Exel I n,,
Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 www.exeloncoTp.com Nuclear 10CFR50, Appendix E February 27, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Peach Bottom Atomic Power Station, Units 2 & 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 ERP-640, Revision 7, "Vehicle and Evacuee Control Group"
Dear Sir/Madam:
Enclosed is a revised Emergency Response Procedure (ERP) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. This procedure is required to be submitted within thirty (30) days of its revision in accordance with 1 OCFR50, Appendix E, and 1 OCFR50.4.
Also, enclosed is a copy of a computer generated report index identifying the latest revisions of the PBAPS ERPs.
If you have any questions or require additional information, please do not hesitate to contact us.
Very truly yours, M. P. Gallagher Director - Licensing & Regulatory Affairs Mid-Atlantic Regional Operating Group Enclosures cc:
H. J. Miller, Administrator, Region I, USNRC (2 copies)
A. C. McMurtray, USNRC Senior Resident Inspector, PBAPS
ý0-5
ATTACHMENT 1 PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 & 3 Docket Nos.
License Nos.
50-277 50-278 DPR-44 DPR-56 EMERGENCY RESPONSE PROCEDURE ERP-640, "Vehicle and Evacuee Control Group" Revision 7
,Effe~ctive Date:
./0*0 ERP-640 Rev.
7 Page 1 of 9 CGH/ldt EXELON NUCLEAR PEACH BOTTOM UNITS 2 AND 3 EMERGENCY RESPONSE PROCEDURE ERP-640 VEHICLE AND EVACUEE CONTROL GROUP 1.0 RESPONSIBILITIES 1.1 The Vehicle and Evacuee Control Group Leader (VECGL) is responsible for direction and coordination of the Vehicle and Evacuee Control Group and reports to the Health Physics Team Leader (HPTL).
1.2 Team members are responsible for establishing and operating the vehicle and evacuee monitoring and decontamination stations as directed by the Group Leader.
2.0 INITIAL ACTIONS 2.1 The VECGL shall:
2.1.1 2.1.2 Ensure the following equipment and keys are obtained.
2.1.1.1 Vehicle and Evacuee Control Group (VECG) kits from the Guard House exit.
2.1.1.2 Keys for the designated evacuation assembly area from the Guardhouse
("Evacuation Coordinator" key ring).
Establish communications with the HPTL and obtain briefing on significant hazards including:
2.1.2.1 The anticipated time of evacuation.
2.1.2.2 The selected evacuation assembly area.
NOTE VEHICULAR SURVEYS CAN BE WAIVED BY THE HPTL BASED ON PLANT CONDITIONS.
I.E.,
A.)
NO RELEASE HAS OCCURRED, B.)
ANY RELEASE OCCURRING WOULD NOT BE EXPECTED TO AFFECT PLANT PARKING LOTS BASED ON RELEASE POINT AND METEOROLOGICAL CONDITIONS.
ERP-640, Rev.
7 Page 2 of 9 2.1.2.3 Radioactive releases.
2.1.2.4 Non radiological hazards.
2.1.3 Report to designated assembly area.
2.1.4 Direct each group member to obtain orange vests for identification and safety.
2.1.5 Assign group members to set up the evacuation assembly area as appropriate.
2.1.6 Assign the following tasks and specific duties to the group members as necessary:
2.1.6.1 One individual to direct traffic at the evacuation assembly area.
2.1.6.2 Two individuals to perform surveys of evacuees and vehicles.
2.1.6.3 Two individuals to perform decontamination of evacuees and vehicles.
2.1.7 Direct team members to dress in Anti-C clothing when conditions warrant.
2.2 Group members shall:
2.2.1 IF assigned traffic control THEN:
2.2.1.1 Set up the traffic control patterns 2.2.2 referencing Attachments 1 or 2 for guidance.
IF assigned to survey evacuees and vehicles THEN:
2.2.2.1 Obtain two PRM-6 friskers or equivalent.
2.2.2.2 Proceed to the area designated to be the monitoring area and, take background contamination level reading.
If the reading is greater than 300 cpm, inform the Group Leader.
2.2.2.3 Set up a monitoring station:
- a.
Establish a method for controlling contamination, i.e.,
step off pads.
- b.
Set up personnel monitoring equipment and response check as necessary.
