ML23348A39414 December 2023Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve
ML23335A0721 December 2023Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump
ML23320A25416 November 2023Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump
ML23282A0026 October 2023Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump
ML23241A00225 August 2023Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils
ML23221A3703 August 2023Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0
ML23207A07614 July 2023EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06
ML22303A00431 August 2022Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali
ML22259A17326 August 2022EN 55960 - Curtiss Wright Part 21 Report Re Potential Defect in Configuration of the Quick Disconnect Connector Cable Assemblies Supplied to McGuire and Catawba Nuclear Power Stations
ML22222A0091 July 2022EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV ActuatorCommercial Grade
Loctite
ML22208A00417 June 2022Nutherm International, Inc., USNRC 10CFR Part 21 Notification Reference: Arnold Magnetics Power Supply Part Number PBM-24-106
ML22153A0797 April 202210CFR Part 21 Notification for Curtiss-Wright Supplied RCS-Dresser Actuator P/N: SURE-24-10-4
ML21294A0294 October 2021Flowserve Part 21 Notification for Limitorque Supplied DC Motor
ML20049A07511 February 2020C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries
ML19346H87312 December 2019Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21
ML19347A42610 December 2019General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C)Post Accident Monitoring
ML19317D09325 October 2019Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing
ML19087A25221 March 2019Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System
ML19091A05021 March 2019Engine Systems, Inc. 10 CFR 21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0124, Rev. 0, Excitation Transformers for Vickers Voltage Regulator System
ML19042A08025 January 2019Part 21 Report No. 10CFR21-0124-INT; Rev. 0 - Saturable Reactor (Magnetic Amplifier) for Vickers Voltage Regulator System, P/N 8408218-ESI
ML19002A20421 December 2018to Engine Systems, Inc., Part 21 Report Re Emd Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts
ML18341A2476 December 2018Mirion Technologies - 10 CFR Part 21.21 Report Re Relays Defect
ML18354A7424 December 2018Engine Systems, Inc., Submittal of 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 1OCFR21-0123, Rev. 0 - Emo Fuel and Soakback Pumps - Potentially Undertorqued Cover Bolts
ML18353A42830 November 2018Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps
ML18302A22819 October 2018Itt Enidine - USNRC 10CFR Part 21 Notification
ML18269A11212 September 2018Engine Systems, Inc. Report No. 10CFR21-0122, Rev. 0 - 10CFR21 Reporting of Defects and Non-Compliance
ML18087A00321 March 2018Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated)
ML18079A0146 March 2018Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve
ML18075A3556 March 201810 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve
ML18003A26019 December 2017Crane Nuclear, Inc. - 10 CFR Part 21 Notification of Defect on Weak Link Analysis for Chapman Gate Valve Figure L900, Item #18, Drawing CC05307, Revision BWeak link
ML17194A82511 July 2017Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge ConnectionsAnchor Darling
ML17165A4079 June 2017Part 21 Report - Defective Motor Operated Potentiometer
ML17173A1399 June 2017Engine Systems, Inc. - Transmittal of 10CFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0117, Rev. 0
ML17179A3787 June 2017TE Connectivity - Part 21 Transfer of Information TE-023
ML17114A06919 April 2017Part 21 Report - Control Rod Drive Mechanisms Contaminated with ChloridesSafe Shutdown
Pressure boundary leak
ML17114A07013 April 2017Part 21 Notification - Identified Fisher 546S Electro-Pneumatic Transducers Standard Mounting Brackets Failed Seismic Testing Standards
ML17104A28813 April 2017Emerson Process Management, LLC - Fisher Information Notice, (FIN) 2017-02
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML17026A41420 January 2017C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling
ML16328A31018 November 2016Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21Foreign Material Exclusion
ML16294A26418 October 2016Part 21 Report - Defective Current to Pressure Transducers
ML16278A47122 September 2016Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close
ML16281A27022 September 2016Part 21 - Initial Notification of Masterpact Breaker Fail to Close
ML16252A27429 August 2016Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay
ML16243A47426 August 2016Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays
ML16232A60415 August 2016Potentially Unqualified Component in Certain Allen Bradley Timing Relays
ML16238A18615 August 2016Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016
ML16209A05013 July 2016Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B
ML16196A06410 July 2016Part 21 Report - Materials Not Properly Dedicated
ML16188A37430 June 2016Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies