Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212A247 | 15 September 1999 | Summary of 990902 Meeting with Westinghouse in Rockville,Md Re Changes That W Plan to Make in Rev 3 of AP600 Design Control Document (Dcd).List of Attendees & Handouts Encl | |
ML20206S683 | 1 September 1998 | Summary of 453rd ACRS Meeting on 980603-05 in Rockville,Md Re Appropriate Action on Items Listed in Attached Agenda | Fire Barrier Anticipated operational occurrence Probabilistic Risk Assessment Backfit |
ML20206S372 | 29 July 1998 | Summary of 980707 ACRS Advanced Reactor Designs Subcommittee Meeting in Rockville,Md Re Info on AP600 Test & Analysis Program & Responses to ACRS Questions Asked During Previous Meetings | Safe Shutdown Probabilistic Risk Assessment |
ML20206S350 | 26 June 1998 | Summary of 980617-18 ACRS Advanced Reactor Designs Subcommittee Meeting in Rockville,Md Re Review of Advance FSER Chapters 4,5,7,8,11,13 & 18,level 1 AP600 Pra,Itaac & Associated ACRS Open Questions | Probabilistic Risk Assessment Squib |
ML20206S336 | 22 June 1998 | Summary of 980611-12 Open ACRS Thermal Hydraulic & Severe Accident Phenomena Subcommittee Meeting in Rockville,Md Re Continuance of Review of Results of W Test & Analysis Program in Support of AP600 Design Certification | |
ML20249A719 | 16 June 1998 | Summary of 980611 Appeal Meeting W/Westinghouse in Rockville,Md Re Appeal of NRC Position on Use of AP600 Bldg Figures in Section 3.3 of AP600 Tier 1 Matl.Attendance List, handouts,marked-up Page 3.3-1 & Note 2 Encl | |
ML20206S567 | 30 May 1998 | Summary of ACRS Advanced Reactor Designs Subcommittee 980513-15 Meeting in Rockville,Md Re Review of AP600 Standard SAR & Associated Advanced FSER Chapters 3,6,14,16 & 17 | Probabilistic Risk Assessment Squib |
ML20206S252 | 14 May 1998 | Summary of 451st ACRS Meeting on 980402-04 in Rockville,Md Re Items Listed in Attached Agenda | Probabilistic Risk Assessment |
ML20217K628 | 28 April 1998 | Summary of 980416 Meeting W/Westinghouse in Rockville,Md to Discuss AP600 TS Issues.List of Participants & Handouts & Markups Provided by Licensee During Meeting,Encl | Squib |
ML20217P844 | 7 April 1998 | Summary of 980212 Meeting W/Westinghouse in Rockville,Md to Continue Discussion on Level 1 Probabilistic Risk Assessment Insights.Addl Telcon Was Held on 980217,due to Unresolved Issues During Meeting.List of Attendees Encl | Hot Short Safe Shutdown Boric Acid Fire Barrier Probabilistic Risk Assessment Squib Earthquake Fire Protection Program |
ML20217J932 | 3 April 1998 | Summary of 980211 Meeting W/W in Rockville,Md Re Safety Classification of Coatings Inside Containment & on Exterior of Containment Shell.List of Attendees & Handout Encl | Coatings |
ML20216G607 | 12 March 1998 | Summary of 980211 Meeting W/Westinghouse in Rockville,Md Re Status of Open Issues Resulting from Design Certification Review of AP600.List of Attendess Encl | |
ML20216B122 | 6 March 1998 | Summary of 980122 Meeting W/Westinghouse in Rockville,Md Re Status of Open Issues Resulting from Design Certification Review of AP600.List of Attendees Encl | Coatings |
ML20216G147 | 6 March 1998 | Summary of 980224 Meeting W/Westinghouse Electric Co to Resolve Issues Re AP600 Fire Protection Design | Hot Short Safe Shutdown |
ML20197B909 | 6 March 1998 | Summary of 971218 Meeting W/Westinghouse in Rockville,Md Re Open Issues Remaining on Analyses of Radiological Consequences of Design Basis Accidents for AP600 Design. List of Attendees & Handouts Provided at Meeting Encl | |
