Submittal of Emergency Response Procedure ERP-640, Revision 7, from Peach Bottom Units 2 & 3
ML020770195
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/27/2002
From: Gallagher M
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation, Office of Nuclear Security and Incident Response
References
ERP-640, Rev 7
Download: ML020770195 (16)


Text

ExelI n,,

Exelon Nuclear 200 Exelon Way www.exeloncoTp.com Nuclear Kennett Square, PA 19348 10CFR50, Appendix E February 27, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Peach Bottom Atomic Power Station, Units 2 & 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 ERP-640, Revision 7, "Vehicle and Evacuee Control Group"

Dear Sir/Madam:

Enclosed is a revised Emergency Response Procedure (ERP) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. This procedure is required to be submitted within thirty (30) days of its revision in accordance with 1 OCFR50, Appendix E, and 1 OCFR50.4.

Also, enclosed is a copy of a computer generated report index identifying the latest revisions of the PBAPS ERPs.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours, M. P. Gallagher Director - Licensing & Regulatory Affairs Mid-Atlantic Regional Operating Group Enclosures cc: H. J. Miller, Administrator, Region I, USNRC (2 copies)

A. C. McMurtray, USNRC Senior Resident Inspector, PBAPS

ý0-5

ATTACHMENT 1 PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 & 3 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 EMERGENCY RESPONSE PROCEDURE ERP-640, "Vehicle and Evacuee Control Group" Revision 7

,Effe~ctive Date: ./0*0 ERP-640 Rev. 7 Page 1 of 9 CGH/ldt EXELON NUCLEAR PEACH BOTTOM UNITS 2 AND 3 EMERGENCY RESPONSE PROCEDURE ERP-640 VEHICLE AND EVACUEE CONTROL GROUP 1.0 RESPONSIBILITIES 1.1 The Vehicle and Evacuee Control Group Leader (VECGL) is responsible for direction and coordination of the Vehicle and Evacuee Control Group and reports to the Health Physics Team Leader (HPTL).

1.2 Team members are responsible for establishing and operating the vehicle and evacuee monitoring and decontamination stations as directed by the Group Leader.

2.0 INITIAL ACTIONS 2.1 The VECGL shall:

2.1.1 Ensure the following equipment and keys are obtained.

2.1.1.1 Vehicle and Evacuee Control Group (VECG) kits from the Guard House exit.

2.1.1.2 Keys for the designated evacuation assembly area from the Guardhouse

("Evacuation Coordinator" key ring).

NOTE VEHICULAR SURVEYS CAN BE WAIVED BY THE HPTL BASED ON PLANT CONDITIONS. I.E., A.) NO RELEASE HAS OCCURRED, B.) ANY RELEASE OCCURRING WOULD NOT BE EXPECTED TO AFFECT PLANT PARKING LOTS BASED ON RELEASE POINT AND METEOROLOGICAL CONDITIONS.

2.1.2 Establish communications with the HPTL and obtain briefing on significant hazards including:

2.1.2.1 The anticipated time of evacuation.

2.1.2.2 The selected evacuation assembly area.

ERP-640, Rev. 7 Page 2 of 9 2.1.2.3 Radioactive releases.

2.1.2.4 Non radiological hazards.

2.1.3 Report to designated assembly area.

2.1.4 Direct each group member to obtain orange vests for identification and safety.

2.1.5 Assign group members to set up the evacuation assembly area as appropriate.

2.1.6 Assign the following tasks and specific duties to the group members as necessary:

2.1.6.1 One individual to direct traffic at the evacuation assembly area.

2.1.6.2 Two individuals to perform surveys of evacuees and vehicles.

2.1.6.3 Two individuals to perform decontamination of evacuees and vehicles.

2.1.7 Direct team members to dress in Anti-C clothing when conditions warrant.

2.2 Group members shall:

2.2.1 IF assigned traffic control THEN:

2.2.1.1 Set up the traffic control patterns referencing Attachments 1 or 2 for guidance.

2.2.2 IF assigned to survey evacuees and vehicles THEN:

2.2.2.1 Obtain two PRM-6 friskers or equivalent.

2.2.2.2 Proceed to the area designated to be the monitoring area and, take background contamination level reading. If the reading is greater than 300 cpm, inform the Group Leader.

