Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23232A001 | 19 August 2023 | Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 | |
ML19308B412 | 28 October 2019 | CFR 50.54(q)(5) Procedure Change Summary Analysis | Safe Shutdown Health Physics Network High Radiation Area Grab sample Offsite Dose Calculation Manual Met Tower Operating Basis Earthquake Nuclear Accident Reporting System Emergency Lighting B.5.b Scram Discharge Volume Severe Accident Management Guideline Earthquake Deep Dose Equivalent Hardened vent Fuel cladding Minimum staff Fire Protection Program Grace period Power change Siren Affidavit |
ML19162A175 | 6 June 2019 | 10 CFR 50.54(q)(5) Procedure Change Summary Analysis | Safe Shutdown Fitness for Duty Health Physics Network High Radiation Area Grab sample Offsite Dose Calculation Manual Met Tower Nuclear Accident Reporting System Emergency Lighting B.5.b Severe Accident Management Guideline Earthquake Deep Dose Equivalent Hardened vent Fuel cladding Minimum staff Fire Protection Program Scaffolding Grace period Power change Siren Overexposure Affidavit |
ML18065A204 | 6 March 2018 | Co., Emergency Plan Revision Summary Analysis and Revision 29 to EP-AA-1000, Exelon Nuclear Standardized Radiological Emergency Plan. | Safe Shutdown Fitness for Duty Health Physics Network High Radiation Area Offsite Dose Calculation Manual Met Tower Nuclear Accident Reporting System Severe Accident Management Guideline Earthquake Deep Dose Equivalent Fuel cladding Minimum staff Fire Protection Program Grace period Power change Siren |
ML18024A476 | 11 January 2018 | Attachments 1-4: 10CFR50.54(q)(5) Procedure Change Summary Analysis, EP-AA-1007, Rev. 33, EP-AA-1008, Rev 30 and EP-AA-1012, Rev. 4 | Safe Shutdown Health Physics Network High Radiation Area Grab sample Operating Basis Earthquake Severe Accident Management Guideline Earthquake Hardened vent Minimum staff Inadvertent Siren Activation Siren Exclusive Use Affidavit |
ML18024A474 | 11 January 2018 | Submittal of Radiological Emergency Plan Annex Revisions | |
ML17271A178 | 21 September 2017 | Radiological Emergency Plan Annex and Addendum Revisions | Safe Shutdown High winds Ultimate heat sink Grab sample Fire Barrier Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Nuclear Accident Reporting System Emergency Lighting Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program |
ML17041A292 | 1 February 2017 | Revision 32 to EP-AA-1007, Radiological Emergency Plan Annex and 10 CFR 50.54(q)(5) Procedure Change Summary Analysis | Nuclear Accident Reporting System Hardened vent Siren |
ML17037D200 | 1 February 2017 | Revision 32 to EP-AA-1007, Radiological Emergency Plan Annex | |
ML16267A460 | 14 September 2016 | Submittal of Revision 4 to Radiological Emergency Plan EP-AA-1007, Addendum 3 | |
ML16190A385 | 8 July 2016 | EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure | Safe Shutdown Health Physics Network Ultimate heat sink FLEX Severe Accident Management Guideline Minimum staff |
ML16049A259 | 11 February 2016 | EP-AA-1007, Addendum 3, Revision 3, Emergency Action Levels for Pbaps. | Safe Shutdown High winds Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Earthquake Fuel cladding Pressure Boundary Leakage |
ML16028A172 | 14 January 2016 | EP-AA-1007, Addendum 3, Revision 2, Emergency Action Levels for Pbaps. | Safe Shutdown High winds Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Operating Basis Earthquake Operator Manual Action Earthquake Fuel cladding Pressure Boundary Leakage |
RS-15-327, Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form. | 15 December 2015 | Company Submittal of Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form. | |
RA-15-112, Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390) | 15 December 2015 | Company - Attachment 3 - Radiological Emergency Plan Implementing Procedure EP-AA-112-F-01, Revision G, Command and Control Turnover Briefing Form (Exelon Confidential/Proprietary Information Withhold Under 10 CFR 2.390) | |
RA-13-066, Standardized Radiological Emergency Plan Implementing Procedure Revisions | 25 July 2013 | Standardized Radiological Emergency Plan Implementing Procedure Revisions | |
ML14311A575 | 18 July 2013 | Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions | |
ML14311A643 | 18 July 2013 | Exelon Nuclear Standardized Radiological Emergency Plan Implementing Procedure Revisions. (Version ML13200A124) | |
RA-10-087, Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation | 11 November 2010 | Revision F to Emergency Plan Procedure EP-AA- 112-100-F-07, Mid-Atlantic ERO Notification or Augmentation | |
ML090970291 | 2 April 2009 | Revision D to Emergency Plan Implementing Procedure EP-AA-113-F-08, PBAPS Assembly, Accountability and Evacuation Guidelines | |
ML082380247 | 18 August 2008 | Submittal of Radiological Emergency Preparedness Exercise Final Report for 04/22/2008 | |
ML033300286 | 17 November 2003 | Stations, Revised Emergency Plan Implementing Procedures | |
ML033070194 | 24 October 2003 | to EP-AA-112-401, Nuclear Duty Officer (Ndo). | |
RS-03-184, Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery. | 19 September 2003 | Revised Procedures, Including, EP-AA-111, Emergency Classification and Protective Action Recommendations, and EP-AA-115, Termination and Recovery. | Earthquake |
ML032591165 | 5 September 2003 | EP-MA-110-200, Revision 3, Dose Assessment. | Met Tower |
ML032020444 | 14 July 2003 | Transmittal of Revised Emergency Plan Procedures EP-MA-110-100, Revision 2 & EP-MA-114-100, Revision 4 for Peach Bottom, Units 2 & 3, Limerick Generating, Units 1 & 2 and Three Mile Island, Unit 1 | High winds Nuclear Accident Reporting System Earthquake |
ML031960129 | 2 July 2003 | EP-AA-1007, Revision 7, Exelon Nuclear Radiological Emergency Plan Annex | Safe Shutdown Unanalyzed Condition High winds Packing leak Ultimate heat sink Grab sample Internal Flooding Hydrostatic Operating Basis Earthquake Safeguards Contingency Plan Earthquake Deep Dose Equivalent Hardened vent Fuel cladding Pressure Boundary Leakage Grace period Power change Unidentified leakage Siren |
ML031740344 | 16 June 2003 | Transmittal of Revised Emergency Plan Procedures for Peach Bottom Units 2 & 3, Limerick Units 1 & 2 and Three Mile Island Unit 1 | Fitness for Duty Earthquake |
ML031550046 | 28 May 2003 | EP-MA-114-100, Revision 3, Marog Notifications | Earthquake |
ML030940275 | 26 March 2003 | Submittal of EP-AA-1007, Revision 5, Exelon Nuclear Radiological Emergency Plan Annex, for Peach Bottom Atomic Power Station, Units 2 & 3 | Safe Shutdown Unanalyzed Condition High winds Reactor Vessel Water Level Packing leak Ultimate heat sink Grab sample Internal Flooding Hydrostatic Operating Basis Earthquake Safeguards Contingency Plan Battery sizing Earthquake Deep Dose Equivalent Hardened vent Fuel cladding Pressure Boundary Leakage Minimum staff Grace period Power change Unidentified leakage Siren |
ML023310204 | 21 November 2002 | EP-MA-110-200, Revision 1, Dose Assessment. | Met Tower Fuel cladding |
ML022680339 | 19 September 2002 | Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2, Operations Support Center Activation and Operation - Attachment 8 | Safe Shutdown Fitness for Duty Health Physics Network High Radiation Area Nuclear Accident Reporting System Minimum staff |
ML022680294 | 19 September 2002 | Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2, Attachments 1 - 7 | Met Tower Earthquake Fuel cladding |
ML022680284 | 19 September 2002 | Transmittal of Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2 | |
ML022680480 | 19 September 2002 | Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2, Public Information Organization Activation and Operations - Attachment 7 | Fitness for Duty Nuclear Accident Reporting System |
ML022680309 | 19 September 2002 | Emergency Plan Procedure Revisions for Peach Bottom, Units 2 & 3 and Limerick, Units 1 & 2, Control Room Operations - Attachment 4 | Safe Shutdown Health Physics Network High Radiation Area Nuclear Accident Reporting System Severe Accident Management Guideline Minimum staff |
ML021830582 | 20 June 2002 | Emergency Response Procedures, Including ERP-620, Rev 13; ERP-205, Rev 11; ERP-200, Appendix 1, Rev 6; ERP-140, Rev 20 & ERP-110, Appendix 1, Rev 58 | Fitness for Duty High Radiation Area |
ML020860152 | 12 March 2002 | Transmittal of Emergency Response Procedure ERP-130, Revision 19, Site Evacuation for Peach Bottom Atomic Power Station Units 2 & 3 | |
ML020770195 | 27 February 2002 | Submittal of Emergency Response Procedure ERP-640, Revision 7, from Peach Bottom Units 2 & 3 | |
ML020460320 | 5 February 2002 | ERP-101, Revision 23, Classification of Emergencies, and ERP-101 Bases, Revision 3, PBAPS EAL Technical Basis Manual. | Safe Shutdown High winds Reactor Vessel Water Level Packing leak Ultimate heat sink Offsite Dose Calculation Manual Internal Flooding Operating Basis Earthquake Safeguards Contingency Plan Battery sizing Earthquake Deep Dose Equivalent Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage |