Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24032A476 | 1 February 2024 | Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve | |
ML24032A020 | 31 January 2024 | NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 | |
ML23319A245 | 29 January 2024 | Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML24023A280 | 23 January 2024 | Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump | |
CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | 17 January 2024 | Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | |
ML24018A014 | 17 January 2024 | Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 | |
ML24016A304 | 16 January 2024 | Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump | |
CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 | 11 January 2024 | Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 | EVT-1 |
IR 05000327/2023442 | 11 January 2024 | 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter | |
ML24011A316 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), August 2023 | |
ML24011A317 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), September 2023 | |
ML24011A320 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), December 2023 | |
ML24011A318 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), October 2023 | |
ML24011A319 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), November 2023 | |
ML24010A213 | 10 January 2024 | CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers | |
ML24018A095 | 4 January 2024 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 | |
ML24004A033 | 3 January 2024 | Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter | |
ML24004A040 | 3 January 2024 | Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation | |
ML23319A199 | 3 January 2024 | Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves | Incorporated by reference Surveillance Frequency Control Program |
ML24022A173 | 3 January 2024 | Receipt and Availability of the Subsequent License Renewal Application | |
ML23355A206 | 21 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 21 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) | 18 December 2023 | Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) | Safe Shutdown Anticipated operational occurrence |
ML23348A394 | 14 December 2023 | Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve | |
ML23346A122 | 12 December 2023 | Annual Non-Radiological Environmental Operating Report - 2023 | |
IR 05000259/2023010 | 11 December 2023 | Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 | Commercial Grade Dedication |
ML23335A072 | 1 December 2023 | Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump | |
ML23334A249 | 30 November 2023 | Site Emergency Plan Implementing Procedure Revision | |
CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan | 29 November 2023 | Submittal of Fifth 10-Year Interval Inservice Testing Program Plan | Safe Shutdown High Radiation Area Stroke time Anchor Darling Incorporated by reference Locked High Radiation Area FLEX B.5.b Scram Discharge Volume Large early release frequency Excess Flow Check Valve Power Operated Valves Grace period Weak link |
IR 05000327/2023420 | 28 November 2023 | Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 | Affidavit |
CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 27 November 2023 | Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
ML23331A253 | 27 November 2023 | Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions | |
ML23325A110 | 21 November 2023 | Anchor Darling Double Disc Gate Valve Commitment Revision | Anchor Darling |
ML23320A254 | 16 November 2023 | Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump | |
IR 05000259/2023003 | 13 November 2023 | Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 | Safe Shutdown High Radiation Area Stroke time Enforcement Discretion Coatings Temporary Modification Functionality Assessment FLEX Corrosion bonding Significance Determination Process Operability Determination Pressure Boundary Leakage Pressure boundary leak Through Wall Leak Fire Protection Program Fire Watch Hourly Fire Watch Substantial potential for overexposure Flow Induced Vibration Power Uprate Overexposure |
ML23324A436 | 9 November 2023 | Exam Corporate Notification Letter Aka 210-day Letter | |
ML23307A082 | 8 November 2023 | Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation | Exemption Request |
IR 05000327/2023003 | 3 November 2023 | Integrated Inspection Report 05000327/2023003 and 05000328/2023003 | Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
ML23306A159 | 2 November 2023 | Enforcement Action EA-22-129 Inspection Readiness Notification | |
IR 05000259/2023040 | 2 November 2023 | Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter | Condition Adverse to Quality |
ML23292A079 | 19 October 2023 | Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency | |
ML23292A253 | 18 October 2023 | BFN 2024-301, Corporate Notification Letter (210-day Ltr) | |
IR 05000327/2023011 | 16 October 2023 | Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 | Hot Short Safe Shutdown Fire Barrier Operator Manual Action Emergency Lighting Fire Protection Program Fire Watch |
ML23285A088 | 12 October 2023 | Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 | Aging Management |
ML23284A425 | 11 October 2023 | 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report | Shutdown Margin Anticipated operational occurrence Temporary Modification Incorporated by reference FLEX Fuel cladding |
ML23283A279 | 10 October 2023 | Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual | Unanalyzed Condition Boric Acid Time of Discovery High winds Shutdown Margin Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Functionality Assessment Incorporated by reference Pressure and Temperature Limits Report Design basis earthquake Operability Determination Earthquake Maintenance Rule Program |