2.2.2.3 Set up a monitoring station:

a. Establish a method for controlling contamination, i.e., step off pads.
b. Set up personnel monitoring equipment and response check as necessary.

ERP-640, Rev. 7 Page 3 of 9 2.2.3 IF assigned to perform vehicle decontamination, THEN:

2.2.3.1 Set up the vehicle decontamination area for contaminated vehicle parking and a station for decontamination.

3.0 CONTINUING ACTIONS 3.1 The VECGL shall:

3.1.1 Ensure proper frisking of vehicles and evacuees is being performed as necessary.

3.1.2 Ensure surveys are being properly documented.

3.1.3 Inform the HPTL when vehicles or evacuees are found to be contaminated, including the levels and extent of contamination.

3.1.4 Using current Health Physics (HP) procedures, determine the process and technique by which decontamination should be performed.

3.1.5 Inform the HPTL when all vehicle and evacuee surveys have been completed.

3.2 Group members shall:

3.2.1 IF assigned as traffic controllers, THEN:

3.2.1.1 Direct arriving evacuees to drive through or await survey as required.

3.2.1.2 Direct evacuees who have arrived without vehicles to go to the contamination control point to be monitored as necessary.

3.2.2 IF assigned to survey evacuees and vehicles THEN:

3.2.2.1 Direct each arriving evacuee to remove Anti-C clothing (as applicable).

3.2.2.2 Direct evacuees to perform a self-frisk or utilize personnel monitoring equipment as appropriate.

a. If contamination is found, perform the following:
1. remove the affected item

ERP-640, Rev. 7 Page 4 of 9

2. provide direction to the appropriate decontamination area
b. Ensure that their vehicles continue in the monitor process.
c. Any person known, or suspected, to have ingested/inhaled radioactive particles or materials should be assessed for a whole body count.
d. Decontaminate personnel following guidance in HP-C-818 and complete the appropriate sections for each person found to be contaminated.

CM-i

e. Forward completed forms to the VECGL.

3.2.2.3 Survey the exterior and interior of each vehicle for contamination.

3.2.2.4 IF both occupants AND vehicle are uncontaminated, direct evacuees to follow posted traffic signs to the clean parking areas, or to leave the area after being advised about the direction of plume track (if applicable).

3.2.2.5 For each contaminated vehicle, complete and record all information on the "Contaminated Vehicle Survey Form".

(Use one form for each contaminated vehicle) 3.2.2.6 Determine if vehicles found contaminated should be parked in the contaminated vehicle parking area or be decontaminated.

3.2.2.7 Direct occupants of contaminated vehicles (which are to be left in parking areas) to:

a. follow the posted traffic signs to the contaminated parking area.
b. leave keys in the ignition.
c. return for further direction.

3.2.2.8 Perform periodic surveys of the area for contamination.

ERP-640, Rev. 7 Page 5 of 9 3.2.2.9 When all necessary surveys have been completed, submit records to Group Leader and assist in area decontamination efforts.

IF assigned to perform vehicle decontamination, 3.2.3 THEN:

3.2.3.1 Direct the driver to exit.

NOTE MINIMIZE THE USE OF WATER WHEN DECONTAMINATING VEHICLES; USE MASSLIN WIPES AS MUCH AS PRACTICABLE.

1. WHEEL WELL AND UNDERCARRIAGE CAN BE DECONTAMINATED BY VERY-LOW PRESSURE WATER RINSING OR SPRAY BOTTLES. IF REQUIRED, BRUSHES MAY BE USED TO LOOSEN CONTAMINATION.
2. EXTREME CARE SHOULD BE EXERCISED DURING CAR WASHING/DECONTAMINATION TO PREVENT THE POSSIBLE SPREAD OF CONTAMINATION. A HIGH-PRESSURE NOZZLE WILL BE USED ONLY IF ALL OTHER DECONTAMINATION METHODS FAIL.
3. CONTAMINATED AIR FILTERS WILL BE DISPOSED OF AS RADIOACTIVE WASTE.

3.2.3.2 Determine from the Contaminated Vehicle Survey Form the appropriate decon method.

3.2.3.3 Method of decontamination will depend upon location of contamination, total area and contamination levels.

3.2.3.4 Upon successful completion of decontamination, the vehicle can be sent back to the clean parking area, or allowed to leave the area.