ERP-640, Rev.
7 Page 3 of 9 2.2.3 IF assigned to perform vehicle decontamination, THEN:
2.2.3.1 Set up the vehicle decontamination area for contaminated vehicle parking and a station for decontamination.
3.0 CONTINUING ACTIONS 3.1 The VECGL shall:
3.1.1 Ensure proper frisking of vehicles and evacuees is being performed as necessary.
3.1.2 Ensure surveys are being properly documented.
3.1.3 Inform the HPTL when vehicles or evacuees are found to be contaminated, including the levels and extent of contamination.
3.1.4 Using current Health Physics (HP) procedures, determine the process and technique by which decontamination should be performed.
3.1.5 Inform the HPTL when all vehicle and evacuee surveys have been completed.
3.2 Group members shall:
3.2.1 IF assigned as traffic controllers, THEN:
3.2.1.1 Direct arriving evacuees to drive through or await survey as required.
3.2.1.2 Direct evacuees who have arrived without vehicles to go to the contamination control point to be monitored as necessary.
3.2.2 IF assigned to survey evacuees and vehicles THEN:
3.2.2.1 Direct each arriving evacuee to remove Anti-C clothing (as applicable).
3.2.2.2 Direct evacuees to perform a self-frisk or utilize personnel monitoring equipment as appropriate.
- a.
If contamination is found, perform the following:
- 1.
remove the affected item
ERP-640, Rev.
7 Page 4 of 9
- 2.
provide direction to the appropriate decontamination area
- b.
Ensure that their vehicles continue in the monitor process.
- c.
Any person known, or suspected, to have ingested/inhaled radioactive particles or materials should be assessed for a whole body count.
- d.
Decontaminate personnel following guidance in HP-C-818 and complete the appropriate sections for each person found to be contaminated.
CM-i
- e.
Forward completed forms to the VECGL.
3.2.2.3 Survey the exterior and interior of each vehicle for contamination.
3.2.2.4 IF both occupants AND vehicle are uncontaminated, direct evacuees to follow posted traffic signs to the clean parking areas, or to leave the area after being advised about the direction of plume track (if applicable).
3.2.2.5 For each contaminated vehicle, complete and record all information on the "Contaminated Vehicle Survey Form".
(Use one form for each contaminated vehicle) 3.2.2.6 Determine if vehicles found contaminated should be parked in the contaminated vehicle parking area or be decontaminated.
3.2.2.7 Direct occupants of contaminated vehicles (which are to be left in parking areas) to:
- a.
follow the posted traffic signs to the contaminated parking area.
- b.
leave keys in the ignition.
- c.
return for further direction.
3.2.2.8 Perform periodic surveys of the area for contamination.
ERP-640, Rev.
7 Page 5 of 9 3.2.2.9 When all necessary surveys have been completed, submit records to Group Leader and assist in area decontamination efforts.
IF assigned to perform vehicle decontamination, THEN:
3.2.3.1 Direct the driver to exit.
3.2.3.2 Determine from the Contaminated Vehicle Survey Form the appropriate decon method.
3.2.3.3 Method of decontamination will depend upon location of contamination, total area and contamination levels.
3.2.3.4 Upon successful completion of decontamination, the vehicle can be sent back to the clean parking area, or allowed to leave the area.
3.2.3.5 Vehicles which cannot be decontaminated shall be reported to the HPTL and these vehicles will be left at the contaminated parking area for later resolution.
3.2.3.6 Documentation of decontaminations and subsequent surveys will be recorded on the Contaminated Vehicle Survey Form.
3.2.3.7 Upon completion of all immediate vehicle decontamination, inform the VECGL.
3.2.3 NOTE MINIMIZE THE USE OF WATER WHEN DECONTAMINATING VEHICLES; USE MASSLIN WIPES AS MUCH AS PRACTICABLE.
- 1.
WHEEL WELL AND UNDERCARRIAGE CAN BE DECONTAMINATED BY VERY-LOW PRESSURE WATER RINSING OR SPRAY BOTTLES.
IF REQUIRED, BRUSHES MAY BE USED TO LOOSEN CONTAMINATION.
- 2.
EXTREME CARE SHOULD BE EXERCISED DURING CAR WASHING/DECONTAMINATION TO PREVENT THE POSSIBLE SPREAD OF CONTAMINATION.
A HIGH-PRESSURE NOZZLE WILL BE USED ONLY IF ALL OTHER DECONTAMINATION METHODS FAIL.
- 3.
CONTAMINATED AIR FILTERS WILL BE DISPOSED OF AS RADIOACTIVE WASTE.
ERP-640, Rev.
7 Page 6 of 9 3.2.3.8 Perform a thorough survey of the entire vehicle and evacuee assembly area.
Any readings greater than established clean area limits, will be reported to the VECGL.
3.2.3.9 Disassemble the contamination control area and decontaminate as necessary.
3.2.3.10 Bag and label all radioactive trash for later transport and disposal.
3.2.3.11 Return equipment to normal storage location.
4.0 FINAL CONDITIONS 4.1 The Vehicle and Evacuee Control Group function shall be terminated when directed by the Emergency Director (ED) through the HPTL after:
4.1.1 Personnel, vehicles and equipment are decontaminated to an acceptable level.
4.1.2 Radiological releases are terminated or at an acceptable level.
4.2 All personnel and vehicle survey and decontamination records have been collected and turned over to the HPTL.
5.0 ATTACHMENTS AND APPENDICES 5.1, "North Sub Station Layout" 5.2,
" Unit 1 Layout" 6.0 SUPPORTING INFORMATION 6.1 PURPOSE 6.1.1 To define the actions of the Health Physics Group Members assigned to Vehicle and Evacuee Control Group.
6.1.2 To establish personnel/vehicle monitoring and vehicle decontamination processes to be used during a site evacuation.
6.2 CRITERIA FOR USE 6.2.1 The Vehicle and Evacuee Control Group should be activated at the Alert or higher or at the discretion of the Emergency Director.
ERP-640, Rev.
7 Page 7 of 9
6.3 REFERENCES
6.3.1 NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants 6.3.2 Nuclear Emergency Plan 6.3.3 HP-C-818, "Personnel Contamination Monitoring and Decontamination" 6.4 COMMITMENT ANNOTATION 6.4.1 CM-l, Letter to NRC, 6/4/82 (T03130)
(
RAD EhIERGENCY KIT 01220 K CONTROL I
HOUSE
[
PARKING I'CLEAN AREA PARKING AREAR S........................ °..°..-...................
EX IT----
OUTSIDE FAUCET (ON/OFF VALVE INSIDE)I CONTROL HOUS
- i.
CONTAMINATED PARKING GATE OV~ERFLOW CONTAMINATED PARWJNG I
DECON DECON AREA j
AREA I
EXIT SUREYA S..................
I........
L.J
(
(
ft 04 c[>
TRAFFIC FLOW S........
=FENCE AREA,
- ) -TRAFFIC CONES I........................
I.....,*,'J....................
'U z 0 F-3 cn 0
co*Z CD oo0 (D
0
%k k EXIT
ERP-640, Rev.
7 Page 9 of 9 ATTACHMENT 2 UNIT 1 LAYOUT
ATTACHMENT 2 PEACH BOTTOM POWER STATION, UNITS 2 & 3 Docket Nos.
License Nos.
