Text

Exelkn.

Exelon Nuclear www.exeloncorp.com Nuclear 2oo Exelon Way Kennett Square, PA 19348 10CFR50, Appendix E March 12,2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 & 3 Facility Operating License Nos. DPR-44 and 56 Docket Nos. 50-277 and 278

Subject:

ERP-1 30, Revision 19, "Site Evacuation" Enclosed is the subject procedure revision to the Emergency Response Procedures (ERPs) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. This procedure is required to be submitted within thirty (30) days of its revision in accordance with 1 OCFR50, Appendix E, and 10CFR50.4.

Also enclosed is a copy of a computer generated report index identifying the latest revisions of the PBAPS ERPs.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, M. P. Gallagher Director, Licensing & Regulatory Affairs Mid-Atlantic Regional Operating Group Attachments cc:

H. J. Miller, Administrator, Region I, USNRC (w/ Enclosures - 2 copies)

A. C. McMurtray, USNRC Senior Resident Inspector, PBAPS (w/ Enclosures

ATTACHMENT 1 PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 & 3 Docket Nos.

License Nos.

50-277 50-278 DPR-44 DPR-56 EMERGENCY RESPONSE PROCEDURE ERP-130, "Site Evacuation" Revision 19

Jh,3/0,2ERP-130 Rev. 19 Page 1 of 7 CGH/aa EXELON NUCLEAR PEACH BOTTOM UNITS 2 AND 3 EMERGENCY RESPONSE PROCEDURE ERP-130 SITE EVACUATION 1.0 RESPONSIBILITIES 1.1 The Emergency Director (ED) is responsible for directing the use of this procedure.

1.2 Control Room Licensed Operators are responsible for notifying plant personnel via the evacuation siren, public address system, and plant radio system.

1.3 All non-essential personnel are responsible for evacuating the site and proceeding to the designated off-site assembly area as directed.

1.4 Emergency response personnel are responsible for reporting to their assigned facilities.

1.5 The Security Team is responsible for accountability of personnel; and access control during the evacuation.

1.6 Health Physics personnel, as assigned by the Health Physics Team Leader (HPTL),

are responsible for establishing and operating the vehicle and evacuee monitoring and decontamination stations.

2.0 INITIAL ACTIONS NOTE ATTACHMENT 1, "SITE EVACUATION FLOW CHART",

may be used as a guide for the following actions.

2.1 The ED shall:

NOTE Evacuation should be initiated early/delayed or alternate assembly areas and routes designated, if based on input from Station Security and the Shift Manager/Emergency Director's judgment, designated assembly areas and designated evacuation routes are not accessible or implementation of site accountability would place station personnel at risk due to an on-going security threat.

ERP-130, Rev.

19 Page 2 of 7 2.1.1 If a Security threat exists, contact the Supervisor-Nuclear Security or the Security Team Leader (STL) to determine if evacuation should be initiated early/delayed or alternate assembly areas and evacuation routes designated.

2.1.2 Designate an assembly area while taking into consideration radiological conditions, weather conditions, security threats, and any other emergency conditions.

(Suggested assembly areas are the North Sub Station if wind is from North through West OR Unit 1 if wind is from South through East) (refer to site evacuation map on the flow chart attachment).

2.1.3 Notify the on shift Health Physics Supervisor or the HPTL of impending site evacuation and location of the assembly area.

2.1.4 Notify the Supervisor - Nuclear Security or the Security Team Leader (STL) of impending site evacuation and location of the assembly area.

2.1.5 Direct a Control Room Licensed Operator to make the site evacuation announcements.

2.1.6 Complete Attachment 2, "Site Evacuation Notification Form", and delegate notifications to Pennsylvania Emergency Management Agency (PEMA) and Maryland Emergency Management Agency (MEMA).

NOTE Section 2.2 should be completed in quick succession to avoid confusing plant personnel.

2.2 The Control Room Licensed Operator, when directed by the ED, shall:

2.2.1 Activate the Page Alert Tone and make the announcements over the PLANT PUBLIC ADDRESS SYSTEM twice, in a clear and distinct voice:

THIS (IS)

(IS NOT) A DRILL.

THIS (IS)

(IS NOT) A DRILL.

ATTENTION ALL PERSONNEL.

THIS IS A SITE EVACUATION NOTIFICATION.

ALL NON-ESSENTIAL PERSONNEL EVACUATE TO (North Sub Station or Peach Bottom Unit 1)

K>

ALL MEMBERS OF THE EMERGENCY RESPONSE ORGANIZATION REPORT TO YOUR EMERGENCY RESPONSE FACILITY.

THIS (IS)

(IS NOT) A DRILL.

THIS (IS)

(IS NOT) A DRILL.

ERP-130, Rev.

19 Page 3 of 7 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.3 Plant persor 2.3.1 2.3.2 2.3.3 2.3.4 Sound EVACUATION ALARM.

2.2.2.1 Rotate the "Evacuation Alarm/MIC Selector" Switch #43 on Diesel Generator Panel 00C026B to switch Position 6 (plant).

2.2.2.2 Sound the evacuation siren by pulling the handle OUT to activate.

2.2.2.3 Sound siren for 60-65 seconds.

2.2.2.4 Push switch #43 on Diesel Generator Panel 00C026B IN.

Repeat announcement over the PLANT RADIO SYSTEM (all channels known to be in use) twice, as stated above.

Announce event over the POND PAGING SYSTEM as follows:

2.2.4.1 Rotate the "Evacuation Alarm/MIC Selector" switch #43 on the Diesel Generator Panel 00C026B while in the IN mode to Position 2 (microphone river speakers).

2.2.4.2 Activate the microphone by pulling the handle OUT.

2.2.4.3 Repeat the evacuation announcement twice over the POND PAGING SYSTEM.

2.2.4.4 Push switch #43 on Diesel Generator Panel IN.

Repeat Steps 2.2.1 through 2.2.4.

Verify circuit breakers 20Y034-15 and 20Y033-10 are closed.

personnel (except designated emergency response nel) shall:

Exit site through the Guardhouse according to instructions of Security personnel.

Deposit security badge and dosimetry as directed.

Follow routes to the off-site assembly area as directed by Security Team members.

Follow instructions of Vehicle and Evacuee Control Group members upon arrival at the assembly area.

I

ERP-130, Rev.

19 Page 4 of 7 2.3.5 Await further instructions on returning to the plant or proceeding home.

2.4 Emergency response personnel shall proceed to their designated emergency response facility and card-in or log-in.

3.0 CONTINUING ACTIONS None 4.0 FINAL CONDITIONS 4.1 Emergency has been terminated and personnel are instructed by the ED or Shift Management to return to their normal duty station; or 4.2 Personnel and vehicles have been checked for contamination and are released.

5.0 ATTACHMENTS AND APPENDICES 5.1, "Site Evacuation Flow Chart" 5.2,

"Site Evacuation Notification Form" 6.0 SUPPORTING INFORMATION 6.1 PURPOSE To define the actions required to be performed during a site evacuation.

6.2 CRITERIA FOR USE 6.2.1 This procedure shall be implemented when in the judgment of Shift Management or the Emergency Director, the health and safety of on site personnel warrants a full site evacuation.

6.2.2 Shift Management or the Emergency Director may wish to direct a site evacuation if:

a.

A Site Area Emergency or General Emergency has been declared, OR

b.

Conditions such as smoke, fire, uncontrolled toxic materials, or flooding preclude habitation of large portions of the site, OR

ERP-130, Rev. 19 Page 5 of 7

c.

Airborne radioactivity outside the plant, but within the security fence, is greater than 1 N9 pc/cc unidentified.

6.2.3 Evacuation should be initiated early/delayed or alternate assembly area routes designated, if based on input from Station Security and the Shift Manager/Emergency Director's judgment, designated assembly areas and designated evacuation routes are not accessible or implementation of site accountability would place station personnel at risk due to an on-going security threat.

6.3 REFERENCES

6.3.1 Nuclear Emergency Plan 6.3.2 NUREG-0654 FEMA-REP-1, Rev.

1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" 6.4 COMMITMENT ANNOTATION None

ERP-130, Rev.

