NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages | 12 January 2024 | Report of Changes to Quality Assurance Program for Radioactive Material Packages | |
NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | 12 January 2024 | Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | |
NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 | 14 December 2023 | Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 | Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Abnormal operational transient Fuel cladding |
NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan | 4 December 2023 | Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Safe Shutdown Earthquake Earthquake Hardened vent Siren Overexposure |
NRC-23-0073, Guarantee of Payment of Deferred Premiums | 29 November 2023 | Guarantee of Payment of Deferred Premiums | |
NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | 13 October 2023 | Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | |
NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | 12 October 2023 | Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | Safe Shutdown Surveillance Frequency Control Program |
NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | 28 September 2023 | Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | Safe Shutdown Ultimate heat sink Tornado Missile Enforcement Discretion Probabilistic Risk Assessment FLEX Earthquake Offsite Circuit |
NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 11 September 2023 | Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | Ultimate heat sink Enforcement Discretion |
NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration | 31 August 2023 | Independent Spent Fuel Storage Installation Cask Registration | |
NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 | 31 August 2023 | Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 | |
NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval | 31 August 2023 | Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval | Safe Shutdown Cold shutdown justification |
NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. | 30 August 2023 | Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. | Ultimate heat sink Maintenance Rule Program |
NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 25 August 2023 | Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | Ultimate heat sink Enforcement Discretion FLEX |
NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 25 August 2023 | Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | Ultimate heat sink |
NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration | 23 August 2023 | Independent Spent Fuel Storage Installation Cask Registration | |
NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 10 August 2023 | Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | Safe Shutdown Ultimate heat sink Mission time Fire Barrier Tornado Missile Internal Flooding Enforcement Discretion Probabilistic Risk Assessment FLEX B.5.b Large early release frequency Earthquake Hardened vent |
NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration | 1 August 2023 | Independent Spent Fuel Storage Installation Cask Registration | |
NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 24 July 2023 | Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | Safe Shutdown Ultimate heat sink Mission time Fire Barrier Internal Flooding Enforcement Discretion Probabilistic Risk Assessment FLEX Large early release frequency Hardened vent Offsite Circuit |
NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration | 27 June 2023 | Independent Spent Fuel Storage Installation, Cask Registration | |
NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance | 13 June 2023 | License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance | Safe Shutdown Unanalyzed Condition High winds Mission time Internal Flooding Probabilistic Risk Assessment Coatings FLEX Significance Determination Process Seismically rugged Foreign Material Exclusion Large early release frequency Exemption Request Fuel cladding Power change |
NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | 6 June 2023 | Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) | Safe Shutdown High winds Packing leak Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Large early release frequency Hardened vent |
NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval | 5 June 2023 | Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval | Non-Destructive Examination Weld Overlay Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination VT-2 Incorporated by reference Aging Management Scram Discharge Volume Moisture barrier Earthquake Liquid penetrant Dissimilar Metal Weld |
NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval | 5 June 2023 | Snubber Program for the Fourth 10-Year Testing Interval | Safe Shutdown High Radiation Area Scaffolding |
NRC-23-0037, 56542-EN 56542 - Fermi | 26 May 2023 | 56542-EN 56542 - Fermi | |
NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | 16 May 2023 | Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | Mission time |
NRC-23-0002, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | 5 May 2023 | License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | Safe Shutdown Surveillance Frequency Control Program |
NRC-23-0010, License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage | 5 May 2023 | License Amendment Request to Correct Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage | Anticipated operational occurrence Nonconservative Technical Specifications |
NRC-23-0017, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report | 28 April 2023 | Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Earthquake Chernobyl Fuel cladding |
NRC-23-0025, Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report | 28 April 2023 | Submittal of 2022 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report | |
NRC-23-0018, Annual Non-Radiological Environmental Operating Report | 26 April 2023 | Annual Non-Radiological Environmental Operating Report | |
NRC-23-0024, Levels and Sources of Property Insurance Coverage | 3 April 2023 | Levels and Sources of Property Insurance Coverage | |
NRC-23-0021, ISFSI, Decommissioning Funding Plan Update | 30 March 2023 | ISFSI, Decommissioning Funding Plan Update | Decommissioning Funding Plan Authorized possession limits License Renewal Subsequent License Renewal COVID-19 Fuel cladding Power Uprate |
NRC-23-0016, Decommissioning Funding Status Report | 30 March 2023 | Decommissioning Funding Status Report | |
NRC-23-0015, Decommissioning Funding Status Report for Fermi 1 | 30 March 2023 | Decommissioning Funding Status Report for Fermi 1 | |
NRC-23-0011, License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis | 7 March 2023 | License Renewal Commitment 7c: Transmittal of Core Plate Hold-Down Bolt Analysis | Safe Shutdown Earthquake Channel-control blade interference |
NRC-22-0026, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | 16 December 2022 | License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | Safe Shutdown Time of Discovery Stroke time Surveillance Frequency Control Program Offsite Circuit |
NRC-22-0051, DTE Electric Company - Guarantee of Payment of Deferred Premiums | 29 November 2022 | DTE Electric Company - Guarantee of Payment of Deferred Premiums | |
NRC-22-0052, Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 | 17 November 2022 | Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) Through EIE on November 9, 2022 | |
NRC-22-0046, Submittal of Biennial Review of the Fermi 1 Safety Analysis Report | 14 November 2022 | Submittal of Biennial Review of the Fermi 1 Safety Analysis Report | |
NRC-22-0041, Evacuation Time Estimate Report | 5 October 2022 | Evacuation Time Estimate Report | Pandemic Coronavirus |
NRC-22-0033, Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 | 29 August 2022 | Enrico Fermi Atomic Power Plant, Unit 1 - Annual Report for Period Ending June 30, 2022 | |
NRC-22-0030, Inservice Inspection Summary Report | 10 August 2022 | Inservice Inspection Summary Report | |
NRC-22-0023, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 4 August 2022 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level High Radiation Area Stroke time Water Inventory Control Operating Basis Earthquake Squib Qualified Offsite Circuit Surveillance Frequency Control Program Excess Flow Check Valve Control of Heavy Loads Power Operated Valves Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
NRC-22-0022, Annual Non-Radiological Environmental Operating Report | 29 April 2022 | Annual Non-Radiological Environmental Operating Report | |
NRC-22-0021, Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report | 29 April 2022 | Annual Radioactive Effluent Release Report and Radiological Environmental Operating Report | Annual Radioactive Effluent Release Report |
NRC-22-0020, Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring | 28 April 2022 | Enrico Fermi Atomic Power Plant, Unit No. 1 & Fermi 2 Power Plant - 10 CFR 20.2206 Report of Individual Monitoring | |
NRC-22-0003, Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report | 26 April 2022 | Submittal of 2021 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report | |
NRC-22-0019, Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance | 4 April 2022 | Submittal of the National Pollutant Discharge Elimination System Permit Application for Reissuance | |
NRC-22-0011, Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report | 31 March 2022 | Enrico Fermi Atomic Power Plant, Unit No. 1 - Decommissioning Funding Status Report | |