ML20217A856 | 5 March 1998 | Summary of ACRS 448th Meeting on 980205-07 Re Several Matters & Completed Listed Rept & Ltr.Committee Authorized Larkins,Executive Director,To Transmit Memoranda Listed | Fire Barrier Probabilistic Risk Assessment Large early release frequency |
ML20206S265 | 23 February 1998 | Summary of 980203-04 ACRS Subcommittee on Advanced Reactor Designs Open Meeting in Rockville,Md Re Review of Chapters 1,4,5,7,8,11,13 & 18 of AP600 Ssar & AP600 Test & Analysis Program | Safe Shutdown Loop seal Coatings |
ML20203H869 | 19 February 1998 | Summary of 980211 Meeting W/W in Rockville,Md Re W Opportunity to Respond to NRC Insp Rept 99900404/97-02,dtd 980128.List of Attendees & Meeting Handouts Encl | |
ML20203A899 | 11 February 1998 | Summary of 980120 & 21 Meeting W/Westinghouse to Discuss AP600 Structural Calculations to Resolve FSER Open Items. List of Participants & Handouts Encl | |
ML20198Q147 | 13 January 1998 | Summary of 971104 Meeting W/Westinghouse in Rockville,Md Re AP600 Nuclear Island Basemat Design,Configuration of Shear Stirrups & Shear Capacity of Deep Slabs.List of Attendees & Handouts Encl | |
ML20198H562 | 7 January 1998 | Summary of 971218 Meeting W/Westinghouse in Rockville,Md to Discuss Design Certification Schedule for AP600 Review | Coatings |
ML20198A186 | 18 December 1997 | Summary of 971117 Meeting W/Westinghouse in Rockville,Md Re Design Certification Schedule for AP600.List of Attendees & Handouts Provided During Meeting Encl | Safe Shutdown Coatings B.5.b Mitigating Strategies |
ML20199B121 | 6 November 1997 | Summary of 971029 Meeting W/Westinghouse in Rockville,Md to Discuss Problems & Progress Affecting AP600 Review Schedule. List of Attendees Encl | |
ML20198R660 | 30 October 1997 | Summary of 971109 Telcon W/Westinghouse to Discuss RAI Responses Related to TS & Sys Level Testing | Squib |
ML20198R926 | 30 October 1997 | Summary of 971009 Meeting W/Westinghouse in Rockville,Md Re Design Certification Schedule for AP600.List of Attendees & Handouts Encl | Safe Shutdown |
ML20212B749 | 20 October 1997 | Summary of 971007 Meeting W/Westinghouse in Rockville,Md Re AP600 General Design Features & Safety Philosophy.List of Attendees & Presentation Slides Provided by Westinghouse Encl | |
ML20217K795 | 17 October 1997 | Summary of 970929 Meeting W/W to Discuss Fire Protection Issues for AP600 Design.List of Attendees & Handouts Provided by Licensee Encl | |
ML20211L275 | 7 October 1997 | Summary of 970923 Meeting W/Westinghouse in Monroeville,Pa Re Status of Completion of AP600 Design Documentation in Several Review Areas in Order to Support Final QA Insp | |
ML20217E814 | 2 October 1997 | Summary of 970925 Meeting W/Westinghouse in Rockville,Md Re First Interdisciplinary Review of ITAAC for AP600 Design. Agenda & Listed of Attendees Encl | |
ML20217E996 | 2 October 1997 | Summary of 970911 Meeting W/Westinghouse Electric Corp Re Fire Protection Issues for AP600 Design | Safe Shutdown |
ML20211H969 | 30 September 1997 | Summary of 970804-15 Meeting W/W in Rockville,Md to Review Structural Design of Nuclear Island Structures.List of Participants & Agenda for 2 Wk Review Encl | Safe Shutdown Earthquake |
ML20211G268 | 23 September 1997 | Summary of 970910 Meeting W/Westinghouse in Rockville,Md Re Design Certification Schedule for AP600.List of Attendees & Handouts Encl | |
ML20211C489 | 18 September 1997 | Summary of 970717,0805,0905 & 0911 Telcons Between Westinghouse & Staff Members Re Severe Accident & PRA Issues.List of Participants,Topics for Discussion & Disposition for Topics Encl | Squib |
ML20198H542 | 11 September 1997 | Summary of 970828 Telcon W/W Re Proposed Design Changes to AP600 MCR Habitability Sys.List of Participants & Preliminary Sketch of Modified Design & Associated Temperature Response Encl | Loop seal Grab sample |