19 Page 6 of 7 SITE EVACUATION EMERGENCY DIRECTOR DESIGNATE SSETMBLY AREA NOR1H SUWSTATION OR PEACH 6o01rCM UWff ONE ATTACHMENT I SITE EVACUATION FLOW CHART

\\CONTROL ROOM LICENSED A NNtOUNCE SITE EVACUATION ON P SACTIVATE EVACUATION SIRE S

  • I A SYSTEM EINS NOTIFY IP SUNERVISOR OR TLAN ICE SITE EVACUATION ON RADIO SYSTEM NOTIFY SUPERVISOR - NUCLEAR SECURITY M4N0I, CE SITE EVACUATION ON POND PAGING SYSTEM REPEAT ANNOUtNEMENTS AND SIRENS DIRECT CONTROL ROOM OPERATOR TO MAKE ANNOUNCEMIENTS AN SOUNLD SIREN I VERIFY BREAKERS CLOSED-20Y034-1 AND 20Y033-10 I

COMPLETE ATTACHMENT 2 AND DELEGATE NOTIFICATIONS TO PEMA AND MEMA U1E FOLLOWING ACTIONS W1LL BE TAKEN BY EACH GROUP WHEN SITE EVACU'%ATION IS ORDERED E

SITE EVACUATION MAP N

NORTH SUB STATION 0

MAIN STACK s 0 I REPORT TO EXI PLANT PER IDESIGNATED FACILITY

[SECURITY FNTUCIN DEPOSIT BADGE DEDOSIMETRY CARD IN OR LOG 1N AS DIRECTED ROUTETO FOLLOW INSTRUCTIONS OF VEHICLE & EVACUEE CONTROL GROUP T

TO pI.ArTOIRGO HOMEER13 PARKING LOT

ERP-130, Rev.

19 Page 7 of 7 ATTACHMENT 2 SITE EVACUATION NOTIFICATION FORM NOTE NOTIFY THE FOLLOWING TWO (2)

AGENCIES OF A SITE EVACUATION.

1. Maryland Emergency Management Agency (MEMA) 9-1-410-517-3600 or Emergency ext. 205, 8 a.m. to 5 p.m. or ext. 213 after 5 p.m.
2. Pennsylvania Emergency Management Agency (PEMA) 9-1-800-424-7362 or Emergency ext. 216 M THIS IS A DRILL D THIS IS NOT A DRILL This is the Peach Bottom Atomic Power Station.

My name is My phone number is (717) 456 -

or Emergency ext.

The Emergency Director has declared a Site Evacuation at (time) on (date)

Reason for Site Evacuation:

Site personnel are evacuating to:

(North Sub Station OR Peach Bottom Unit 1)

There IS E--

IS NOT a Radioactive Release in Progress.

NOTIFICATION COMPLETE:

MEMA (Person notified)

(Time)

(Date)

PEMA (Person notified)

(Time)

(Date)

ATTACHMENT 2 PEACH BOTTOM POWER STATION, UNITS 2 & 3 Docket Nos.

License Nos.

50-277 50-278 DPR-44 DPR-56 EMERGENCY RESPONSE PROCEDURES REPORT INDEX

PEACH BOTTOM ATOMIC POWER STATION PROCEDURE INDEX REPORT:

FAC PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB DOC TYPE PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC TYPE ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP PROCEDURE NUMBER ERP-C-1000 ERP-C-1000-1 ERP-C-1000-2 ERP-C-1000-3 ERP-C-1000-4 ERP-C-1000-5 ERP-C-1100 ERP-C-1200 ERP-C-1200-1 ERP-C-1200-2 EXH ERP-C-1200-3 ERP-C-1200-4 ERP-C-1210 ERP-C-1250 ERP-C-1250-1 ERP-C-1250-2 ERP-C-1250-3 ERP-C-1250-4 ERP-C-1300 ERP-C-1300-1 ERP-C-1300-2 ERP-C-1300-3 ERP-C-1300-4 ERP-C-1300-5 ERP-C-1300-6 ERP-C-1300-7 ERP-C-1300-8 ERP-C-1300-9 ERP-C-1310 ERP-C-1310-1 ERP-C-1310-2 ERP-C-1310-3 ERP-C-1310-4 ERP-C-1320 ERP-C-1320-1 ERP-C-1320-2 ERP-C-1320-3 ERP-C-1400 ERP-C-1400-1 ERP-C-1410 ERP-C-1410-1 ERP-C-1410-2 CURR REV NBR 0006 0004 0003 0000 0000 0000 0003 0011 0000 0000 0000 0000 0002 0004 0000 0002 0000 0000 0010 0004 0000 0004 0000 0001 0002 0000 0000 0001 0003 0000 0000 0000 0000 0007 0002 0001 0002 0005 0002 0002 0000 0001 3/12/2002 PAGE "r ýo

.- ~

TITLE EMERGENCY OPERATIONS FACILITY (EOF)

ACTIVATION/DECACTIVATION EOF ACTIVATION CHECKLIST EOF DEACTIVATION CHECKLIST EOF BUSINESS HOURS FIRST RESPONDER CHECKLIST EOF AFTER HOURS FIRST RESPONDER CHECKLIST MINIMUM STAFFING POSITIONS NECESSARY TO ACTIVATE THE EOF EOF STAFF AUGMENTATION-CANCELLED -

REPLACED BY ERP-C-1250 EMERGENCY REPSONSE MANAGER EMERGENCY RESPONSE MANAGER TURNOVER/BRIEFING FORM PROTECTIVE ACTION RECOMMENDATION WORKSHEET CANCELLED REPLACED BY ERP-C-1200 ERM PAR DELIVERY CHECKLIST MINIMUM STAFFING POSITIONS NECESSARY TO ACTIVATE THE EOF ASSISTANT EMERGENCY RESPONSE MANAGER (AERM)

CANCELLED -

REPLACED BY ERP-C-1200 EMERGENCY PREPAREDNESS COORDINATOR/EOF EMERGENCY POWER INSTRUCTIONS EMERGENCY PREPAREDNESS COORDINATOR INSTRUCTIONS FOR ASPEN BACKUP NOTIFICATION SYSTEM EMERGENCY PREPAREDNESS COORDINATOR INSTRUCTIONS TO STOP STAFFING EMERGENCY PREPAREDNESS COORDINATOR INSTUCTIONS FOR SYSTEM RESET EMERGENCY OPERATIONS FACILITY (EOF)

DOSE ASSESSMENT TEAM LEADER DOSE ASSESSMENT TEAM LEADER (DATL)

INITIAL ACTIONS DOSE ASSESSMENT TURNOVER LIST PROTECTIVE ACTION RECOMMENDATION WORKSHEET OFFSITE SAMPLE ANALYSIS REQUESTS DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARS)

DOSE ASSESSMENT GROUP MEMBER (DAGM)

INITIAL ACTIONS OBTAINING EPDS MET/RAD DATA USE OF MODE A/MODE B OF CDM OBTAINING MET DATA FROM NATIONAL WEATHER SERVICE EMERGENCY OPERATIONS FACILITY (EOF)

DOSE ASSESSMENT GROUP CANCELLED -

REPLACED BY ERP-C-1300 DOSE ASSESSMENT GROUP LEADER INITIAL ACTIONS CANCELLED REPLACED BY ERP-C-1300 OBTAINING MET DATA FROM NATIONAL WEATHER SERVICE CANCELLED REPLACED BY ERP-C-1300 OBTAINING EPDS MET/RAD DATA -

CANCELLED NO REPLACED BY ERP-C-1300 USE OF MODE A/MODE B OF CDM CANCELLED -

REPLACED BY ERP-C-1300 EMERGENCY OPERATIONS FACILITY (EOF)

FIELD SURVEY GROUP LEADER FIELD SURVEY GROUP LEADER INITIAL ACTIONS FIELD SURVEY GROUP LEADER TURNOVER SHEET FIELD SURVEY GROUP LEADER DATA SHEET ENGINEERING SUPPORT TEAM ENGINEERING SUPPORT TEAM CHECKLIST CORE DAMAGE ASSESSMENT RADIOLOGICAL DATA HYDROGEN CONCENTRATION DATA EFFECTIVE DATE 06/25/11 06/25/01 04/21/99 04/21/99 04/21/99 06/25/01 09/14/94 06/25/01 09/14/94 10/24/95 04/03/00 03/30/01 10/24/95 06/25/01 09/14/94 05/11/01 09/14/94 09/14/94 08/31/00 06/25/01 09/23/94 03/30/01 09/23/94 11/02/98 06/25/01 03/26/97 03/26/97 09/12/97 03/26/97 03/26/97 03/24/97 03/26/97 03/26/97 08/31/00 04/10/98 03/26/97 08/31/00 06/25/01 11/02/98 09/09/98 09/14/94 09/09/98 RESP SYSTEM GROUP NBR PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE I

