NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages12 January 2024Report of Changes to Quality Assurance Program for Radioactive Material Packages
NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.1212 January 2024Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12
NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 2214 December 2023Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Abnormal operational transient
Fuel cladding
NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan4 December 2023Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness PlanSafe Shutdown
Health Physics Network
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Earthquake
Hardened vent
Siren
Overexposure
NRC-23-0073, Guarantee of Payment of Deferred Premiums29 November 2023Guarantee of Payment of Deferred Premiums
NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating13 October 2023Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating
NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.1212 October 2023Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12Safe Shutdown
Surveillance Frequency Control Program
NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating28 September 2023Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - OperatingSafe Shutdown
Ultimate heat sink
Tornado Missile
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Earthquake
Offsite Circuit
NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)11 September 2023Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)Ultimate heat sink
Enforcement Discretion
NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration31 August 2023Independent Spent Fuel Storage Installation Cask Registration
NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 202331 August 2023Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023
NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval31 August 2023Inservice Testing (IST) Program for the Fourth 10-Year Inspection IntervalSafe Shutdown
Cold shutdown justification
NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..30 August 2023Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..Ultimate heat sink
Maintenance Rule Program
NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)25 August 2023Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)Ultimate heat sink
Enforcement Discretion
FLEX
NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)25 August 2023Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)Ultimate heat sink
NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration23 August 2023Independent Spent Fuel Storage Installation Cask Registration
NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)10 August 2023Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)Safe Shutdown
Ultimate heat sink
Mission time
Fire Barrier
Tornado Missile
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
B.5.b
Large early release frequency
Earthquake
Hardened vent
NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration1 August 2023Independent Spent Fuel Storage Installation Cask Registration
NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)24 July 2023Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)Safe Shutdown
Ultimate heat sink
Mission time
Fire Barrier
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Large early release frequency
Hardened vent
Offsite Circuit
NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration27 June 2023Independent Spent Fuel Storage Installation, Cask Registration
NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance13 June 2023License Amendment Request for a Risk Informed Approach to ECCS Strainer PerformanceSafe Shutdown
Unanalyzed Condition
High winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Coatings
FLEX
Significance Determination Process
Seismically rugged
Foreign Material Exclusion
Large early release frequency
Exemption Request
Fuel cladding
Power change
NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)6 June 2023Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)Safe Shutdown
High winds
Packing leak
Ultimate heat sink
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Large early release frequency
Hardened vent
NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval5 June 2023Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection IntervalNon-Destructive Examination
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Aging Management
Scram Discharge Volume
Moisture barrier
Earthquake
Liquid penetrant
Dissimilar Metal Weld
NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval5 June 2023Snubber Program for the Fourth 10-Year Testing IntervalSafe Shutdown
High Radiation Area
Scaffolding
NRC-23-0037, 56542-EN 56542 - Fermi26 May 202356542-EN 56542 - Fermi
NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements16 May 2023Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance RequirementsMission time
NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.125 May 2023License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12Safe Shutdown
Surveillance Frequency Control Program
NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage5 May 2023License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) LeakageAnticipated operational occurrence
Nonconservative Technical Specifications
NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report28 April 2023Annual Radioactive Effluent Release Report and Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
Fuel cladding
NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report28 April 2023Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report
NRC-23-0018, Annual Non-Radiological Environmental Operating Report26 April 2023Annual Non-Radiological Environmental Operating Report
NRC-23-0024, Levels and Sources of Property Insurance Coverage3 April 2023Levels and Sources of Property Insurance Coverage
NRC-23-0021, ISFSI, Decommissioning Funding Plan Update30 March 2023ISFSI, Decommissioning Funding Plan UpdateDecommissioning Funding Plan
Authorized possession limits
License Renewal
Subsequent License Renewal
COVID-19
Fuel cladding
Power Uprate
NRC-23-0016, Decommissioning Funding Status Report30 March 2023Decommissioning Funding Status Report
NRC-23-0015, Decommissioning Funding Status Report for Fermi 130 March 2023Decommissioning Funding Status Report for Fermi 1
NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis7 March 2023License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt AnalysisSafe Shutdown Earthquake
Channel-control blade interference
NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements16 December 2022License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance RequirementsSafe Shutdown
Time of Discovery
Stroke time
Surveillance Frequency Control Program
Offsite Circuit
NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums29 November 2022DTE Electric Company - Guarantee of Payment of Deferred Premiums
NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 202217 November 2022Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022
NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report14 November 2022Submittal of Biennial Review of the Fermi 1 Safety Analysis Report
NRC-22-0041, Evacuation Time Estimate Report5 October 2022Evacuation Time Estimate ReportPandemic
Coronavirus
NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 202229 August 2022Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022
NRC-22-0030, Inservice Inspection Summary Report10 August 2022Inservice Inspection Summary Report
NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements4 August 2022Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
High Radiation Area
Stroke time
Water Inventory Control
Operating Basis Earthquake
Squib
Qualified Offsite Circuit
Surveillance Frequency Control Program
Excess Flow Check Valve
Control of Heavy Loads
Power Operated Valves
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Scaffolding
NRC-22-0022, Annual Non-Radiological Environmental Operating Report29 April 2022Annual Non-Radiological Environmental Operating Report
NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report29 April 2022Annual Radioactive Effluent Release Report and Radiological Environmental Operating ReportAnnual Radioactive Effluent Release Report
NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring28 April 2022Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring
NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report26 April 2022Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report
NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance4 April 2022Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance
NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report31 March 2022Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report