Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17229B0847 April 1999Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines.
ML17354B1899 November 1998Simulatory Certification Update 2.Shutdown Margin
Fuel cladding
ML17241A4931 November 1998Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project).
ML17354B01729 June 1998Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire.Safe Shutdown
Enforcement Discretion
Missed surveillance
ML17229A7204 May 1998Five Yr Population Estimates for Ten Mile Area Surrounding for St Lucie Plant.
ML17229A67727 March 1998Status Meeting.
ML17229A48622 September 1997Status Meeting.Boric Acid
Fitness for Duty
Loop seal
Fire Barrier
Coatings
ML17229A45214 August 1997Status Meeting for Units 1 & 2.Boric Acid
Fitness for Duty
Loop seal
Scaffolding
ML17229A42011 July 1997Status Meeting.Boric Acid
Fitness for Duty
Loop seal
Packing leak
ML17229A39017 June 1997Rev 0 to ER-97-010, Preliminary Waste Characterization of St Lucie Sgs.
ML17229A37029 April 1997Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 Nuclear Power Plant Using NUREG-0800 Std Review Plan Section 15.1.5, App a, Rev 1
ML20137K9612 April 1997Rev 0 to JPN-PSL-SENP-95-100, Letdown Pressure Controller PIC-2201 Set Pressure ReductionSafe Shutdown
ML20137L0162 April 1997Undated Rev 2 to JPN-PSL-SENP-95-101, Engineering Evaluation,Assessment of Effects on Plant Operation of Lifting LPSI Pump Discharge Header Thermal Relief Valve
ML20137K76125 March 1997Maint Rule Baseline Insp NotebookSafe Shutdown
Boric Acid
Stroke time
Probabilistic Risk Assessment
Systematic Assessment of Licensee Performance
Maintenance Rule Program
ML17229A24921 February 1997Status Meeting.Loop seal
Coatings
Scaffolding
Power change
ML17229A18418 December 1996Rev 1 to St Lucie Unit 1 Small Break LOCA Analysis w/30% SG Tube Plugging.Loop seal
ML20137M21217 December 1996Monthly Indicator Rept, Nov 1996Deep Dose Equivalent
ML17229A16911 December 1996Status Meeting on 961211.Coatings
Scaffolding
Power change
ML17229A09331 October 1996Analysis of Odscc/Iga at Tubesheet & Tube Support Locations at St Lucie Unit 1.
ML20137M92631 October 1996Monthly Indicator ReptMaintenance Rule Program
Deep Dose Equivalent
ML17229A09224 October 1996Steam Generator Run Time Analysis,Cycle 14, for St Lucie Unit 1Boric Acid
Non-Destructive Examination
Hydrostatic
Nondestructive Examination
Large early release frequency
Through-Wall Leak
ML20137K66418 October 1996Rev 1,Self Assessment for St Lucie NppPast operability
Foreign Material Exclusion
Systematic Assessment of Licensee Performance
ML17229A10217 October 1996Status Meeting on 961017.Loop seal
Coatings
Maintenance Rule Program
Pressure Boundary Leakage
Scaffolding
ML20137N19417 October 1996Monthly Indicator Rept, Sept 1996Maintenance Rule Program
Deep Dose Equivalent
ML17229A06130 September 1996Psl Self-Assessment.Past operability
Nondestructive Examination
Foreign Material Exclusion
Systematic Assessment of Licensee Performance
ML20137P44013 September 1996Rev 31 to St Lucie Plant Radiological Emergency PlanFitness for Duty
Finite Element Analysis
Minimum staff
Overexposure
ML20137K8034 September 1996Evaluation of Temporary Operating Configuration w/1B Main Transformer Out of Svc,For St Lucie Np,Unit 1
ML20137K8223 September 1996Evaluation of Temporary Operating Configuration w/1B Main Transformer Out of Svc,For St Lucie Np,Unit 1
ML17229A17927 August 1996Rev 0 to JPN-PSL-SEES-96-059, Engineering Evaluation of Application of Thermo-Lag to Meet Rg 1.75 Requirements.
