatome Technoloaies J. Galford J. Fleck '
G. Bean E
M. Gray C. Beardslee E. Murphy E. Hackett l J. Muscara S.Long March 18,1999,2:30 PM (eastern time)
Union Electric Comoany D. Shafer.
K. Connelly M. Wahls E
M. Gray S.Long l
t f
I
r 1 1 .
1 ATTACHMENT 2 1 1
FAX FROM UE OF t ALLAWAY PROBABILITY . AFORMATION l
1 4
4
, MAR 10 '99 02:26PM LE NUCLEAR P.2 V
I l a
" l 4 l
" O** 5 5 ! ,
5 Eg- -
i 5i g
k J i
I
)
i i!
%8 aw=- i I E _i l}
5 I_
m N
5k l
I n1
- i ;
W* 3 5$ e
, , i 4
i r
i.l-
-8 C w
Y 5
6 I
l l
i t I h
J e l5-hv ;
W .
k 400*24P'r
- A83 19103 pat a t twene 50s sas4 2n it*3 veed 84-st-C **M 40 3 AA8' led O\13\l40eftsh 1 1
" P.3
(: ' MR 18 '99 02:2SPM s Fau l ..
-. . -
- c s with Losn of DHR (FW and F/B) l S(1)S05 6.25E-10 ,
, S(1)S10 1.83E-10 l
S(1)S11 0.00E+00 .
S(2)S10 0.00E+00 l S(2)S11 0.00E+00 l - S(2)S20 1.82E-10 l
S(3)SO4 1.23E-09 S(3)S05 .2.31 E-09 S(3)S12 4.95E-08 -
T(1)S03 5.36E 08 3.11E48 is frequency of sequences with Lt. SP.
T(1)SO4 1.69E-06 T(1)S05 7.51E-08 j T(1S)S22 1.03E-08 0.68 conditional prob that loss of DHP. is LOSP-initiated. i T(1S)S23 1.36E-07 l T(1S)S24 5.SiE-08 0.32 conditional prob that loss of DHR is not LOSP-initiated.
T(1S)S25 1.22E-08 T(15)S26 2.75E i T(2)S03 5.69E-08 T(2)SO4 1.09E-07 T(2)S05 2.38E-08 T(3)SO4 5.84E-08 T(3)S05 1.34E-07 T(3)S06 3.43E-08 TAT 1S03 0.00E+00 P(FPinj) = 0.1 + [0.32(0.02) + 0.68(0.13)) = 9 dig, TAT 1512 0.00E+00 TAT 1S13 2.49E-10 F(D,)
- P(FPinj) = (4.58E-6) * (0.195) = IME ?_
TAT 1S22 0.00E+00 I TAT 1S23 1.05E-10 F(Dsm)
- SF(Lseal) = (8.93E-7) * (0.5) = (E.gg, TAT 3503 1.27E 10 TAT 3S12 9.32E-10 .
TAT 3S13 1.23E-08 '
TAT 3S22 0.00E+00 TAT 3S23 5.21E-09 "TNK1S03 2.51E-08 TNK1504 4.71E-09 j i
TNK1S05 2.06E-07 l TNK4S03 2.02E-08 TNK4SO4 4.61E-09 TNK4505 3.76E-08 l
~T(SG)SM 1.48E-09 l T(SG)S21 2.39E-10 l
T(SG)S22 5.95E-10 ,
T(SG)S37 2.39E49
. T(SW)S19 4.16E 09 T(SW)S20 1.61 E-09 T(SW)S21 3.02E-08 T(SW)S22 8.43E-07 T(C)S15 0.00E+00 T(C)S16 0.00E400 T(C)S17 0.00E+00 T(C)S18 0.00E+00 T(C)S19 1.15E-10 Total: 4.58E48 c . .. , . - _ mm. .. .... _ _ . _ ___ _ _ _ . _. ,__