Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G | 2 February 2024 | Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G | |
ML24032A476 | 1 February 2024 | Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve | |
ML24023A280 | 23 January 2024 | Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump | |
CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | 17 January 2024 | Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | |
ML24016A304 | 16 January 2024 | Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump | |
CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 | 11 January 2024 | Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 | EVT-1 |
ML23342A118 | 9 January 2024 | Independent Spent Fuel Storage Installation Security Inspection Plan | |
ML23334A201 | 3 January 2024 | Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements | |
ML24022A173 | 3 January 2024 | Receipt and Availability of the Subsequent License Renewal Application | |
ML23319A199 | 3 January 2024 | Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves | Incorporated by reference Surveillance Frequency Control Program |
IR 05000324/2023011 | 26 December 2023 | NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Aging Management License Renewal Fire Protection Program |
ML23355A206 | 21 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
L-23-019, Proof of Financial Protection 10 CFR 140.15 | 18 December 2023 | Proof of Financial Protection 10 CFR 140.15 | |
IR 05000324/2023402 | 14 December 2023 | Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 | |
ML23348A394 | 14 December 2023 | Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve | |
IR 05000259/2023010 | 11 December 2023 | Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 | Commercial Grade Dedication |
ML23335A072 | 1 December 2023 | Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump | |
ML23334A249 | 30 November 2023 | Site Emergency Plan Implementing Procedure Revision | |
ML23334A182 | 30 November 2023 | Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 | Safe Shutdown High winds High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Emergency Lighting Locked High Radiation Area Tornado-Generated Missile Aging Management Abnormal operational transient Design basis earthquake Annual Radiological Environmental Operating Report License Renewal Earthquake Control of Heavy Loads Accidental discharge Fire Protection Program Fire Watch Scaffolding |
CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan | 29 November 2023 | Submittal of Fifth 10-Year Interval Inservice Testing Program Plan | Safe Shutdown High Radiation Area Stroke time Anchor Darling Incorporated by reference Locked High Radiation Area FLEX B.5.b Scram Discharge Volume Large early release frequency Excess Flow Check Valve Power Operated Valves Grace period Weak link |
ML23331A253 | 27 November 2023 | Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions | |
CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 27 November 2023 | Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
ML23297A026 | 27 November 2023 | Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections | Coatings Incorporated by reference |
ML23325A110 | 21 November 2023 | Anchor Darling Double Disc Gate Valve Commitment Revision | Anchor Darling |
ML23320A254 | 16 November 2023 | Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump | |
ML23317A346 | 14 November 2023 | Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 | Fire Protection Program |
L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | 13 November 2023 | Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point | |
IR 05000259/2023003 | 13 November 2023 | Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 | Safe Shutdown High Radiation Area Stroke time Enforcement Discretion Coatings Temporary Modification Functionality Assessment FLEX Corrosion bonding Significance Determination Process Operability Determination Pressure Boundary Leakage Pressure boundary leak Through Wall Leak Fire Protection Program Fire Watch Hourly Fire Watch Substantial potential for overexposure Flow Induced Vibration Power Uprate Overexposure |
ML23311A112 | 9 November 2023 | Project Manager Assignment | |
ML23311A208 | 9 November 2023 | Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV | |
IR 05000259/2023040 | 2 November 2023 | Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter | Condition Adverse to Quality |
IR 05000298/2023003 | 2 November 2023 | Integrated Inspection Report 05000298/2023003 | Reactor Vessel Water Level Stroke time Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Earthquake Fire Protection Program Power change Downpower |
ML23306A099 | 2 November 2023 | and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) | |
IR 05000324/2023003 | 1 November 2023 | Integrated Inspection Report 05000324/2023003 and 05000325/2023003 | Commercial Grade Dedication Temporary Modification Functionality Assessment Operability Determination Fire Protection Program |
IR 05000298/2023401 | 1 November 2023 | Cyber Security Report 05000298/2023401 Public | Cyber Security Affidavit |
L-23-011, 10 CFR 72.48 Biennial Change Summary Report | 27 October 2023 | 10 CFR 72.48 Biennial Change Summary Report | |
ML23292A253 | 18 October 2023 | BFN 2024-301, Corporate Notification Letter (210-day Ltr) | |
IR 05000324/2023010 | 17 October 2023 | Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 | |
IR 05000325/2023401 | 16 October 2023 | Security Baseline Inspection Report 05000324 and 05000325 2023401 | |
ML23264A805 | 11 October 2023 | Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Cyber Security Safeguards Contingency Plan Fire Protection Program |
ML23282A002 | 6 October 2023 | Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump | |
ML23346A132 | 6 October 2023 | Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published | Pandemic COVID-19 Siren |
ML23278A012 | 5 October 2023 | Updated Final Safety Analysis Report, Amendment 30 | Fire Barrier Aging Management License Renewal Biofouling Fire Protection Program |
ML23271A170 | 28 September 2023 | Site Emergency Plan Implementing Procedure Revision | |
ML23270A070 | 26 September 2023 | SLRA Pre-Application Meeting Summary 09-13-2023 | Coatings Aging Management License Renewal |
ML23256A088 | 25 September 2023 | Issuance of Alternative to Steam Generator Welds | Hydrostatic Probabilistic Risk Assessment Incorporated by reference Finite Element Analysis |