ML20137L00922 August 1996Rev 0 to JPN-PSL-SEIP-96-067, Engineering Evaluation,Impact of Past Incorrect Calibration of S/G Level Transmitters on Low S/G Level Trip SetpointsSafe Shutdown
Hydrostatic
Coatings
Downpower
ML20137K94522 July 1996Rev 0 to JPN-PSL-SEMS-96-051, Engineering Evaluation,2B Charging Pump Seal Leakage Evaluation
ML20137N79128 June 1996Scoping Document for Implementation of Maint Rule for Monitoring Effectiveness of Maint on StructuresTime of Discovery
Ultimate heat sink
Fire Barrier
Coatings
Maintenance Rule Program
Scaffolding
Downpower
ML20137N20514 June 1996Monthly Indicator Rept, May 1996Deep Dose Equivalent
ML20137L38910 June 1996Rev 0 to JPN-PSL-SENS-96-039, 10CFR50.59 Safety Evaluation, Temporary Configuration for CEDMCS Cooling Sys & Encl
ML17228B50531 May 1996Chapter 15 Event Review & Analysis for 30% SG Tube Plugging.Shutdown Margin
Anticipated operational occurrence
ML20137L35924 May 1996Rev 1 to JPN-PSL-SEIS-96-028, Safety Evaluation,Wide Range Ni Temporary Sys Alteration
ML20137N21114 May 1996Monthly Indicator Rept, Apr 1996
ML20137L22611 May 1996Rev 2 to JPN-PSL-SEFJ-96-020, Safety Evaluation,Refueling Equipment Underload & Overload Settings
ML20137L2058 May 1996Rev 1 to JPN-PSL-SEFJ-96-020, Engineering Evaluation, Refueling Equipment Underload & Overload Settings
ML20137L19129 April 1996Rev 0 to JPN-PSL-SEFJ-96-020, Engineering Evaluation, Refueling Equipment Underload & Overload Settings
ML17228B47818 April 1996Plant,Status Meeting for Units 1 & 2.Boric Acid
ML20137N22017 April 1996Monthly Indicator Rept, Mar 1996Deep Dose Equivalent
ML17354A2847 April 1996Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 941114-960407.Safe Shutdown
Boric Acid
Time of Discovery
Ultimate heat sink
Stroke time
Coatings
Emergency Lighting
Operability Determination
Through-Wall Leak
Dissimilar Metal Weld
Operability Assessment
Power Uprate
ML17353A63431 March 1996Rev 0 to JPN-PTN-SEFJ-96-015, Control Rod Operability Evaluation as Result of Incomplete Rod Insertion at Other Westinghouse Plants.Shutdown Margin
Fuel cladding
ML20137N34329 March 1996Rev 0 to JPN-PSL-SEMS-96-007, 10CFR50.59 Safety Evaluation for Addition of Three Manual Isolation Valves within Rcgvs Process Vent LinesAnchor Darling
Power Operated Valves
ML20137N23819 March 1996Monthly Indicator Rept, Feb 1996Deep Dose Equivalent
ML17228B43815 March 1996Status Meeting for Units 1 & 2.Boric Acid
Fitness for Duty
ML20137L3465 March 1996Rev 3 to JPN-PSL-SEFJ-95-023, Safety Evaluation for 1995 Boraflex Blackness Testing ResultsShutdown Margin
ML20137L05522 February 1996Impact of Past Incorrect Calibration of SG Levels of Afas Setpoints,Rev 0. Actual Rept Number JPN-PSL-SEIP-96-068 Rev 0Fitness for Duty
ML20137R31715 February 1996Rev 0 to JPN-PSL-SENS-96-003, 10CFR50.59 Safety Evaluation for Chemical & Volume Control System Operation