xt La) f; Lt.

,. #* Wg g 4 UNITED STATES y j. j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3066H001 8 March 12, 1998

\ . . ., . . j &

APPLICANT: Westinghouse Electric Company FACILITY: AP600

SUBJECT:

SUMMARY

OF MEETING WITH WESTINGHOUSE TO DISCUSS THE STATUS OF THE DESIGN CERTIFICATION REVIEW OF THE AP600 The subject meeting was held in the Rockville, Maryland, office of the U.S. Nuclear Regulatory Commission (NRC) between representatives of Westinghouse and the NRC staff on February 11, 1998. The purpose of the meeting was to discuss the status of the open issues resulting from the design certification review of the AP600. The attachment is a list of meeting attendees.

Mr. Roe opened the meeting stating that the staff has identified a change in the Standard Safety Analysis Repo 1 (SSAR) that it did not expect. The staff expressed concem that unexpected i changes may have been made to the SSAR after the Draft Safety Evaluation Report (SER) was issued in November 1994. Such changes may not have been identified by the staff until recently because the staff closed out those areas in that 1994 report, and saw no need to rereview those i areas. The staff is now in the process of performing a final verification of its FSER against the SSAR. Westinghouse agreed to ask its SSAR Section Leaders what changes were made in the {

l SSAR that the staff may not be aware of.  !

The staff indicated that it intends to provide the Advisory Committee on Reactor Safeguards with advanced copies of FSER Chapters that do not contain open items to support the meeting scheduled for March 31 - April 1,1998.

j The participants then discussed what issues were candidates for appeal meetings with NRR l

senior management. Potential candidates included fire protection; inspections, Tests, Analyses, and Acceptance Criteria; and code development issues.

Expected submittal dates for certain key licensing issues were discussed, as follows.

. Revision 20 to the SSAR Submitted today

. Revision 21 to the SSAR To Be Determined

. WGOTHIC Scaling Report February 27,1998

. Security Design Report February 20,1998

. Responses to RAls on hydrodynamic loads Within 2 weeks

. PIRT Scaling Report Within 2 weeks

< NOTRUMP information By next week

. ITAAC descriptions Within 2 weeks 1

@. f, J 4803200053 980312 PDR ADOCK 05200003 A PDR aa NBC M CNE EM ll ll ll Illi,1,11,1ll

Marcli 12, 1998 Westinghouse requested the NRC to provide feedback on those items after a response had been provided. At the conclusion of the meeting, dates for upcoming meetings and remaining work were discussed. A draft of this meeting summary was provided to Westinghouse to allow them the opportunity to comment on the summary prior to issuance, original signed by:

Thomas J. Kenyon, Project Manager Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-003

Attachment:

As stated cc w/att: See next page DISTRIBUTION w/ attachment:

Docket File PDST R/F TKenyon PUBLIC BHuffman JSebrosky DScaletti JNWilson SMagruder JHWilson MDunsaniwskyj DISTRIBUTION w/o attachments: l SCollins/FMiraglia,0-12 G18 BSheron,0-12 G18 BBoger,0-12 G18 JRoe DMatthews TQuay ACRS (11) JMoore,0-15 B18 PBoehnert, T-2 E20 1

1 i

i DOCUMENT NAME: A:\SMM_2_11. SUM To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy 1 with cttachment/encksure "N" = No copy l OFFICE PM:P657bRPM l D:PDST:DRPM l l l l NAME TJKenhn:sg TRQuayt.t.2 l DATE 03A L/98 03/ n/98 )

OFFICIAL RECORD COPY  !

'i.

Westinghouse Electric Corporation Docket No.52-003 i

cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis )

U.S. Department of Energy, NE-42 '

Nuclear and Advanood Technology Division Office of LWR Safety and Technology l Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD 20874

)>

Pittsburgh, PA 15230 Mr. Russ Bell Mr. B. A. McIntyre Senior Project Manager, Programs Advanced Plant Safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 i Street, NW Energy Systems Business Unit Suite 300 Box 355 Washington, DC 20006 3706 Pittsburgh, PA 15230 Ms. Lynn Connor Ms. Cindy L. Haag Doc-Search Associates Advanced Plant Safety & Licensing Post Office Box 34 Westinghouse Electric Corporation Cabin John, MD 20818 Energy Systems Business Unit Box 355 Dr. Craig D. Gawyer, Manager Pittsburgh, PA 15230 Advanced Reactor Programs GE Nuclear Energy Mr. M. D. Beaumont 175 Curtner Avenue, MC-754 Nuclear and Advanced Technology Division San Jose, CA 95125 -

Westinghouse Electric Corporation  ;

One Montrose Metro Mr. Robert H. Buchholz j 11921 Rockville Pike GE Nuclear Energy Suite 350 175 Curtner Avenue, MC-781 Rockville, MD 20852 San Jose, CA 95125 Mr. Sterling Franks Barton Z. Cowan, Esq.

U.S. Department of Energy Eckert Seamans Cherin & Mellott NE-50 600 Grant Street 42nd Floor 19901 Germantown Road Pittsburgh, PA 15219  ;

Germantown, MD 20874 Mr. Ed Rodwell, Managt,r  !

Mr. Charles Thompson, Nuclear Engineer PWR Design Certification i AP600 Certification Electric Power Research Institute  !

NE-50 3412 Hillview Avenue I 19901 Germantown Road Palo Alto, CA 94303 l Germantown, MD 20874 Mr. Robert Malers, P.E. ,

Pennsylvania Department of l Environmental Protection Bureau of Radiation Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 i

9.

6 AP600 MANAGEMENT MEETING MEETING ATTENDEES FEBRUARY 11,1998 NAME ORGANIZATIQN THOMAS KENYON NRRIDRPM/PDST JACK ROE NRR/DRPM DINO SCALETTI NRR/DRPM/PDST CHARLES THOMPSON DOE STEWART MAGRUDER NRR/DRPM/PDST PAUL BOEHNERT ACRS TED QUAY NRR/DRPM/PDST 4

i l

Attachment