3.2.3.5 Vehicles which cannot be decontaminated shall be reported to the HPTL and these vehicles will be left at the contaminated parking area for later resolution.

3.2.3.6 Documentation of decontaminations and subsequent surveys will be recorded on the Contaminated Vehicle Survey Form.

3.2.3.7 Upon completion of all immediate vehicle decontamination, inform the VECGL.

ERP-640, Rev. 7 Page 6 of 9 3.2.3.8 Perform a thorough survey of the entire vehicle and evacuee assembly area. Any readings greater than established clean area limits, will be reported to the VECGL.

3.2.3.9 Disassemble the contamination control area and decontaminate as necessary.

3.2.3.10 Bag and label all radioactive trash for later transport and disposal.

3.2.3.11 Return equipment to normal storage location.

4.0 FINAL CONDITIONS 4.1 The Vehicle and Evacuee Control Group function shall be terminated when directed by the Emergency Director (ED) through the HPTL after:

4.1.1 Personnel, vehicles and equipment are decontaminated to an acceptable level.

4.1.2 Radiological releases are terminated or at an acceptable level.

4.2 All personnel and vehicle survey and decontamination records have been collected and turned over to the HPTL.

5.0 ATTACHMENTS AND APPENDICES 5.1 Attachment 1, "North Sub Station Layout" 5.2 Attachment 2, " Unit 1 Layout" 6.0 SUPPORTING INFORMATION 6.1 PURPOSE 6.1.1 To define the actions of the Health Physics Group Members assigned to Vehicle and Evacuee Control Group.

6.1.2 To establish personnel/vehicle monitoring and vehicle decontamination processes to be used during a site evacuation.

6.2 CRITERIA FOR USE 6.2.1 The Vehicle and Evacuee Control Group should be activated at the Alert or higher or at the discretion of the Emergency Director.

ERP-640, Rev. 7 Page 7 of 9

6.3 REFERENCES

6.3.1 NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants 6.3.2 Nuclear Emergency Plan 6.3.3 HP-C-818, "Personnel Contamination Monitoring and Decontamination" 6.4 COMMITMENT ANNOTATION 6.4.1 CM-l, Letter to NRC, 6/4/82 (T03130)

( (

(

c[> - TRAFFIC FLOW OUTSIDE FAUCET S........ =FENCE AREA, ft (ON/OFF VALVE INSIDE)I CONTROL

  • ) -TRAFFIC CONES HOUS %kk I........................ I.....,*,'J....................

'U 04 z

0 RAD F-3 EhIERGENCY KIT 01220 K GATE  %

cn CONTROL HOUSE I OV~ERFLOW

[

PARWJNG CONTAMINATED I

i. ..

PARKING CONTAMINATED 0 I'CLEAN AREA PARKING

... AREAR PARKING DECON AREA j DECON AREA S........................ °..°..-...................

................. I - ...........

L.J EXIT EXIT < SUREYA CD co*Z oo0 EX IT----


------- S.. ................

I ........ ............................. (D 0

ERP-640, Rev. 7 Page 9 of 9 ATTACHMENT 2 UNIT 1 LAYOUT

ATTACHMENT 2 PEACH BOTTOM POWER STATION, UNITS 2 & 3 Docket Nos. 50-277 50-278 License Nos. DPR-44 DPR-56 EMERGENCY RESPONSE PROCEDURES REPORT INDEX

3/01/2002 PAGE PEACH BOTTOM ATOMIC POWER STATION PROCEDURE INDEX REPORT:

CURR DOC PROC REV EFFECTIVE RESP SYSTEM FAC TYPE TYPE PROCEDURE NUMBER NBR TITLE DATE GROUP NBR PB PROC ERP ERP-C-I1000 0006 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION/DECACTIVATION 06/25/01 PWE PB PROC ERP ERP-C-1000-1 0004 EOF ACTIVATION CHECKLIST 06/25/01 PWE PB PROC ERP ERP-C-1000-2 0003 EOF DEACTIVATION CHECKLIST 04/21/99 PWE PB PROC ERP ERP-C-1000-3 0000 EOF BUSINESS HOURS FIRST RESPONDER CHECKLIST 04/21/99 PWE PB PROC ERP ERP-C-1000-4 0000 EOF AFTER HOURS FIRST RESPONDER CHECKLIST 04/21/99 PWE PB PROC ERP ERP-C-1000-5 0000 MINIMUM STAFFING POSITIONS NECESSARY TO ACTIVATE THE EOF 06/25/01 PWE PB PROC ERP ERP-C-1100 0003 EOF STAFF AUGMENTATION- CANCELLED - REPLACED BY ERP-C-1250 09/14/94 PWE PB PROC ERP ERP-C-1200 0011 EMERGENCY REPSONSE MANAGER 06/25/01 PWE PB PROC ERP ERP-C-1200-1 0000 EMERGENCY RESPONSE MANAGER TURNOVER/BRIEFING FORM 09/14/94 PWE PB PROC ERP ERP-C-1200-2 EXH 0000 PROTECTIVE ACTION RECOMMENDATION WORKSHEET CANCELLED REPLACED BY 10/24/95 PWE ERP-C-1200 PB PROC ERP ERP-C-1200-3 0000 ERM PAR DELIVERY CHECKLIST 04/03/00 PWE PB PROC ERP ERP-C-1200-4 0000 MINIMUM STAFFING POSITIONS NECESSARY TO ACTIVATE THE EOF 03/30/01 PWE PB PROC ERP ERP-C-1210 0002 ASSISTANT EMERGENCY RESPONSE MANAGER (AERM) CANCELLED - REPLACED 10/24/95 PWE BY ERP-C-1200 PB PROC ERP ERP-C-1250 0004 EMERGENCY PREPAREDNESS COORDINATOR/EOF 06/25/01 PWE PB PROC ERP ERP-C-1250-1 0000 EMERGENCY POWER INSTRUCTIONS 09/14/94 PWE PB PROC ERP ERP-C-1250-2 0002 EMERGENCY PREPAREDNESS COORDINATOR INSTRUCTIONS FOR ASPEN 05/11/01 PWE BACKUP NOTIFICATION SYSTEM PB PROC ERP ERP-C-1250-3 0000 EMERGENCY PREPAREDNESS COORDINATOR INSTRUCTIONS TO STOP 09/14/94 PWE STAFFING PB PROC ERP ERP-C-1250-4 0000 EMERGENCY PREPAREDNESS COORDINATOR INSTUCTIONS FOR SYSTEM RESET 09/14/94 PWE PB PROC ERP ERP-C-1300 0010 EMERGENCY OPERATIONS FACILITY (EOF) DOSE ASSESSMENT TEAM LEADER 08/31/00 PWE PB PROC ERP ERP-C-1300-1 0004 DOSE ASSESSMENT TEAM LEADER (DATL) INITIAL ACTIONS 06/25/01 PWE PB PROC ERP ERP-C-1300-2 0000 DOSE ASSESSMENT TURNOVER LIST 09/23/94 PWE.

