Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | 13 March 2024 | and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications | Fuel cladding Stretch Power Uprate |
ML22013A317 | 12 January 2022 | Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil | |
ML22013A316 | 12 January 2022 | Trp 020 - St. Lucie SLRA Breakout Questions_Occw | License Renewal Subsequent License Renewal Biofouling |
ML22013A334 | 11 January 2022 | TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals | Stress corrosion cracking EVT-1 |
ML22013A307 | 11 January 2022 | Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq | Stress corrosion cracking |
ML22012A391 | 11 January 2022 | Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions | Aging Management |
ML22012A263 | 10 January 2022 | Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting | |
ML22010A097 | 7 January 2022 | Trp 038 Psl Internal Surfaces Breakout Questions - Allik | |
ML22010A100 | 7 January 2022 | Trp 033 Psl Selective Leaching Breakout Questions - Allik | Coatings |
ML21356A577 | 22 December 2021 | Slar Breakout Questions - Fire Protection Scoping and Screening | Fire Barrier Emergency Lighting Aging Management |
ML22013A292 | 21 December 2021 | Trp 41 St. Lucie SLRA - Breakout Questions | Aging Management Stress corrosion cracking Dissimilar Metal Weld |
ML22013A305 | 21 December 2021 | Trp 143.4 St Lucie SLRA - Breakout Questions HELB | High Energy Line Break |
ML22013A304 | 21 December 2021 | Trp 143.3 St Lucie SLRA - Breakout Questions EAF | Weld Overlay |
ML22013A303 | 21 December 2021 | Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue | Thermal fatigue |
ML22013A302 | 21 December 2021 | Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue | License Renewal |
ML22013A301 | 21 December 2021 | TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring | Boric Acid |
ML22013A297 | 21 December 2021 | Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural | Fire Protection Program |
ML22013A296 | 21 December 2021 | Trp 74 St. Lucie SLRA - Breakout Questions | Aging Management Integrated leak rate test |
ML22013A295 | 21 December 2021 | Trp 47 St. Lucie SLRA - Breakout Questions | Ultimate heat sink Aging Management |
ML22013A294 | 21 December 2021 | Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring | Fire Barrier |
ML22013A288 | 21 December 2021 | Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA | License Renewal |
ML22013A284 | 21 December 2021 | Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity | |
ML22013A282 | 21 December 2021 | SLRA - Breakoutt Questions Corrosion OE | |
ML21354A837 | 20 December 2021 | Trp 11 St. Lucie SLRA Breakout Questions | DM weld |
ML21351A241 | 17 December 2021 | Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik | Coatings |
ML21351A239 | 17 December 2021 | Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx | Coatings |
ML21351A238 | 17 December 2021 | Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 | Stress corrosion cracking |
L-2021-137, GL 2004-02 Debris Transport Calculation Non-Conservatism | 23 July 2021 | GL 2004-02 Debris Transport Calculation Non-Conservatism | Coatings |
L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table | 19 March 2018 | Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table | |
L-2016-109, Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information | 11 May 2016 | Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information | |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
ML15224B449 | 3 September 2015 | Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | FLEX Fukushima Dai-Ichi |
ML15236A076 | 3 September 2015 | Enclosure, Revised St Lucie Tables-LQ-W | |
ML15231A412 | 21 August 2015 | FPL St. Lucie Capture Summary 2015 | |
ML15231A417 | 21 August 2015 | Power Plant Causal Turtles | |
L-2015-093, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report | 24 March 2015 | Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report | Fuel cladding |
L-2014-340, RAI Reply - Fourth Ten-Year Interval Unit 2 Relief Request No. 4 | 6 November 2014 | RAI Reply - Fourth Ten-Year Interval Unit 2 Relief Request No. 4 | VT-2 Stress corrosion cracking |
L-2013-067, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2012 | 14 February 2013 | Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2012 | |
ML121450014 | 23 May 2012 | NFPA 805 LAR Status Matrix - May 2012 | |
ML12073A151 | 6 March 2012 | NRR E-mail Capture - St. Lucie Discharge Headwall Project | |
L-2010-096, Extended Power Uprate Data for NRC Confirmatory EPU Analyses | 4 June 2010 | Extended Power Uprate Data for NRC Confirmatory EPU Analyses | Loop seal Stroke time Power Uprate Exclusive Use Affidavit Overspeed |
L-2009-078, Extended Power Uprate Data for NRC Confirmatory EPU Analyses | 2 April 2009 | Extended Power Uprate Data for NRC Confirmatory EPU Analyses | Power Uprate |
L-2008-236, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses | 29 October 2008 | Extended Power Uprate, Data for NRC Confirmatory EPU Analyses | Power Uprate |
L-2008-178, Fourth Ten-Year Interval In-Service-Test Program Submittal RAI Reply to Relief Request PR-04 | 5 August 2008 | Fourth Ten-Year Interval In-Service-Test Program Submittal RAI Reply to Relief Request PR-04 | |
ML081050264 | 19 March 2008 | NDE Report, on PSL-1 Pressurizer Nozzles, Attachment 2 | |
ML080850647 | 19 March 2008 | NDE Report on PSL-1 Pressurizer Nozzles | Finite Element Analysis Stress corrosion cracking Operability Determination Dissimilar Metal Weld DM weld |
L-2008-018, Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results | 21 February 2008 | Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results | Weld Overlay |
L-2008-002, Corporate Merger of Decommissioning Trustee | 3 January 2008 | Corporate Merger of Decommissioning Trustee | |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML052660321 | 21 September 2005 | Tech Spec Pages for Amendment No. 196, Extension of the Reactor Coolant System Pressure/Temperature Curve Limits | Hydrostatic |