 Issue dateTitleTopic
DCL-24-010, Nuclear Material Transaction Report for New Fuel29 January 2024Nuclear Material Transaction Report for New Fuel
DCL-24-009, Nuclear Material Transaction Report for New Fuel17 January 2024Nuclear Material Transaction Report for New Fuel
DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application17 January 2024Schedule Considerations for Review of the DCPP License Renewal ApplicationLicense Renewal
DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b15 January 2024Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
DCL-23-129, Nuclear Material Transaction Report for New Fuel27 December 2023Nuclear Material Transaction Report for New Fuel
DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation14 December 2023Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation
DCL-23-128, Emergency Plan Update13 December 2023Emergency Plan UpdateEarthquake
Fuel cladding
Siren
DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 256 December 2023Core Operating Limits Report for Unit 1 Cycle 25
DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System16 November 2023Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System
DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System14 November 2023License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) SystemUltimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Coatings
Job Performance Measure
Large early release frequency
DCL-23-118, License Renewal Application7 November 2023License Renewal Application
DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)19 October 2023Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)
DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System13 October 2023Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System
DCL-23-092, Material Status Report for the Period Ending August 31, 202328 September 2023Material Status Report for the Period Ending August 31, 2023
DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors27 September 2023License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
Ultimate heat sink
Mission time
Tornado Missile
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
FLEX
Large early release frequency
Earthquake
Turbine Missile
DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff13 September 2023Upcoming Meeting with Nuclear Security and Incident Response Staff
DCL-23-078, Nuclear Material Transaction Report for New Fuel6 September 2023Nuclear Material Transaction Report for New Fuel
DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application16 August 2023Withdrawal of Request Regarding Senior Reactor Operator License ApplicationExemption Request
DCL-23-068, Nuclear Material Transaction Report for New Fuel9 August 2023Nuclear Material Transaction Report for New Fuel
DCL-23-066, Nuclear Material Transaction Report for New Fuel3 August 2023Nuclear Material Transaction Report for New Fuel
DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure27 July 2023Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure
DCL-23-064, Nuclear Material Transaction Report for New Fuel26 July 2023Nuclear Material Transaction Report for New Fuel
DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b13 July 2023License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High Radiation Area
Ultimate heat sink
Mission time
Stroke time
Tornado Missile
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Large early release frequency
Earthquake
Maintenance Rule Program
Power Operated Valves
Turbine Missile
Offsite Circuit
DCL-23-055, Nuclear Material Transaction Report for New Fuel6 July 2023Nuclear Material Transaction Report for New Fuel
DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 024 May 2023Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0Fitness for Duty
Non-Destructive Examination
Offsite Dose Calculation Manual
Commercial Grade Dedication
Nondestructive Examination
Cyber Security
Condition Adverse to Quality
FLEX
Process Control Program
Safeguards Contingency Plan
Fire Protection Program
Grace period
DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program22 May 2023Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program
DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 202222 May 202310 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022
DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule15 May 2023Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal ScheduleLicense Renewal
DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report1 May 20232022 Annual Nonradiological Environmental Operating Report
DCL-23-036, 2022 Annual Radiological Environmental Operating Report1 May 20232022 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Tritium
DCL-23-025, 2022 Annual Radioactive Effluent Release Report1 May 20232022 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Recently irradiated fuel
Tritium
Power change
DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report27 April 2023Submittal of Receiving Water Monitoring Program 2022 Annual Report
DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application24 April 2023Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application
DCL-23-028, Technical Specification Bases, Revision 1424 April 2023Technical Specification Bases, Revision 14
DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 202320 April 2023Report on Discharge Monitoring for the First Quarter of 2023Biofouling
DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 202219 April 2023Submittal of Annual Report of Occupational Radiation Exposure for 2022
DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System4 April 2023Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System
DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant29 March 20232023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant
DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 228 March 2023Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2Exemption Request
DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update23 March 2023Independent Spent Fuel Storage Installation, Emergency Plan UpdateSafe Shutdown
High winds
Offsite Dose Calculation Manual
Safeguards Contingency Plan
Earthquake
Pressure Boundary Leakage
Unidentified leakage
DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts17 March 2023Responses to NRC Questions Regarding License Renewal EffortsBoric Acid
Non-Destructive Examination
Coatings
Aging Management
License Renewal
Biofouling
Fire Protection Program
DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage22 February 2023Owner'S Activity Report for Unit 2 Twenty-Third Refueling OutageWeld Overlay
DCL-23-008, Request Regarding Senior Reactor Operator License Application22 February 2023Request Regarding Senior Reactor Operator License Application
DCL-2023-503, Annual Sea Turtle Report26 January 2023Annual Sea Turtle Report
DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring18 January 2023(DCPP) 4th Quarter 2022 Report on Discharge Self-MonitoringBiofouling
DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage20 December 2022Revised Steam Generator Tube Inspection Report for Twenty-First Refueling OutageNondestructive Examination
DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 2420 December 2022Core Operating Limits Report for Unit 2 Cycle 24Shutdown Margin
Coast down
DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application31 October 2022Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal ApplicationLicense Renewal
Exemption Request
Fuel cladding
DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 112 October 2022Site-Specific Decommissioning Cost Estimate, Revision 1Grab sample
Offsite Dose Calculation Manual
Coatings
Affidavit
DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 112 October 2022Post-Shutdown Decommissioning Activities Report, Revision 1Anticipated operational occurrence