PB PROC ERP ERP-C-1300-3 0004 PROTECTIVE ACTION RECOMMENDATION WORKSHEET 03/30/01 PWE PB PROC ERP ERP-C-1300-4 0000 OFFSITE SAMPLE ANALYSIS REQUESTS 09/23/94 PWE PB PROC ERP ERP-C-1300-5 0001 DETERMINATION OF PROTECTIVE ACTION RECOMMENDATIONS (PARS) 11/02/98 PWE PB PROC ERP ERP-C-1300-6 0002 DOSE ASSESSMENT GROUP MEMBER (DAGM) INITIAL ACTIONS 06/25/01 PWE PB PROC ERP ERP-C-1300-7 0000 OBTAINING EPDS MET/RAD DATA 03/26/97 PWE PB PROC ERP ERP-C-1300-8 0000 USE OF MODE A/MODE B OF CDM 03/26/97 PWE PB PROC ERP ERP-C-1300-9 0001 OBTAINING MET DATA FROM NATIONAL WEATHER SERVICE 09/12/97 PWE PB PROC ERP ERP-C-1310 0003 EMERGENCY OPERATIONS FACILITY (EOF) DOSE ASSESSMENT GROUP 03/26/97 PWE CANCELLED - REPLACED BY ERP-C-1300 PB PROC ERP ERP-C-1310-1 0000 DOSE ASSESSMENT GROUP LEADER INITIAL ACTIONS CANCELLED 03/26/97 PWE REPLACED BY ERP-C-1300 PB PROC ERP ERP-C-1310-2 0000 OBTAINING MET DATA FROM NATIONAL WEATHER SERVICE CANCELLED 03/24/97 PWE REPLACED BY ERP-C-1300 PB PROC ERP ERP-C-1310-3 0000 OBTAINING EPDS MET/RAD DATA - CANCELLED - NO REPLACED BY 03/26/97 PWE ERP-C-1300 PB PROC ERP ERP-C-1310-4 0000 USE OF MODE A/MODE B OF CDM CANCELLED - REPLACED BY ERP-C-1300 03/26/97 PWE PB PROC ERP ERP-C-1320 0007 EMERGENCY OPERATIONS FACILITY (EOF) FIELD SURVEY GROUP LEADER 08/31/00 PWE PB PROC ERP ERP-C-1320-1 0002 FIELD SURVEY GROUP LEADER INITIAL ACTIONS 04/10/98 PWE PB PROC ERP ERP-C-1320-2 0001 FIELD SURVEY GROUP LEADER TURNOVER SHEET 03/26/97 PWE PB PROC ERP ERP-C-1320-3 0002 FIELD SURVEY GROUP LEADER DATA SHEET 08/31/00 PWE PB PROC ERP ERP-C-1400 0005 ENGINEERING SUPPORT TEAM 06/25/01 PWE PB PROC ERP ERP-C-1400-1 0002 ENGINEERING SUPPORT TEAM CHECKLIST 11/02/98 PWE PB PROC ERP ERP-C-1410 0002 CORE DAMAGE ASSESSMENT 09/09/98 PWE PB PROC ERP ERP-C-1410-1 0000 RADIOLOGICAL DATA 09/14/94 PWE PB PROC ERP ERP-C-1410-2 0001 HYDROGEN CONCENTRATION DATA 09/09/98 PWE

3/01/2002 PAGE 2 PEACH BOTTOM ATOMIC POWER STATION PROCEDURE INDEX REPORT:

CURR DOC PROC REV EFFECTIVE RESP SYSTEM FAC TYPE TYPE PROCEDURE NUMBER NBR TITLE DATE GROUP NBR PB PROC ERP ERP-C-1410-3 0001 CONTAINMENT RADIATION MONITOR DATA 09/09/98 PWE PB PROC ERP ERP-C-1410-4 0000 METAL WATER REACTION - CANCELLED NO REPLACEMENT 09/09/98 PWE PB PROC ERP ERP-C-1410-5 0002 PERCENT OF FUEL INVENTORY AIRBORNE IN THE CONTAINMENT 06/01/01 PWE VS. APPROXIMATE SOURCE AND DAMAGE ESTIMATE PB PROC ERP ERP-C-1410-6 0002 PROCEDURES FOR ESTIMATING FUEL DAMAGE BASED ON MEASURED 1-131 06/25/01 PWE AND XE-133 CONCENTRATIONS PB PROC ERP ERP-C-1500 0006 LOGISTICS SUPPORT TEAM 04/14/00 PWE PB PROC ERP ERP-C-1500-1 0001 MESSAGE AND INFORMATION INSTRUCTIONS 10/24/95 PWE PB PROC ERP ERP-C-1500-2 0001 HELICOPTER LANDING INFORMATION 10/24/95 PWE PB PROC ERP ERP-C-1900 0004 RECOVERY PHASE IMPLEMENTATION 11/02/98 PWE PB PROC ERP ERP-C-1900-1 0000 RECOVERY PHASE IMPLEMENTATION FLOW CHART 06/28/93 PWE PB PROC ERP ERP-C-1900-2 0002 PEACH BOTTOM ATOMIC POWER STATION RECOVERY ACCEPTANCE CHECKLIST 04/02/98 PWE PB PROC ERP ERP-C-1900-3 0002 LIMERICK GENERATING STATION RECOVERY ACCEPTANCE CHECKLIST 04/02/98 PWE PB PROC ERP ERP-C-1900-4 0002 RECOVERY PLAN OUTLINE 04/02/98 PWE PB PROC ERP ERP-C-1900-5 0002 ASSESSMENT CONSIDERATIONS 12/28/99 PWE PB PROC ERP ERP-101 0023 CLASSIFICATION OF EMERGENCIES 02/08/02 PWE PB PROC ERP ERP-101 BASES 0003 PBAPS EAL TECHNICAL BASIS MANUAL TABLE OF CONTENTS 02/08/02 PWE PB PROC ERP ERP-1 10 0013 EMERGENCY NOTIFICATIONS 05/11/01 PWE PB PROC ERP ERP-1 10 APP 1 0057 EMERGENCY NOTIFICATION TELEPHONE LIST 01/06/01 PWE PB PROC ERP ERP-1 10 APP 2 0024 EMERGENCY CLASSIFICATION NOTIFICATION TELEPHONE LIST FOR A SITE 07/21/93 PWE EMERGENCY OR GENERAL EMERGENCY CANCELLED - REPLACED BY ERP-110 APPENDIX 1 PB PROC ERP ERP- 120 0002 PARTIAL PLANT EVACUATION CANCELLED - REPLACED BY ERP-130 & GP-15 08/10/92 PWE PB PROC ERP ERP- 130 0018 SITE EVACUATION 11/20/01 PWE PB PROC ERP ERP-140 0019 EMERGENCY RESPONSE ORGANIZATION (ERO) CALL OUT 03/04/99 PWE PB PROC ERP ERP-140 APP 1 0019 AUTOMATED ERO ACTIVATION 08/06/98 PWE PB PROC ERP ERP- 140 APP 2 0022 ASPEN EMERGENCY MESSAGE CANCELLED - REPLACED BY ERP-110 APP 1 08/06/98 PWE PB PROC ERP ERP-140 APP 3 0022 DOSE ASSESSMENT TEAM CANCELLED - REPLACED BY PIMS PRINTOUTS 08/20/92 ISSUED MONTHLY PER RT/ERP-2 PB PROC ERP ERP-140 APP 4 0015 CHEMISTRY SAMPLING & ANALYSIS TEAM CANCELLED - REPLACED BY PIMS 08/20/92 PRINTOUTS ISSUED MONTHLY PER RT/ERP-2 PB PROC ERP ERP-140 APP 5 0014 DAMAGE REPAIR TEAM CANCELLED - REPLACED BY PIMS PRINTOUTS ISSUED 08/20/92 MONTHLY PER RT/ERP-2 PB PROC ERP ERP-140 APP 6 0013 SECURITY TEAM CANCELLED - REPLACED BY PIMS PRINTOUTS ISSUED 08/20/92 MONTHLY PER RT/ERP-2 PB PROC ERP ERP-140 APP 7 0017 PERSONNEL SAFETY TEAM CANCELLED - REPLACED BY PIMS PRINTOUTS 08/20/92 ISSUED MONTHLY PER RT/ERP-2 PB PROC ERP ERP-140 APP 8 0009 COMPANY CONSULTANTS AND CONTRACTORS CANCELLED - INCLUDED IN 08/20/92 EMERGENCY TELEPHONE DIRECTORY PB PROC ERP ERP-140 APP 9 0011 NEARBY PUBLIC AND INDUSTRIAL USERS OF DOWNSTREAM WATER CANCELLED 08/20/92

- INCLUDED IN EMERGENCY TELEPHONE DIRECTORY PB PROC ERP ERP-200 0017 EMERGENCY DIRECTOR (ED) 03/27/01 PWE PB PROC ERP ERP-200 APP 1 0005 EMERGENCY DIRECTOR CHECKLIST (MCR) 12/10/01 PWE PB PROC ERP ERP-200 APP 2 0005 EMERGENCY DIRECTOR CHECKLIST (TSC) 03/30/01 PWE PB PROC ERP ERP-200 APP 3 0004 EVENT NOTIFICATION FORM 07/10/00 PWE PB PROC ERP ERP-200 APP 4 0004 STATION PUBLIC ADDRESS ANNONCEMENTS 07/10/00 PWE PB PROC ERP ERP-200 APP 5 0005 PAR DEVELOPMENT AND ISSUANCE 04/25/01 PWE PB PROC ERP ERP-200 APP 6 0001 DOSE ASSESSMENT DATA SHEET 07/10/00 PB PROC ERP ERP-200 APP 7 0000 TURNOVER/BREIFING FORM 07/10/00 PWE PB PROC ERP ERP-200 APP 8 0000 MINIMUM STAFFING POSITIONS NECESSARY TO ACTIVATE THE TSC 03/27/01 PWE