50-277 50-278 DPR-44 DPR-56 EMERGENCY RESPONSE PROCEDURES REPORT INDEX
PEACH BOTTOM ATOMIC POWER STATION PROCEDURE INDEX REPORT:
DOC PROC FAC TYPE TYPE PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP PROCEDURE NUMBER ERP-C-I1000 ERP-C-1000-1 ERP-C-1000-2 ERP-C-1000-3 ERP-C-1000-4 ERP-C-1000-5 ERP-C-1100 ERP-C-1200 ERP-C-1200-1 ERP-C-1200-2 EXH ERP-C-1200-3 ERP-C-1200-4 ERP-C-1210 ERP-C-1250 ERP-C-1250-1 ERP-C-1250-2 ERP-C-1250-3 ERP-C-1250-4 ERP-C-1300 ERP-C-1300-1 ERP-C-1300-2 ERP-C-1300-3 ERP-C-1300-4 ERP-C-1300-5 ERP-C-1300-6 ERP-C-1300-7 ERP-C-1300-8 ERP-C-1300-9 ERP-C-1310 ERP-C-1310-1 ERP-C-1310-2 ERP-C-1310-3 ERP-C-1310-4 ERP-C-1320 ERP-C-1320-1 ERP-C-1320-2 ERP-C-1320-3 ERP-C-1400 ERP-C-1400-1 ERP-C-1410 ERP-C-1410-1 ERP-C-1410-2 CURR REV NBR 0006 0004 0003 0000 0000 0000 0003 0011 0000 0000 0000 0000 0002 0004 0000 0002 0000 0000 0010 0004 0000 0004 0000 0001 0002 0000 0000 0001 0003 0000 0000 0000 0000 0007 0002 0001 0002 0005 0002 0002 0000 0001 TITLE EMERGENCY OPERATIONS FACILITY (EOF)
ACTIVATION/DECACTIVATION EOF ACTIVATION CHECKLIST EOF DEACTIVATION CHECKLIST EOF BUSINESS HOURS FIRST RESPONDER CHECKLIST EOF AFTER HOURS FIRST RESPONDER CHECKLIST MINIMUM STAFFING POSITIONS NECESSARY TO ACTIVATE THE EOF EOF STAFF AUGMENTATION-CANCELLED -
REPLACED BY ERP-C-1250 EMERGENCY REPSONSE MANAGER EMERGENCY RESPONSE MANAGER TURNOVER/BRIEFING FORM PROTECTIVE ACTION RECOMMENDATION WORKSHEET CANCELLED REPLACED BY ERP-C-1200 ERM PAR DELIVERY CHECKLIST MINIMUM STAFFING POSITIONS NECESSARY TO ACTIVATE THE EOF ASSISTANT EMERGENCY RESPONSE MANAGER (AERM)
CANCELLED -
REPLACED BY ERP-C-1200 EMERGENCY PREPAREDNESS COORDINATOR/EOF EMERGENCY POWER INSTRUCTIONS EMERGENCY PREPAREDNESS COORDINATOR INSTRUCTIONS FOR ASPEN BACKUP NOTIFICATION SYSTEM EMERGENCY PREPAREDNESS COORDINATOR INSTRUCTIONS TO STOP STAFFING EMERGENCY PREPAREDNESS COORDINATOR INSTUCTIONS FOR SYSTEM RESET EMERGENCY OPERATIONS FACILITY (EOF)
DOSE ASSESSMENT TEAM LEADER DOSE ASSESSMENT TEAM LEADER (DATL)
INITIAL ACTIONS DOSE ASSESSMENT TURNOVER LIST PROTECTIVE ACTION RECOMMENDATION WORKSHEET OFFSITE SAMPLE ANALYSIS REQUESTS DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARS)
DOSE ASSESSMENT GROUP MEMBER (DAGM)
INITIAL ACTIONS OBTAINING EPDS MET/RAD DATA USE OF MODE A/MODE B OF CDM OBTAINING MET DATA FROM NATIONAL WEATHER SERVICE EMERGENCY OPERATIONS FACILITY (EOF)
DOSE ASSESSMENT GROUP CANCELLED -
REPLACED BY ERP-C-1300 DOSE ASSESSMENT GROUP LEADER INITIAL ACTIONS CANCELLED REPLACED BY ERP-C-1300 OBTAINING MET DATA FROM NATIONAL WEATHER SERVICE CANCELLED REPLACED BY ERP-C-1300 OBTAINING EPDS MET/RAD DATA -
CANCELLED -
NO REPLACED BY ERP-C-1300 USE OF MODE A/MODE B OF CDM CANCELLED -
REPLACED BY ERP-C-1300 EMERGENCY OPERATIONS FACILITY (EOF)
FIELD SURVEY GROUP LEADER FIELD SURVEY GROUP LEADER INITIAL ACTIONS FIELD SURVEY GROUP LEADER TURNOVER SHEET FIELD SURVEY GROUP LEADER DATA SHEET ENGINEERING SUPPORT TEAM ENGINEERING SUPPORT TEAM CHECKLIST CORE DAMAGE ASSESSMENT RADIOLOGICAL DATA HYDROGEN CONCENTRATION DATA EFFECTIVE DATE 06/25/01 06/25/01 04/21/99 04/21/99 04/21/99 06/25/01 09/14/94 06/25/01 09/14/94 10/24/95 04/03/00 03/30/01 10/24/95 06/25/01 09/14/94 05/11/01 09/14/94 09/14/94 08/31/00 06/25/01 09/23/94 03/30/01 09/23/94 11/02/98 06/25/01 03/26/97 03/26/97 09/12/97 03/26/97 03/26/97 03/24/97 03/26/97 03/26/97 08/31/00 04/10/98 03/26/97 08/31/00 06/25/01 11/02/98 09/09/98 09/14/94 09/09/98 RESP SYSTEM GROUP NBR PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE.
PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE 3/01/2002 PAGE
PEACH BOTTOM ATOMIC POWER STATION PROCEDURE INDEX REPORT:
DOC PROC FAC TYPE TYPE PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP PROCEDURE NUMBER ERP-C-1410-3 ERP-C-1410-4 ERP-C-1410-5 ERP-C-1410-6 ERP-C-1500 ERP-C-1500-1 ERP-C-1500-2 ERP-C-1900 ERP-C-1900-1 ERP-C-1900-2 ERP-C-1900-3 ERP-C-1900-4 ERP-C-1900-5 ERP-101 ERP-101 ERP-1 10 ERP-1 10 ERP-1 10 ERP-120 ERP-130 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-140 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200 ERP-200 BASES APP 1 APP 2 APP 1 APP 2 APP 3 APP 4 APP 5 APP 6 APP 7 APP 8 APP 9 APP APP APP APP APP APP APP APP 1
2 3
4 5
6 7
8 CURR REV NBR 0001 0000 0002 0002 0006 0001 0001 0004 0000 0002 0002 0002 0002 0023 0003 0013 0057 0024 0002 0018 0019 0019 0022 0022 0015 0014 0013 0017 0009 0011 0017 0005 0005 0004 0004 0005 0001 0000 0000 TITLE CONTAINMENT RADIATION MONITOR DATA METAL WATER REACTION CANCELLED NO REPLACEMENT PERCENT OF FUEL INVENTORY AIRBORNE IN THE CONTAINMENT VS.
APPROXIMATE SOURCE AND DAMAGE ESTIMATE PROCEDURES FOR ESTIMATING FUEL DAMAGE BASED ON MEASURED 1-131 AND XE-133 CONCENTRATIONS LOGISTICS SUPPORT TEAM MESSAGE AND INFORMATION INSTRUCTIONS HELICOPTER LANDING INFORMATION RECOVERY PHASE IMPLEMENTATION RECOVERY PHASE IMPLEMENTATION FLOW CHART PEACH BOTTOM ATOMIC POWER STATION RECOVERY ACCEPTANCE CHECKLIST LIMERICK GENERATING STATION RECOVERY ACCEPTANCE CHECKLIST RECOVERY PLAN OUTLINE ASSESSMENT CONSIDERATIONS CLASSIFICATION OF EMERGENCIES PBAPS EAL TECHNICAL BASIS MANUAL TABLE OF CONTENTS EMERGENCY NOTIFICATIONS EMERGENCY NOTIFICATION TELEPHONE LIST EMERGENCY CLASSIFICATION NOTIFICATION TELEPHONE LIST FOR A SITE EMERGENCY OR GENERAL EMERGENCY CANCELLED -
REPLACED BY ERP-110 APPENDIX 1
PARTIAL PLANT EVACUATION CANCELLED -
REPLACED BY ERP-130 & GP-15 SITE EVACUATION EMERGENCY RESPONSE ORGANIZATION (ERO)
CALL OUT AUTOMATED ERO ACTIVATION ASPEN EMERGENCY MESSAGE CANCELLED -
REPLACED BY ERP-110 APP 1 DOSE ASSESSMENT TEAM CANCELLED -
REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 CHEMISTRY SAMPLING & ANALYSIS TEAM CANCELLED -
REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 DAMAGE REPAIR TEAM CANCELLED REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 SECURITY TEAM CANCELLED -
REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 PERSONNEL SAFETY TEAM CANCELLED -
REPLACED BY PIMS PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 COMPANY CONSULTANTS AND CONTRACTORS CANCELLED -
