IR 05000313/2024301 | 14 August 2023 | Notification of NRC Initial Operator Licensing Examination 05000313/2024301 | |
ML23130A273 | 10 May 2023 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML23114A154 | 23 March 2023 | 03 Public Forms | |
2CAN032305, 03 Post Examination Analysis | 23 March 2023 | 03 Post Examination Analysis | Power change |
ML23031A013 | 14 February 2023 | Examination Confirmation Letter No. 50-186/OL-23-01, University of Missouri-Columbia | |
ML22354A258 | 15 December 2022 | 10_RBS-2022-12 Post-Exam Comments | |
ML23004A192 | 14 December 2022 | 11_RBS-2022-12 Public Forms | |
ML22147A188 | 13 April 2022 | 04 Public Forms | |
ML22133A292 | 13 April 2022 | 04 Post Examination Analysis | |
ML22075A344 | 16 March 2022 | Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
ML21320A369 | 30 November 2021 | Notification of NRC Initial Operator Licensing Examination 05000458/2022301 | |
ML21235A176 | 26 August 2021 | ANO1 2022-04 Corporate Notification Letter Cco | |
ML21106A151 | 16 April 2021 | and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations | |
2CAN042102, 10 AN2-2021-03 Post-Exam Comments | 16 April 2021 | 10_AN2-2021-03 Post-Exam Comments | Safe Shutdown Ultimate heat sink Temporary Modification FLEX Earthquake |
ML21137A277 | 8 April 2021 | Examination Outline Quality Checklist | |
ML21137A285 | 8 April 2021 | 2_AN2-2021-03 Outline Comments | |
ML21137A284 | 8 April 2021 | 1_AN2-2021-03 Draft Outlines | Boric Acid Time Critical Operator Action Offsite Circuit |
ML21137A290 | 8 April 2021 | 7_AN2-2021-03 Final Outlines | Boric Acid Offsite Circuit |
ML21137A289 | 8 April 2021 | 6_AN2-2021-03 Operating Test Comments (Final) | |
ML21137A288 | 8 April 2021 | 5_AN2-2021-03 Draft Operating Test | Boric Acid Shutdown Margin Grab sample Hydrostatic Job Performance Measure Surveillance Frequency Control Program Time Critical Operator Action Deep Dose Equivalent Pressure Boundary Leakage Power change Siren Overexposure |
ML21137A287 | 8 April 2021 | 4_AN2-2021-03 Draft Written Exam Comments | Operability Assessment |
ML21137A286 | 8 April 2021 | 3_AN2-2021-03 Draft Written Exam | Hot Short Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Locked High Radiation Area FLEX Earthquake Fuel cladding Offsite Circuit Unidentified leakage |
ML21134A241 | 8 April 2021 | 8_AN2-2021-03 Final Written Exam | Hot Short Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Grab sample Stroke time Post Accident Monitoring Locked High Radiation Area FLEX Surveillance Frequency Control Program Severe Accident Management Guideline Earthquake Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Power change Downpower Unidentified leakage |
ML21134A242 | 8 April 2021 | 9_AN2-2021-03 Final Operating Test | Boric Acid Shutdown Margin Job Performance Measure Time Critical Operator Action Pressure Boundary Leakage Power change |
ML21075A036 | 18 March 2021 | NRC Initial Operator Licensing Examination Approval 05000368/2021301 | |
ML21096A026 | 19 February 2021 | RB-2021-02 Draft Written Exam | Time of Discovery Shutdown Margin Reactor Vessel Water Level Half scram Temporary Modification Squib Missed surveillance Continuous fire watch Fire Watch Coast down |
ML21096A021 | 19 February 2021 | RB-2021-02 Draft Operating Test Comments | |
ML21096A023 | 19 February 2021 | RB-2021-02 Draft Outline Comments | |
ML21096A024 | 19 February 2021 | RB-2021-02 Draft Outlines | Half scram |
ML21096A025 | 19 February 2021 | RB-2021-02 Draft Written Exam Comments | Time to boil Squib Unidentified leak |
ML21096A027 | 19 February 2021 | RB-2021-02 Final Outlines | Half scram |
ML21095A053 | 19 February 2021 | RB-2021-02 Final Op Test | Reactor Vessel Water Level Half scram Water Inventory Control Coast down |
ML21111A147 | 19 February 2021 | RB-2021-02 Public Forms | |
ML21096A032 | 19 February 2021 | RB-2021-02 Post Exam Comments | |
ML21096A028 | 19 February 2021 | RB-2021-02 Final Written Exam | Time of Discovery Shutdown Margin Reactor Vessel Water Level Half scram Temporary Modification Squib Missed surveillance Scram Discharge Volume Continuous fire watch Fire Watch Hourly Fire Watch Coast down |
ML20233A925 | 5 June 2020 | AN1-2020-04 Final Outlines | Boric Acid Shutdown Margin Time to boil Post Accident Monitoring Locked High Radiation Area |
ML20233A924 | 5 June 2020 | AN1-2020-04 Draft Written Exam | High Radiation Area Fire Barrier Fire impairment Locked High Radiation Area Missed surveillance Deep Dose Equivalent Pressure Boundary Leakage Continuous fire watch Hourly Fire Watch Downpower Unidentified leakage |
1CAN101904, AN1-2020-04 Draft Outlines | 5 June 2020 | AN1-2020-04 Draft Outlines | Post Accident Monitoring Locked High Radiation Area Time Critical Operator Action |
ML20233A922 | 5 June 2020 | AN1-2020-04 Draft Operating Test | Boric Acid Shutdown Margin High Radiation Area Stroke time Time to boil Post Accident Monitoring Job Performance Measure Power change Downpower |
ML20233A919 | 5 June 2020 | AN1 2020-04 Draft Written Comments | B.5.b Downpower |
ML20233A920 | 5 June 2020 | AN1-2020-03 Draft Outline Comments | Shutdown Margin |
ML20233A921 | 5 June 2020 | AN1-2020-04 Draft Operating Test Comments | Coronavirus |
ML20204A806 | 4 June 2020 | AN1-2020-04 Final Op Test | Boric Acid Shutdown Margin High Radiation Area Stroke time Time to boil Post Accident Monitoring Job Performance Measure Offsite Circuit Power change Downpower |
ML20204A807 | 4 June 2020 | AN1-2020-04 Final Written Exam | Unanalyzed Condition Boric Acid Time of Discovery Fitness for Duty Shutdown Margin High Radiation Area Fire Barrier Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Fire impairment Anchor Darling Locked High Radiation Area Missed surveillance Design basis earthquake Foreign Material Exclusion Deep Dose Equivalent Pressure Boundary Leakage Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Power change Downpower Coast down Unidentified leakage |
ML20085F829 | 25 March 2020 | NRC Initial Operator Licensing Written Examination Approval Amended 05000313/2020301 | Pandemic Coronavirus |
ML20079L951 | 19 March 2020 | NRC Initial Operator Licensing Examination Approval 05000313/2020301 | |