3/01/2002 PAGE 3 PEACH BOTTOM ATOMIC POWER STATION PROCEDURE INDEX REPORT:

CURR DOC PROC REV EFFECTIVE RESP SYSTEM FAC TYPE TYPE PROCEDURE NUMBER NBR TITLE DATE GROUP NBR PB PROC ERP ERP-205 0010 EMERGENCY PREPAREDNESS COORDINATOR/TSC 03/27/01 PWE PB PROC ERP ERP-206 0008 SUPPORT SERVICES GROUP 02/07/01 PWE PB PROC ERP ERP-210 0000 TRIP TABLE COMMUNICATOR (TSC) 09/12/97 PWE PB PROC ERP ERP-220 0006 OPERATIONS GROUP 10/05/95 PWE PB PROC ERP ERP-230 0016 OPERATIONS SUPPORT CENTER (OSC) ACTIVATION 10/07/98 PWE PB PROC ERP ERP-230 APP 1 0001 PERSONNEL EXPOSURE LOG OPERATIONS SUPPORT CENTER (OSC) 11/28/95 PWE CANCELLED - NO REPLACEMENT PB PROC ERP ERP-250 0011 TECHNICAL SUPPORT CENTER (TSC) ACTIVATION CANCELLED - NO 10/14/93 REPLACEMENT PB PROC ERP ERP-300 0007 DOSE ASSESSMENT TEAM LEADER (DATL) CANCELLED - NO REPLACEMENT 09/23/94 PWE PB PROC ERP ERP-301 0006 DOSE ASSESSMENT COORDINATOR (DAC) 04/25/01 PWE PB PROC ERP ERP-305 0004 DOSE ASSESSMENT GROUP LEADER (DAGL) CANCELLED - NO REPLACEMENT 03/12/93 PB PROC ERP ERP-306 0000 LIMERICK RESPONSE FOR SHIFT DOSE ASSESSMENT PERSONNEL (SDAP) 06/30/00 PWE PB PROC ERP ERP-310 0007 DOSE ASSESSMENT GROUP CANCELLED - NO REPLACEMENT 09/23/94 PWE PB PROC ERP ERP-315 0014 OPERATION OF THE DOSE ASSESSMENT COMPUTER 04/24/00 PWE PB PROC ERP ERP-318 0001 LIQUID RELEASE DOSE CALCULATIONS AT DOWNSTREAM WATER INTAKE 06/18/93 FACILITIES CANCELLED - REPLACED BY ERP-360 PB PROC ERP ERP-319 0001 LIQUID RELEASE DOSE CALCULATIONS FOR FISH INGESTION CANCELLED 06/18/93 REPLACED BY ERP-360 PB PROC ERP ERP-325 0005 SHIFT DOSE ASSESSMENT PERSONNEL 08/25/98 PWE PB PROC ERP ERP-325 APP 1 0000 CANCELLED - REPLACED BY MESOREM PROGRAM 03/03/95 PWE PB PROC ERP ERP-330 0009 FIELD SURVEY GROUP LEADER (FSGL) CANCELLED - NO REPLACEMENT 09/23/94 PWE PB PROC ERP ERP-340 0006 FIELD SURVEY GROUP 03/19/97 PWE PB PROC ERP ERP-340 APP 1 0005 FIELD SURVEY DATA SHEET 08/29/00 PWE PB PROC ERP ERP-360 0000 RADIOACTIVE LIQUID RELEASE CANCELLED - REPLACED BY ERP-315 06/23/94 PB PROC ERP ERP-400 0006 CHEMISTRY TEAM LEADER (CTL) 01/20/00 PWE PB PROC ERP ERP-410 0009 CHEMISTRY GROUP 04/30/98 PWE PB PROC ERP ERP-410 APP 1 0000 CHEMISTRY SAMPLE CHECK-OFF LIST CANCELLED - REPLACED BY 12/11/96 PWE ERP-410 PB PROC ERP ERP-410 APP 2 0000 CHEMISTRY SAMPLE AND ANALYSIS LOG SHEETCANCELLED - REPLACED BY 12/11/96 PWE ERP-410 PB PROC ERP ERP-500 0010 SECURITY TEAM LEADER (STL) 04/24/00 PWE PB PROC ERP ERP-510 0009 PERSONNEL ACCOUNTABILITY CANCELLED - NO REPLACEMENT 11/28/95 PWE PB PROC ERP ERP-520 0005 SECURITY GROUP LEADERS 11/28/95 PWE PB PROC ERP ERP-520 APP 1 0000 UNIT 1 PERSONNEL LOG CANCELLED - NO REPLACEMENT 11/28/95 PWE PB PROC ERP ERP-600 0013 HEALTH PHYSICS TEAM LEADER (HPTL) 07/07/99 PWE PB PROC ERP ERP-610 0004 FIRST AID/SEARCH AND RESCUE GROUP CANCELLED - NO REPLACEMENT 02/05/93 PB PROC ERP ERP-620 0012 HEALTH PHYSICS GROUP 10/13/00 PWE PB PROC ERP ERP-620 APP 1 0000 HABITABILITY STATUS LOG SHEET 11/05/93 PWE 101 PB PROC ERP ERP-620 APP 2 0000 ARM STATUS LOG PB PROC 11/05/93 PWE 100 ERP ERP-620 APP 3 0002 HEALTH PHYSICS BRIEFING GUIDE 09/04/98 PWE PB PROC ERP ERP-620 APP 4 0000 ACCESS BRIEFING GUIDE CANCELLED - NO REPLACEMENT 05/08/96 PWE PB PROC ERP ERP-630 0003 DOSIMETRY, BIOASSAY, AND RESPIRATORY PROTECTION GROUP CANCELLED 03/18/93