INCLUDED IN EMERGENCY TELEPHONE DIRECTORY NEARBY PUBLIC AND INDUSTRIAL USERS OF DOWNSTREAM WATER CANCELLED INCLUDED IN EMERGENCY TELEPHONE DIRECTORY EMERGENCY DIRECTOR (ED)
EMERGENCY DIRECTOR CHECKLIST (MCR)
EMERGENCY DIRECTOR CHECKLIST (TSC)
EVENT NOTIFICATION FORM STATION PUBLIC ADDRESS ANNONCEMENTS PAR DEVELOPMENT AND ISSUANCE DOSE ASSESSMENT DATA SHEET TURNOVER/BREIFING FORM MINIMUM STAFFING POSITIONS NECESSARY TO ACTIVATE THE TSC EFFECTIVE DATE 09/09/98 09/09/98 06/01/01 06/25/01 04/14/00 10/24/95 10/24/95 11/02/98 06/28/93 04/02/98 04/02/98 04/02/98 12/28/99 02/08/02 02/08/02 05/11/01 01/06/01 07/21/93 08/10/92 11/20/01 03/04/99 08/06/98 08/06/98 08/20/92 08/20/92 08/20/92 08/20/92 08/20/92 08/20/92 08/20/92 03/27/01 12/10/01 03/30/01 07/10/00 07/10/00 04/25/01 07/10/00 07/10/00 03/27/01 RESP SYSTEM GROUP NBR PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE 3/01/2002 PAGE 2
3/01/2002 PEACH BOTTOM ATOMIC POWER STATION PROCEDURE INDEX REPORT:
DOC PROC FAC TYPE TYPE PROCEDURE NUMBER CURR REV NBR TITLE EFFECTIVE RESP SYSTEM DATE GROUP NBR PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC PROC ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP ERP 2
ERP-500 ERP-510 ERP-520 ERP-520 APP 1
ERP-600 ERP-610 ERP-620 ERP-620 APP 1
ERP-620 APP 2 ERP-620 APP 3 ERP-620 APP 4 ERP-630 ERP-640 ERP-640 APP 1
ERP-640 APP 2 ERP-650 ERP-660 ERP-205 ERP-206 ERP-210 ERP-220 ERP-230 ERP-230 APP 1 ERP-250 ERP-300 ERP-301 ERP-305 ERP-306 ERP-310 ERP-315 ERP-318 ERP-319 ERP-325 ERP-325 APP 1 ERP-330 ERP-340 ERP-340 APP 1 ERP-360 ERP-400 ERP-410 ERP-410 APP 1 0010 EMERGENCY PREPAREDNESS COORDINATOR/TSC 0008 SUPPORT SERVICES GROUP 0000 TRIP TABLE COMMUNICATOR (TSC) 0006 OPERATIONS GROUP 0016 OPERATIONS SUPPORT CENTER (OSC)
ACTIVATION 0001 PERSONNEL EXPOSURE LOG OPERATIONS SUPPORT CENTER (OSC)
CANCELLED -
NO REPLACEMENT 0011 TECHNICAL SUPPORT CENTER (TSC)
ACTIVATION CANCELLED -
NO REPLACEMENT 0007 DOSE ASSESSMENT TEAM LEADER (DATL)
CANCELLED -
NO REPLACEMENT 0006 DOSE ASSESSMENT COORDINATOR (DAC) 0004 DOSE ASSESSMENT GROUP LEADER (DAGL)
CANCELLED -
NO REPLACEMENT 0000 LIMERICK RESPONSE FOR SHIFT DOSE ASSESSMENT PERSONNEL (SDAP) 0007 DOSE ASSESSMENT GROUP CANCELLED -
NO REPLACEMENT 0014 OPERATION OF THE DOSE ASSESSMENT COMPUTER 0001 LIQUID RELEASE DOSE CALCULATIONS AT DOWNSTREAM WATER INTAKE FACILITIES CANCELLED REPLACED BY ERP-360 0001 LIQUID RELEASE DOSE CALCULATIONS FOR FISH INGESTION CANCELLED REPLACED BY ERP-360 0005 SHIFT DOSE ASSESSMENT PERSONNEL 0000 CANCELLED -
REPLACED BY MESOREM PROGRAM 0009 FIELD SURVEY GROUP LEADER (FSGL)
CANCELLED -
NO REPLACEMENT 0006 FIELD SURVEY GROUP 0005 FIELD SURVEY DATA SHEET 0000 RADIOACTIVE LIQUID RELEASE CANCELLED -