PEACH BOTTOM ATOMIC POWER STATION PROCEDURE INDEX REPORT:

DOC FAC TYPE PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PB PROC PROC TYPE ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP APP APP APP APP APP APP APP APP APP APP APP APP APP APP APP APP APP 1

2 3

4 5

6 7

9 9

1 2

3 4

5 6

7 a

PROCEDURE NUMBER ERP-C-1410-3 ERP-C-1410-4 ERP-C-1410-5 ERP-C-1410-6 ERP-C-1500 ERP-C-1500-1 ERP-C-1500-2 ERP-C-1900 ERP-C-1900-1 ERP-C-1900-2 ERP-C-1900-3 ERP-C-1900-4 ERP-C-1900-5 ERP-101 ERP-101 BASES ERP-110 ERP-110 APP 1 ERP-110 APP 2 CURR REV NBR 0001 0000 0002 0002 0006 0001 0001 0004 0000 0002 0002 0002 0002 0023 0003 0013 0057 0024 0002 0019 0019 0019 0022 0022 0015 0014 0013 0017 0009 0011 0017 0005 0005 0004 0004 0005 0001 0000 0000 TITLE CONTAINMENT RADIATION MONITOR DATA METAL WATER REACTION -

CANCELLED NO REPLACEMENT PERCENT OF FUEL INVENTORY AIRBORNE IN THE CONTAINMENT VS.

APPROXIMATE SOURCE AND DAMAGE ESTIMATE PROCEDURES FOR ESTIMATING FUEL DAMAGE BASED ON MEASURED 1-131 AND XE-133 CONCENTRATIONS LOGISTICS SUPPORT TEAM MESSAGE AND INFORMATION INSTRUCTIONS HELICOPTER LANDING INFORMATION RECOVERY PHASE IMPLEMENTATION RECOVERY PHASE IMPLEMENTATION FLOW CHART PEACH BOTTOM ATOMIC POWER STATION RECOVERY ACCEPTANCE CHECKLIST LIMERICK GENERATING STATION RECOVERY ACCEPTANCE CHECKLIST RECOVERY PLAN OUTLINE ASSESSMENT CONSIDERATIONS CLASSIFICATION OF EMERGENCIES PBAPS EAL TECHNICAL BASIS MANUAL TABLE OF CONTENTS EMERGENCY NOTIFICATIONS EMERGENCY NOTIFICATION TELEPHONE LIST EMERGENCY CLASSIFICATION NOTIFICATION TELEPHONE LIST FOR A SITE EMERGENCY OR GENERAL EMERGENCY CANCELLED -

REPLACED BY ERP-110 APPENDIX I PARTIAL PLANT EVACUATION CANCELLED -

REPLACED BY ERP-130 & GP-15 SITE EVACUATION EMERGENCY RESPONSE ORGANIZATION (ERO)

CALL OUT AUTOMATED ERO ACTIVATION ASPEN EMERGENCY MESSAGE CANCELLED -

REPLACED BY ERP-110 APP 1 DOSE ASSESSMENT TEAM CANCELLED -

REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 CHEMISTRY SAMPLING & ANALYSIS TEAM CANCELLED -

REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 DAMAGE REPAIR TEAM CANCELLED -

REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 SECURITY TEAM CANCELLED -

REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 PERSONNEL SAFETY TEAM CANCELLED -

REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 COMPANY CONSULTANTS AND CONTRACTORS CANCELLED -

INCLUDED IN EMERGENCY TELEPHONE DIRECTORY NEARBY PUBLIC AND INDUSTRIAL USERS OF DOWNSTREAM WATER CANCELLED INCLUDED IN EMERGENCY TELEPHONE DIRECTORY EMERGENCY DIRECTOR (ED)

EMERGENCY DIRECTOR CHECKLIST (MCR)

EMERGENCY DIRECTOR CHECKLIST (TSC)

EVENT NOTIFICATION FORM STATION PUBLIC ADDRESS ANNONCEMENTS PAR DEVELOPMENT AND ISSUANCE DOSE ASSESSMENT DATA SHEET TURNOVER/BREIFING FORM MINIMUM STAFFING POSITIONS NECESSARY TO ACTIVATE THE TSC 3/12/2002 PAGE

-4.

