Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24032A4761 February 2024Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve
ML24032A02031 January 2024NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023
ML23319A24529 January 2024Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 IssuesCyber Security
Surveillance Frequency Control Program
Safeguards Contingency Plan
Fire Protection Program
ML24023A28023 January 2024Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump
CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions17 January 2024Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions
ML24018A01417 January 2024Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913
ML24016A30416 January 2024Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump
CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-4711 January 2024Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47EVT-1
IR 05000327/202344211 January 202495001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter
ML24011A31611 January 2024Submittal of Discharge Monitoring Report (Dmr), August 2023
ML24011A31711 January 2024Submittal of Discharge Monitoring Report (Dmr), September 2023
ML24011A32011 January 2024Submittal of Discharge Monitoring Report (Dmr), December 2023
ML24011A31811 January 2024Submittal of Discharge Monitoring Report (Dmr), October 2023
ML24011A31911 January 2024Submittal of Discharge Monitoring Report (Dmr), November 2023
ML24010A21310 January 2024CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers
ML24018A0954 January 2024Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0
ML24004A0333 January 2024Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter
ML24004A0403 January 2024Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation
ML23319A1993 January 2024Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief ValvesIncorporated by reference
Surveillance Frequency Control Program
ML24022A1733 January 2024Receipt and Availability of the Subsequent License Renewal Application
ML23355A20621 December 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation21 December 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)18 December 2023Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)Safe Shutdown
Anticipated operational occurrence
ML23348A39414 December 2023Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve
ML23346A12212 December 2023Annual Non-Radiological Environmental Operating Report - 2023
IR 05000259/202301011 December 2023Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010Commercial Grade Dedication
ML23335A0721 December 2023Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump
ML23334A24930 November 2023Site Emergency Plan Implementing Procedure Revision
CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan29 November 2023Submittal of Fifth 10-Year Interval Inservice Testing Program PlanSafe Shutdown
High Radiation Area
Stroke time
Anchor Darling
Incorporated by reference
Locked High Radiation Area
FLEX
B.5.b
Scram Discharge Volume
Large early release frequency
Excess Flow Check Valve
Power Operated Valves
Grace period
Weak link
IR 05000327/202342028 November 2023Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420Affidavit
CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions27 November 2023Central Emergency Control Center Emergency Plan Implementing Procedure Revisions
ML23331A25327 November 2023Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions
ML23325A11021 November 2023Anchor Darling Double Disc Gate Valve Commitment RevisionAnchor Darling
ML23320A25416 November 2023Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump
IR 05000259/202300313 November 2023Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003Safe Shutdown
High Radiation Area
Stroke time
Enforcement Discretion
Coatings
Temporary Modification
Functionality Assessment
FLEX
Corrosion bonding
Significance Determination Process
Operability Determination
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
Fire Protection Program
Fire Watch
Hourly Fire Watch
Substantial potential for overexposure
Flow Induced Vibration
Power Uprate
Overexposure
ML23324A4369 November 2023Exam Corporate Notification Letter Aka 210-day Letter
ML23307A0828 November 2023Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage InstallationExemption Request
IR 05000327/20230033 November 2023Integrated Inspection Report 05000327/2023003 and 05000328/2023003Temporary Modification
Functionality Assessment
Operability Determination
Fire Protection Program
ML23306A1592 November 2023Enforcement Action EA-22-129 Inspection Readiness Notification
IR 05000259/20230402 November 2023Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment LetterCondition Adverse to Quality
ML23292A07919 October 2023Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency
ML23292A25318 October 2023BFN 2024-301, Corporate Notification Letter (210-day Ltr)
IR 05000327/202301116 October 2023Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011Hot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Emergency Lighting
Fire Protection Program
Fire Watch
ML23285A08812 October 2023Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31Aging Management
ML23284A42511 October 202310 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection ReportShutdown Margin
Anticipated operational occurrence
Temporary Modification
Incorporated by reference
FLEX
Fuel cladding
ML23283A27910 October 2023Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements ManualUnanalyzed Condition
Boric Acid
Time of Discovery
High winds
Shutdown Margin
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Functionality Assessment
Incorporated by reference
Pressure and Temperature Limits Report
Design basis earthquake
Operability Determination
Earthquake
Maintenance Rule Program