REPLACED BY ERP-315 0006 CHEMISTRY TEAM LEADER (CTL) 0009 CHEMISTRY GROUP 0000 CHEMISTRY SAMPLE CHECK-OFF LIST CANCELLED -
REPLACED BY ERP-410 0000 CHEMISTRY SAMPLE AND ANALYSIS LOG SHEETCANCELLED REPLACED BY ERP-410 0010 SECURITY TEAM LEADER (STL) 0009 PERSONNEL ACCOUNTABILITY CANCELLED -
NO REPLACEMENT 0005 SECURITY GROUP LEADERS 0000 UNIT 1 PERSONNEL LOG CANCELLED NO REPLACEMENT 0013 HEALTH PHYSICS TEAM LEADER (HPTL) 0004 FIRST AID/SEARCH AND RESCUE GROUP CANCELLED -
NO REPLACEMENT 0012 HEALTH PHYSICS GROUP 0000 HABITABILITY STATUS LOG SHEET 0000 ARM STATUS LOG 0002 HEALTH PHYSICS BRIEFING GUIDE 0000 ACCESS BRIEFING GUIDE CANCELLED NO REPLACEMENT 0003 DOSIMETRY,
- BIOASSAY, AND RESPIRATORY PROTECTION GROUP CANCELLED NO REPLACEMENT 0007 VEHICLE AND EVACUEE CONTROL GROUP 0000 CONTAMINATED VEHICLE SURVEY FORM CANCELLED -
NO REPLACEMENT 0000 UNCONTAMINATED VEHICLE FORM CANCELLED -
NO REPLACEMENT 0006 TRANSPORT OF CONTAMINATED INJURY OFF-SITE 0007 ENTRY FOR EMERGENCY REPAIR AND OPERATIONS CANCELLED REPLACED BY ERP-620 12/11/96 PWE 04/24/00 11/28/95 11/28/95 11/28/95 07/07/99 02/05/93 10/13/00 11/05/93 11/05/93 09/04/98 05/08/96 03/18/93 03/01/02 05/28/97 05/28/97 11/27/96 07/11/94 PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE 03/27/01 02/07/01 09/12/97 10/05/95 10/07/98 11/28/95 10/14/93 09/23/94 04/25/01 03/12/93 06/30/00 09/23/94 04/24/00 06/18/93 06/18/93 08/25/98 03/03/95 09/23/94 03/19/97 08/29/00 06/23/94 01/20/00 04/30/98 12/11/96 ERP-410 APP PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE PWE 101 100 PAGE 3
3/01/2002 PEACH BOTTOM ATOMIC POWER STATION PAGE 4
PROCEDURE INDEX REPORT:
CURR DOC PROC REV EFFECTIVE RESP SYSTEM FAC TYPE TYPE PROCEDURE NUMBER NBR TITLE DATE GROUP NBR PB PROC ERP ERP-670 0004 EMERGENCY RADIATION EXPOSURE GUIDELINES AND CONTROLS 12/11/96 PWE PB PROC ERP ERP-680 0007 CONTROL OF THYROID BLOCKING POTASSIUM IODIDE (KI)
TABLETS 09/22/00 PWE PB PROC ERP ERP-680 APP 1
0001 POTASSIUM IODIDE WORKSHEET 02/20/97 PWE PB PROC ERP ERP-680 APP 2 0000 POTASSIUM IODIDE CONSENT FORM 11/30/94 PWE PB PROC ERP ERP-680 APP 3 0001 INSTRUCTION AND RECORD SHEET FOR PERSONS RECEIVING KI 02/20/97 PWE PB PROC ERP ERP-680 APP 4 0001 KI AUTHORIZATION 02/20/97 PWE PB PROC ERP ERP-700 0010 TECHNICAL SUPPORT TEAM 09/22/00 PWE PB PROC ERP ERP-710 0008 TECHNICAL SUPPORT GROUP CANCELLED -
REPLACED BY ERP-700 11/02/98 PWE PB PROC ERP ERP-800 0006 OPERATIONS SUPPORT CENTER DIRECTOR (OSC DIRECTOR) 10/07/98 PWE PB PROC ERP ERP-810 0011 MAINTENANCE TEAM 07/07/99 PWE END OF REPORT **