4 2

EFFECTIVE RESP SYSTEM DATE GROUP NBR 09/09/98 PWE 09/09/98 PWE 06/01/01 PWE 06/25/01 PWE 04/14/00 PWE 10/24/95 PWE 10/24/95 PWE 11/02/98 PWE 06/28/93 PWE 04/02/98 PWE 04/02/98 PWE 04/02/98 PWE 12/28/99 PWE 02/08/02 PWE 02/08/02 PWE 05/11/01 PWE 01/06/01 PWE 07/21/93 PWE 08/10/92 PWE 03/13/02 PWE 03/04/99 PWE 08/06/98 PWE 08/06/98 PWE 08/20/92 08/20/92 08/20/92 08/20/92 08/20/92 08/20/92 08/20/92 03/27/01 PWE 12/10/01 PWE 03/30/01 PWE 07/10/00 PWE 07/10/00 PWE 04/25/01 PWE 07/10/00 07/10/00 PWE 03/27/01 PWE ERP-120 ERP-130 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200

PEACH BOTTOM ATOMIC POWER STATION PROCEDURE INDEX REPORT:

FAC PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB P5 PB PB PB PB PB PB PB DOC TYPE PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC TYPE ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP PROCEDURE NUMBER ERP-205 ERP-206 ERP-210 ERP-220 ERP-230 ERP-230 APP I ERP-250 ERP-300 ERP-301 ERP-305 ERP-306 ERP-310 ERP-315 ERP-318 ERP-319 ERP-325 ERP-325 APP 1 ERP-330 ERP-340 ERP-340 APP 1 ERP-360 ERP-400 ERP-410 ERP-410 APP 1 ERP-410 APP 2 ERP-500 ERP-510 ERP-520 ERP-520 APP 1 ERP-600 ERP-610 ERP-620 ERP-620 APP 1 ERP-620 APP 2 ERP-620 APP 3 ERP-620 APP 4 ERP-630 ERP-640 ERP-640 APP 1 ERP-640 APP 2 ERP-650 ERP-660 CURR REV NBR 0010 0008 0000 0006 0016 0001 0011 0007 0006 0004 0000 0007 0014 0001 0001 0005 0000 0009 0006 0005 0000 0006 0009 0000 0000 0010 0009 0005 0000 0013 0004 0012 0000 0000 0002 0000 0003 0007 0000 0000 0006 0007 TITLE EMERGENCY PREPAREDNESS COORDINATOR/TSC SUPPORT SERVICES GROUP TRIP TABLE COMMUNICATOR (TSC)

OPERATIONS GROUP OPERATIONS SUPPORT CENTER (OSC)

ACTIVATION PERSONNEL EXPOSURE LOG OPERATIONS SUPPORT CENTER (OSC)

CANCELLED -

NO REPLACEMENT TECHNICAL SUPPORT CENTER (TSC)

ACTIVATION CANCELLED -

NO REPLACEMENT DOSE ASSESSMENT TEAM LEADER (DATL)

CANCELLED -

NO REPLACEMENT DOSE ASSESSMENT COORDINATOR (DAC)

DOSE ASSESSMENT GROUP LEADER (DAGL)

CANCELLED -

NO REPLACEMENT LIMERICK RESPONSE FOR SHIFT DOSE ASSESSMENT PERSONNEL (SOAP)

DOSE ASSESSMENT GROUP CANCELLED -

NO REPLACEMENT OPERATION OF THE DOSE ASSESSMENT COMPUTER LIQUID RELEASE DOSE CALCULATIONS AT DOWNSTREAM WATER INTAKE FACILITIES CANCELLED -

REPLACED BY ERP-360 LIQUID RELEASE DOSE CALCULATIONS FOR FISH INGESTION CANCELLED REPLACED BY ERP-360 SHIFT DOSE ASSESSMENT PERSONNEL CANCELLED -