- NO REPLACEMENT PB PROC ERP ERP-640 0007 VEHICLE AND EVACUEE CONTROL GROUP 03/01/02 PWE PB PROC ERP ERP-640 APP 1 0000 CONTAMINATED VEHICLE SURVEY FORM CANCELLED - NO REPLACEMENT 05/28/97 PWE PB PROC ERP ERP-640 APP 2 0000 UNCONTAMINATED VEHICLE FORM CANCELLED - NO REPLACEMENT 05/28/97 PWE PB PROC ERP ERP-650 0006 TRANSPORT OF CONTAMINATED INJURY OFF-SITE 11/27/96 PWE PB PROC ERP ERP-660 0007 ENTRY FOR EMERGENCY REPAIR AND OPERATIONS CANCELLED - REPLACED 07/11/94 BY ERP-620

3/01/2002 PEACH BOTTOM ATOMIC POWER STATION PAGE 4 PROCEDURE INDEX REPORT:

CURR DOC PROC REV EFFECTIVE RESP SYSTEM FAC TYPE TYPE PROCEDURE NUMBER NBR TITLE DATE GROUP NBR PB PROC ERP ERP-670 0004 EMERGENCY RADIATION EXPOSURE GUIDELINES AND CONTROLS 12/11/96 PWE PB PROC ERP ERP-680 0007 CONTROL OF THYROID BLOCKING POTASSIUM IODIDE (KI) TABLETS 09/22/00 PWE PB PROC ERP ERP-680 APP 1 0001 POTASSIUM IODIDE WORKSHEET 02/20/97 PWE PB PROC ERP ERP-680 APP 2 0000 POTASSIUM IODIDE CONSENT FORM 11/30/94 PWE PB PROC ERP ERP-680 APP 3 0001 INSTRUCTION AND RECORD SHEET FOR PERSONS RECEIVING KI 02/20/97 PWE PB PROC ERP ERP-680 APP 4 0001 KI AUTHORIZATION 02/20/97 PWE PB PROC ERP ERP-700 0010 TECHNICAL SUPPORT TEAM 09/22/00 PWE PB PROC ERP ERP-710 0008 TECHNICAL SUPPORT GROUP CANCELLED - REPLACED BY ERP-700 11/02/98 PWE PB PROC ERP ERP-800 0006 OPERATIONS SUPPORT CENTER DIRECTOR (OSC DIRECTOR) 10/07/98 PWE PB PROC ERP ERP-810 0011 MAINTENANCE TEAM 07/07/99 PWE

    • END OF REPORT **