ML20210Q764 | 28 August 1997 | Summary of 970826 Telcon W/Westinghouse Re AP600 Emergency Response Guidelines.Summary of Actions from Telcon Listed. List of Telcon Participants Encl | |
ML20210Q756 | 22 August 1997 | Summary of 970808 Meeting W/Westinghouse Electric Corp in Monroeville,Pa Re Fire Protection Issues for AP600 Design. List of Attendees,Agenda & Slides Presented by Westinghouse Encl | Hot Short Safe Shutdown Mission time Fire Barrier Probabilistic Risk Assessment |
ML20210Q122 | 22 August 1997 | Summary of 970807 Meeting W/Westinghouse Re Proposed Containment Spray Design for AP600 Design.List of Attendees & Slides Encl | |
ML20210M736 | 19 August 1997 | Summary of 970807 Meeting W/W in Rockville,Maryland Re AP600 MCR Habitability Sys Operational Parameters of Air Flow rates,CO2 Levels,Temperature & Humidity Needed to Establish Personnel Habitability of Design | |
ML20217K674 | 12 August 1997 | Summary of 970806 Safeguards Meeting W/Westinghouse to Discuss Safeguards Issues on AP600 Design | |
ML20217G862 | 31 July 1997 | Summary of 970708 Meeting W/Westinghouse in Rockville,Md to Discuss Design Certification Issues for AP600.List of Attendees & Handouts Encl | Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Fire Protection Program Flow Induced Vibration |
ML20151J650 | 31 July 1997 | Summary of 970723 Telcon W/W to Discuss 970709 Submittal of NSD-NRC-97-5227 Re Site Parameters.List of Attendees & Comments Prior to Telcon Encl | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML20151J608 | 31 July 1997 | Summary of 970709 Meeting W/Westinghouse in Rockville,Md Re Discuss Design Certification Issues for AP600.List of Attendees & Handouts Encl | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Fire Protection Program |
ML20141D432 | 23 June 1997 | Summary of 970425 Meeting W/Westinghouse in Rockville,Md Re Resolution of Open Items for Reactor Sys AP600 Pirt/Scaling Closure rept,(WCAP-14727).List of Attendees,Meeting Agenda & Westinghouse Meeting Presentation Matl Encl | |
ML20141C497 | 23 June 1997 | Summary of 970609 Meeting W/W in Rockville,Md to Discuss Open Item Tracking Sys Issues Involving Instrumentation & Control Section of AP600 TSs Section 3.3.Highlights from Meeting & Summary of Results Listed | Squib |
ML20149J218 | 16 June 1997 | Summary of 970416-18 Meeting W/Westinghouse in Monroeville, MD Re AP600 Piping Design Analysis.Meeting Attendees Listed in Encl 1 | Safe Shutdown Non-Destructive Examination Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Finite Element Analysis Earthquake |
ML20140G454 | 12 June 1997 | Summary of 970520 Meeting W/Westinghouse in Monroeville,Pa Re AP600 Containment Hydrogen Control Sys.List of Attendees & Action Items Identified During Meeting Encl | |
ML20140B425 | 4 June 1997 | Summary of 970519 Meeting W/Westinghouse Re AP600 Fire Protection Issues | Safe Shutdown |
ML20141G542 | 15 May 1997 | Summary of 970422 Meeting W/W in Rockville,Md to Discuss Design Certification Issues for AP600.List of Meeting Attendees Encl | Ultimate heat sink Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Condition Adverse to Quality Earthquake Fire Protection Program |
ML20141G380 | 15 May 1997 | Summary of 970414-18 Meeting W/W in Monroeville,Pa to Discuss W Ssar Sections 3.7 & 3.8 Re Design & Analysis of Structural Modules,Review Structural Design Calculations & Resolve Remaining Dser Open Items.List of Attendees Encl | Safe Shutdown Safe Shutdown Earthquake |
ML20141D036 | 15 May 1997 | Summary of 970513 Meeting W/W to Discuss Safeguards Issues on AP600 Design.List of Attendees Encl |