REPLACED BY MESOREM PROGRAM FIELD SURVEY GROUP LEADER (FSGL)

CANCELLED -

NO REPLACEMENT FIELD SURVEY GROUP FIELD SURVEY DATA SHEET RADIOACTIVE LIQUID RELEASE CANCELLED -

REPLACED BY ERP-315 CHEMISTRY TEAM LEADER (CTL)

CHEMISTRY GROUP CHEMISTRY SAMPLE CHECK-OFF LIST CANCELLED -

REPLACED BY ERP-410 CHEMISTRY SAMPLE AND ANALYSIS LOG SHEETCANCELLED REPLACED BY ERP-410 SECURITY TEAM LEADER (STL)

PERSONNEL ACCOUNTABILITY CANCELLED -

NO REPLACEMENT SECURITY GROUP LEADERS UNIT I PERSONNEL LOG CANCELLED -

NO REPLACEMENT HEALTH PHYSICS TEAM LEADER (HPTL)

FIRST AID/SEARCH AND RESCUE GROUP CANCELLED -

NO REPLACEMENT HEALTH PHYSICS GROUP HABITABILITY STATUS LOG SHEET ARM STATUS LOG HEALTH PHYSICS BRIEFING GUIDE ACCESS BRIEFING GUIDE CANCELLED -

NO REPLACEMENT DOSIMETRY,

BIOASSAY, AND RESPIRATORY PROTECTION GROUP CANCELLED NO REPLACEMENT VEHICLE AND EVACUEE CONTROL GROUP CONTAMINATED VEHICLE SURVEY FORM CANCELLED -

NO REPLACEMENT UNCONTAMINATED VEHICLE FORM CANCELLED -

NO REPLACEMENT TRANSPORT OF CONTAMINATED INJURY OFF-SITE ENTRY FOR EMERGENCY REPAIR AND OPERATIONS CANCELLED -

REPLACED BY ERP-620 EFFECTIVE DATE 03/27/01 02/07/01 09/12/97 10/05/95 10/07/98 11/28/95 10/14/93 09/23/94 04/25/01 03/12/93 06/30/00 09/23/94 04/24/00 06/18/93 06/18/93 08/25/98 03/03/95 09/23/94 03/19/97 05/29/00 06/23/94 01/20/00 04/30/98 12/11/96 12/11/96 04/24/00 11/28/95 11/28/95 11/28/95 07/07/99 02/05/93 10/13/00 11/05/93 11/05/93 09/04/98 05/08/96 03/18/93 03/01/02 05/28/97 05/28/97 11/27/96 07/11/94 3/12/2002 PAGE 3

SeF A'

  • I PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE 101 100 RESP SYSTEM GROUP NBR PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE

PROCEDURE INDEX REPORT:PEACH BOTTOM ATOMIC POWER STATION DOC PROC FAC TYPE TYPE PB PB PB PB PB PB PB PB PB PB PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP PROCEDURE NUMBER ERP-670 ERP-680 ERP-680 ERP-680 ERP-680 ERP-680 ERP-700 ERP-710 ERP-800 ERP-810 APP 1 APP 2 APP 3 APP 4 CURR REV NBR 0004 EMERGENCY RADIATION EXPOSURE GUIDELINES AND CONTROLS 0007 CONTROL OF THYROID BLOCKING POTASSIUM IODIDE (KI)

TABLETS 0001 POTASSIUM IODIDE WORKSHEET 0000 POTASSIUM IODIDE CONSENT FORM 0001 INSTRUCTION AND RECORD SHEET FOR PERSONS RECEIVING KI 0001 KI AUTHORIZATION 0010 TECHNICAL SUPPORT TEAM 0008 TECHNICAL SUPPORT GROUP CANCELLED -

REPLACED BY ERP-700 0006 OPERATIONS SUPPORT CENTER DIRECTOR (OSC DIRECTOR) 0011 MAINTENANCE TEAM

  • 0 END OF REPORT **

EFFECTIVE RESP SYSTEM DATE GROUP NOR 12/11/96 09/22/00 02/20/97 11/30/94 02/20/97 02/20/97 09/22/00 11/02/98 10/07/98 07/07/99 PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE 3/12/2002 PAGE V.

4 Ir TITLE